- 1Apollo 8 was the first mission on which human beings left_____orbit.
Hint
It is the region around Earth below the Moon's vicinity.
Answer
low Earth
Explanation
Apollo 8 was the first time human beings traveled beyond low Earth orbit.
- 2During Apollo 8, the astronauts explored the Moon from an altitude of_____kilometers.
Hint
The number is given as the altitude above the lunar surface.
Answer
110
Explanation
Apollo 8's crew explored the Moon from 110 kilometers above it.
- 3Apollo 8 demonstrated that the_____could carry astronauts beyond Earth orbit.
Hint
Think of the large launch vehicle used for Apollo missions.
Answer
Saturn V
Explanation
Apollo 8 proved that the Saturn V could carry astronauts beyond Earth orbit.
- 4Apollo 8 showed that the Apollo Command and Service module could keep astronauts alive across nearly_____kilometers of space.
Hint
The distance is described approximately rather than as an exact figure.
Answer
half a million
Explanation
The Command and Service module kept the crew alive across nearly half a million kilometers of space.
- 5Apollo 8 demonstrated that a crew could navigate to, orbit, and_____from the Moon.
Hint
The final capability completes the round trip.
Answer
return
Explanation
Apollo 8 demonstrated the ability to travel to the Moon, orbit it, and return home.
- 6Apollo 8 did not test the Lunar Module with astronauts onboard or as an independent vehicle in_____.
Hint
The missing test environment is beyond Earth's atmosphere.
Answer
space
Explanation
The Lunar Module had not yet flown crewed or been operated independently in space.
- 7Because the Lunar Module was unavailable for Apollo 8, that mission was an improvised_____mission.
Hint
This was the last-minute modification to the lettered flight plan.
Answer
C-Prime
Explanation
Apollo 8 flew the C-Prime mission: a crewed trip to the Moon in the Command and Service Module on a Saturn V.
- 8Apollo 9 was assigned the_____mission, which was intended to test the Lunar Module with a crew.
Hint
It followed the C-Prime mission in the reorganized plan.
Answer
D
Explanation
With the Lunar Module ready by early 1969, Apollo 9 could fly the D mission and test it crewed.
- 9The A mission consisted of uncrewed tests of the Saturn V and the Command and Service Module, achieved by Apollo_____and 6.
Hint
The two mission numbers were Apollo 4 and Apollo 6.
Answer
4
Explanation
Apollo 4 and Apollo 6 achieved the A mission's uncrewed Saturn V and Command and Service Module tests.
- 10The B mission tested the uncrewed Lunar Module atop the smaller Saturn IB and was achieved by Apollo_____.
Hint
It was the first Apollo mission to fly a Lunar Module.
Answer
5
Explanation
Apollo 5 achieved the B mission by conducting uncrewed Lunar Module tests atop a Saturn IB.
- 11The C mission was a crewed Low Earth Orbit flight in the Command and Service Module on a Saturn IB, achieved by Apollo_____.
Hint
This mission preceded Apollo 8.
Answer
7
Explanation
Apollo 7 achieved the C mission, testing the crewed Command and Service Module in Low Earth Orbit.
- 12The D mission required Apollo 9 to remain close to Earth and test the_____in orbit for the first time with astronauts.
Hint
It was the specialized spacecraft designed to land on the Moon.
Answer
Lunar Module
Explanation
Apollo 9 carried the Lunar Module into Earth orbit to test it with a crew.
- 13NASA reorganized its strategic flight plan after the_____fire.
Hint
This tragedy prompted a revision of the sequence of mission profiles.
Answer
Apollo 1
Explanation
After the Apollo 1 fire, NASA organized proposed mission profiles into a series of letters.
- 14NASA's lettered mission profiles were intended, if achieved in order, to get Americans onto the lunar surface before President Kennedy's_____.
Hint
It was the time limit associated with the lunar goal.
Answer
deadline
Explanation
The sequence of mission profiles was designed to meet the late President Kennedy's deadline for reaching the lunar surface.
- 15The early favorite method of reaching the Moon involved landing the entire spacecraft and was called_____.
