1. Home
  2. Explore
  3. Biology
  4. Smithsonian Gardens Webinar

Study methods

Flashcards
Quiz
Fill in the blanks
Written test
Lesson
Notes
Podcast
Content

Smithsonian Gardens Webinar

  • 32Unfamiliar
  • 0Learning
  • 0Familiar
  • 0Mastered
Topic: Biohabitats Firm Overview

What is the primary mission of Biohabitats?

32 questions

  1. 1

    What is the primary mission of Biohabitats?

    1. A

      To support ecological restoration and environmental stewardship

    2. B

      To design large-scale infrastructure projects for municipalities

    3. C

      To provide landscape architecture services for urban parks

    4. D

      To promote traditional gardening practices in residential areas

    Correct answer
    A

    To support ecological restoration and environmental stewardship

    Explanation

    Biohabitats' mission is focused on supporting ecological restoration and environmental stewardship, as stated in the presentation.

  2. 2

    Which of the following values is central to Biohabitats' work?

    1. A

      Revering wild nature

    2. B

      Maximizing paved surfaces

    3. C

      Minimizing construction costs

    4. D

      Promoting non-native species

    Correct answer
    A

    Revering wild nature

    Explanation

    Biohabitats organizes around values including 'revering wild nature' as part of their mission.

  3. 3

    Which disciplines are represented in the Biohabitats interdisciplinary team?

    1. A

      