Hint
This approach avoided splitting the landing craft from the rest of the spacecraft.
Answer
direct ascent
Explanation
Direct ascent proposed launching an enormous rocket and landing the entire spacecraft on the Moon.
- 16The approach of assembling the lunar spacecraft in Earth orbit before departing for the Moon was called_____rendezvous.
Hint
Its abbreviation is EOR.
Answer
Earth Orbit
Explanation
Earth Orbit Rendezvous, or EOR, involved assembling the lunar spacecraft in Earth orbit before sending it to the Moon.
- 17The method NASA selected in 1962 for landing on the Moon was lunar orbit rendezvous, abbreviated_____.
Hint
The abbreviation uses the initials of the method's three words.
Answer
LOR
Explanation
NASA formally settled on lunar orbit rendezvous, or LOR, in 1962.
- 18In LOR, two separate spacecraft were launched together as a_____to the Moon.
Hint
The vehicles traveled together before separating for their different roles.
Answer
stack
Explanation
LOR sent two spacecraft together as a stack; one stayed in lunar orbit while the other descended to the surface.
- 19Under LOR, the spacecraft that remained in lunar orbit waited to bring the astronauts_____.
Hint
It was the crew's return vehicle.
Answer
home
Explanation
One spacecraft remained in lunar orbit to bring the astronauts home after the lander's mission.
- 20The lunar lander would leave the lunar surface and meet the mother ship in_____.
Hint
The two vehicles reunited around the Moon.
Answer
lunar orbit
Explanation
The lander was designed to take off from the surface and rendezvous with the orbiting mother ship.
- 21A key advantage of LOR was that separating the lander allowed it to be much smaller and_____.
Hint
This reduced the amount of mass that had to be carried to the lunar surface.
Answer
lighter
Explanation
LOR simplified the landing craft by allowing it to be much smaller and lighter than a spacecraft that returned directly to Earth.
- 22The LOR plan created the critical need for the two spacecraft to find each other, rendezvous, and_____.
Hint
This operation joined the vehicles after they met.
Answer
dock
Explanation
The lander and mother ship had to rendezvous and dock so the astronauts could return to the vehicle that would take them home.
- 23If the lander and mother ship failed to reunite, the astronauts in the lander would be_____.
Hint
The lander could not return its crew to Earth on its own.
Answer
stranded
Explanation
The lander could not bring the crew home independently, and there was no rescue vehicle or backup lander.
- 24In July 1962, NASA issued requests for proposals to build the vehicle then called the Lunar_____Module.
Hint
The vehicle's original name used this word before “Module.”
Answer
Excursion
Explanation
The Lunar Module was initially known as the Lunar Excursion Module.
- 25The contract for the Lunar Excursion Module was awarded on November 7, 1962, to the_____Aircraft Engineering Corporation.
Hint
This company was experienced in building rugged aircraft for the U.S. Navy.
Answer
Grumman
Explanation
Grumman Aircraft Engineering Corporation won the contract to build the lunar vehicle.
- 26Grumman's strengths included engineering and manufacturing space, cleanroom facilities, and experience building rugged aircraft for the_____.
Hint
Its aircraft work included vehicles intended for demanding naval operations.
Answer
US Navy
Explanation
Grumman's facilities and experience building durable, dependable aircraft for the US Navy made it a strong choice.
- 27The basic Lunar Module design used two stages: a lower descent stage and an upper_____stage.
Hint
This stage carried the crew back into lunar orbit.
Answer
ascent
Explanation
The descent stage landed on the Moon; the ascent stage lifted the astronauts back into lunar orbit.
- 28The descent stage included landing legs, propellant tanks, equipment bays, and a_____engine.
Hint
Its thrust could be adjusted during descent.
Answer
throttleable
Explanation
A throttleable descent engine allowed the crew to control the landing approach.
- 29The ascent stage contained the crew cabin, controls, life support, communications, guidance systems, and a_____engine.
Hint
Unlike the descent engine, its thrust was not varied by throttling.
Answer
fixed-thrust
Explanation
The ascent stage used a fixed-thrust engine to lift the crew back into lunar orbit.
- 30The Lunar Module's seats were removed because astronauts could stand in lunar gravity and standing placed their eyes closer to the_____.
Hint
Better positioning improved the crew's view outside.
Answer
windows
Explanation
Standing let astronauts see more easily through the windows, so seats were removed.
- 31The Lunar Module's windows were made smaller because_____is heavy.
Hint
The material used to make transparent panes added mass.
Answer
glass
Explanation
Reducing window size saved weight because glass is heavy.
- 32The Lunar Module's round hatch was changed to a square one to fit the astronauts' large rectangular life-support_____.
Hint
These were worn by the crew and had a rectangular shape.
Answer
backpacks
Explanation
A square hatch better accommodated the rectangular backpacks the astronauts wore for life support.
- 33The Lunar Module did not need the aerodynamic shape of an aircraft because it would never fly through_____.
Hint
It operated only in space and around the airless Moon.
Answer
air
Explanation
The Lunar Module was not designed for atmospheric flight, so aerodynamic features could be reduced or removed.
- 34Unlike earlier American spacecraft, the Lunar Module would never reenter the atmosphere or touch an_____.
Hint
Earlier spacecraft splashed down after returning to Earth.
Answer
ocean
Explanation
The Lunar Module's entire purpose was to land on the Moon and return to lunar orbit; it would never reenter or splash down.
- 35Because each pound taken to the lunar surface required substantial launch and landing effort, weight became the enemy of almost every design_____.
Hint
Engineers had to consider mass whenever they chose how to build a component.
Answer
decision
Explanation
The mass had to be launched from Earth, sent toward the Moon, slowed into lunar orbit, and lowered to the surface, making weight a central design concern.
- 36Grumman offered engineers a cash bonus for every pound they removed from the final_____.
Hint
The incentive rewarded reducing the vehicle's mass.
Answer
design
Explanation
Grumman encouraged weight reduction by offering a bonus for each pound shaved off the final design.
- 37The landing legs used a crushable honeycomb structure that could absorb the excess kinetic energy of a hard landing, but only_____.
Hint
The shock-absorbing material was not reusable after it was crushed.
Answer
once
Explanation
The legs could stroke inward to absorb landing energy, but the crushable honeycomb structure could do so only once.
- 38The landing legs had to fold so the Lunar Module could fit inside the Saturn V's_____.
Hint
This structure housed the spacecraft during launch.
Answer
adapter
Explanation
The legs folded to fit the Lunar Module within the Saturn V's adapter.
- 39The Lunar Module cabin had to let two astronauts in bulky pressure suits work in a space barely large enough to_____.
Hint
The cabin was extremely cramped.
Answer
turn around
Explanation
The cabin was arranged to allow suited astronauts to work despite having barely enough room to turn around.
- 40The first Lunar Module to reach space was LM-1, flown without a crew on Apollo 5 in January_____.
Hint
It launched before the crewed Apollo 9 test.
Answer
1968
Explanation
LM-1 flew uncrewed on Apollo 5 in January 1968.
- 41Apollo 5 tested the Lunar Module's descent and ascent propulsion systems in_____.
Hint
The uncrewed test took place near Earth rather than at the Moon.
Answer
Earth orbit
Explanation
Apollo 5 tested LM-1's propulsion systems in Earth orbit.
- 42A critical Apollo 5 test was the staging sequence in which the ascent engine fired after separation from the_____stage.
Hint
This was the lower half of the Lunar Module.
Answer
descent
Explanation
Apollo 5 tested the ascent engine firing after the ascent stage separated from the descent stage.
- 43Although Apollo 5 did not go perfectly, it met enough major objectives that NASA decided a second_____Lunar Module test was unnecessary.
Hint
The decision concerned another flight without astronauts.
Answer
unmanned
Explanation
Apollo 5 achieved enough of its major objectives for NASA to skip a second uncrewed Lunar Module test.
- 44The Lunar Module flown on Apollo 9 was LM-3, nicknamed_____.
Hint
The crew chose a name that suited the vehicle's unusual appearance.
Answer
Spider
Explanation
LM-3 was nicknamed Spider by its crew.
- 45Apollo 9 commander James McDivitt had previously flown on Gemini 4, during which Ed White performed the first American_____.
Hint
It was an activity outside the spacecraft.
Answer
spacewalk
Explanation
Ed White performed the first American spacewalk during Gemini 4, a mission flown by McDivitt.
- 46Apollo 9 command module pilot David Scott had flown on Gemini 8 with Neil Armstrong, which achieved the first docking of two spacecraft in_____.
Hint
The vehicles joined while traveling around Earth.
Answer
orbit
Explanation
Gemini 8 achieved the first docking of two spacecraft in orbit.
- 47Gemini 8 nearly ended in disaster when a stuck thruster sent the spacecraft into a violent_____.
Hint
The spacecraft rotated uncontrollably.
Answer
spin
Explanation
A stuck thruster caused Gemini 8 to enter a violent spin, nearly ending the mission in disaster.
- 48Apollo 9 lunar module pilot Russell “Rusty” Schweickart was a spaceflight_____.
Hint
He had not flown a space mission before.
Answer
rookie
Explanation
Schweickart was a rookie, though he was assigned an important role on Apollo 9.
- 49Because Apollo 9 had two occupied spacecraft flying separately, NASA let the crew give their spacecraft_____.
Hint
These were names used to identify the vehicles during the mission.
Answer
callsigns
Explanation
NASA revived the practice of assigning callsigns because Apollo 9 involved two occupied spacecraft operating separately.
- 50The Apollo 9 Command and Service Module was nicknamed_____.
Hint
This was the callsign of the spacecraft that would carry the crew home.
Answer
Gumdrop
Explanation
The crew named the Command and Service Module Gumdrop.
- 51Apollo 9 launched on March 3, 1969, with five F-1 engines producing seven and a half million pounds of_____.
Hint
This force propelled the rocket upward.
Answer
thrust
Explanation
The five F-1 engines generated seven and a half million pounds of thrust at launch.
- 52The combined mass of the Apollo 9 crewed spacecraft placed into orbit was 48 metric_____.
Hint
This is the unit used to describe the total mass.
Answer
tons
Explanation
Apollo 9 carried a combined spacecraft mass of 48 metric tons into orbit.
- 53After entering orbit, the Command and Service Module separated from the Saturn V's S-IVB third stage, turned around, and approached the Lunar Module inside the spacecraft-lunar module_____.
Hint
The Lunar Module remained enclosed in this launch structure until its panels opened.
Answer
adapter
Explanation
Spider was still attached inside the spacecraft-lunar module adapter when the Command and Service Module turned to approach it.
- 54The Apollo 9 maneuver of transposition, docking, and extraction would be required on every Apollo lunar_____mission.
Hint
It was necessary to retrieve the lander before the crew could travel to the Moon's surface.
Answer
landing
Explanation
Transposition, docking, and extraction joined the Command and Service Module with the Lunar Module and freed it from the rocket stage; lunar landing missions depended on this maneuver.
- 55The Apollo docking system used a spike called the probe and a cone called the_____.
Hint
It was the receiving part of the probe-and-drogue arrangement.
Answer
drogue
Explanation
The CSM's probe engaged the LM's drogue to begin docking.
- 56After the probe and drogue engaged, capture latches formed a powerful_____seal between the spacecraft.
Hint
The seal prevented air from passing between the joined vehicles.
Answer
hermetic
Explanation
Retracting the probe brought the capture latches together to form a hermetic seal.
- 57Apollo's docking system enabled_____transfers, allowing the crew to pass through a tunnel between joined spacecraft.
Hint
The transfers took place inside the connected vehicles.
Answer
intravehicular
Explanation
Unlike earlier docking systems that merely joined vehicles, Apollo's system provided a passable tunnel for intravehicular transfers.
- 58After the Command Module pulled the Lunar Module free, the Saturn V's third stage was remotely commanded to restart, simulating its behavior on later lunar_____.
Hint
The test prepared the stage for future flights to the Moon.
Answer
missions
Explanation
The third stage restart simulated behavior needed on later lunar missions.
- 59Apollo 9 fired the Service Propulsion System engine multiple times to study how the docked spacecraft behaved under_____.
Hint
The engine burns pushed the joined vehicles and revealed how they responded to force.
Answer
acceleration
Explanation
The burns tested whether the docked Command and Service Module and Lunar Module would flex, vibrate, or oscillate under acceleration.
- 60Unlike the Command and Service Module, the Lunar Module generated onboard electrical power with non-chargeable_____.
Hint
They stored electrical energy but could not be recharged.
Answer
batteries
Explanation
The Lunar Module used non-chargeable batteries rather than the fuel cells used by the Command and Service Module.
- 61The early Lunar Module was designed to support two astronauts on its own for up to_____hours.
Hint
This was the stated maximum duration for the early design.
Answer
50
Explanation
The early Lunar Module could support two astronauts independently for up to 50 hours.
- 62The Lunar Module's descent engine could be adjusted to manage the astronauts' rate of descent during the final landing_____.
Hint
This is the stage immediately before touchdown.
Answer
approach
Explanation
The throttleable descent engine allowed astronauts to manage their rate of descent during the final approach to a landing.
- 63Schweickart experienced_____during Apollo 9, complicating his planned spacewalk.
Hint
It can make a person feel nauseated in microgravity.
Answer
space sickness
Explanation
Schweickart's space sickness raised concerns about safely performing the planned EVA.
- 64Schweickart's planned EVA would test the Apollo spacesuit and portable_____support system.
Hint
The system provided essential conditions for survival outside the spacecraft.
Answer
life
Explanation
The EVA was intended to demonstrate the Apollo spacesuit and portable life support system.
- 65The portable life support backpack had to provide oxygen, cooling, communications, and pressure_____.
Hint
It maintained the suit's appropriate internal pressure.
Answer
regulation
Explanation
The backpack supplied oxygen and cooling, enabled communication, and regulated pressure, functioning as a tiny spacecraft.
- 66The original EVA plan included an external transfer between the Command Module and Lunar Module in case the internal docking tunnel could not be_____.
Hint
The external route was intended as an alternative to passage through the tunnel.
Answer
used
Explanation
Schweickart was initially supposed to demonstrate that an astronaut could transfer outside between the vehicles if the docking tunnel could not be used.
- 67The EVA plan was shortened because vomiting inside a spacesuit could be dangerous or_____.
Hint
The possible consequence could be death.
Answer
fatal
Explanation
Space sickness posed a serious risk because vomiting inside a spacesuit could be fatal.
- 68Instead of completing the external transfer, Schweickart climbed onto Spider's small_____on the fourth day.
Hint
It was an exterior platform on the Lunar Module.
Answer
porch
Explanation
The shortened EVA had Schweickart step out onto the Lunar Module's small porch rather than make the full transfer.
- 69During the EVA, David Scott observed Schweickart from Gumdrop and retrieved a_____experiment from outside the spacecraft.
Hint
It was designed to study tiny particles in space.
Answer
micrometeoroid science
Explanation
Scott retrieved a micrometeoroid science experiment installed on the exterior before the flight.
- 70Apollo 9's EVA demonstrated that a human could leave the Lunar Module and remain alive, mobile, and in_____.
Hint
The astronaut could still exchange information with the crew.
Answer
communication
Explanation
The suit and backpack worked, and the EVA showed that an astronaut outside the Lunar Module could remain alive, mobile, and in communication.
- 71Apollo 9 was the first mission to fly the Lunar Module as an_____spacecraft with astronauts aboard.
Hint
The LM separated from the Command Module and operated by itself.
Answer
independent
Explanation
McDivitt and Schweickart tested the Lunar Module as an independent spacecraft while Scott remained in Gumdrop.
- 72On the fifth day, the lower Lunar Module stage, which held the landing legs and descent engine, was_____.
Hint
The stage was discarded after it had served its purpose.
Answer
jettisoned
Explanation
The descent stage was separated from the ascent stage, just as it would be left behind on the lunar surface during an actual mission.
- 73After the descent stage was jettisoned, the Lunar Module's_____engine fired to begin the rendezvous sequence.
Hint
This engine was intended to lift the crew from the Moon back into orbit.
Answer
ascent
Explanation
The ascent engine fired in space, moving McDivitt and Schweickart into a new orbit to rendezvous with Scott.
- 74Orbital rendezvous is not simply catching up: to move closer, a spacecraft may first have to_____.
Hint
Orbital movement can require counterintuitive changes in speed.
Answer
slow down
Explanation
Changing orbital speed changes position and future trajectory, so slowing down can sometimes bring a spacecraft closer to another vehicle.
- 75To rise into a higher orbit, a spacecraft must speed up, but it may then move more_____around Earth.
Hint
The relationship between altitude and orbital speed can seem counterintuitive.
Answer
slowly
Explanation
A spacecraft can speed up to reach a higher orbit and nevertheless move more slowly around Earth once it is in that orbit.
- 76During orbital rendezvous, astronauts manipulate orbital_____with small shoves and nudges rather than steering like airplane pilots.
Hint
These describe the paths followed by spacecraft in orbit.
Answer
trajectories
Explanation
Orbital maneuvers change a spacecraft's trajectory, affecting its position, time, altitude, velocity, and future position.
- 77Apollo 9 demonstrated the full crewed lunar-landing flight profile: the LM separated, maneuvered, fired both engines, staged, rendezvoused, and_____.
Hint
This final action reunited the two spacecraft.
Answer
docked
Explanation
Spider completed the essential operations of a lunar landing mission and docked with Gumdrop.
- 78After Spider docked with Gumdrop, McDivitt and Schweickart transferred back into the_____.
Hint
This was the spacecraft that would take the crew home.
Answer
Command Module
Explanation
The astronauts returned from Spider to Gumdrop, the Command Module.
- 79After the crew transferred back, Spider's ascent stage was jettisoned because its job was_____.
Hint
It had finished the tests and no longer needed to remain with the crew.
Answer
complete
Explanation
The ascent stage was discarded after the crew returned to Gumdrop and completed its role.
- 80Apollo 9 returned to Earth on March 13, 1969, after_____days in space.
Hint
The duration was a little more than one week.
Answer
ten
Explanation
Apollo 9 spent ten days in space before returning home.
- 81Before reentry, Gumdrop performed a de-orbit burn using the eighth overall SPS_____.
Hint
This was an ignition of the Service Propulsion System engine.
Answer
firing
Explanation
The de-orbit burn was the eighth Service Propulsion System firing of the mission.
- 82After the service module separated, Gumdrop reentered and landed by parachute in the_____Ocean.
Hint
The recovery ship USS Guadalcanal was nearby.
Answer
Atlantic
Explanation
The Command Module splashed down in the Atlantic Ocean within sight of the recovery ship USS Guadalcanal.
- 83Although Apollo 9 remained in Low Earth Orbit, it tested the full Apollo system, including spacecraft, docking, spacesuits, engines, guidance, procedures, and crew_____.
Hint
This refers to how the crew coordinated their actions.
Answer
choreography
Explanation
Apollo 9 tested not only hardware but also the procedures and coordinated crew actions required for lunar missions.
- 84Apollo 10 would rehearse the landing in lunar orbit, while Apollo 11 would actually touch the lunar_____.
Hint
Apollo 11 was the mission that reached the ground.
Answer
surface
Explanation
Apollo 10 rehearsed the landing in lunar orbit, and Apollo 11 made the actual lunar landing.
- 85Apollo 9 proved that two astronauts could leave the relative safety of the Command Module in a separate vehicle and come back_____.
Hint
The test had to show they could return after departing.
Answer
again
Explanation
The mission demonstrated that astronauts could fly away from the Command Module in the Lunar Module and return safely.
- 86Apollo 9's importance was as a critical rung on the lunar_____toward a successful landing.
Hint
The metaphor describes a sequence of necessary steps.
Answer
ladder
Explanation
Apollo 9 was a crucial step in the Apollo program's progress toward landing astronauts on the Moon.

Ask anything
We've read this whole study set, so questions about it get the best answers.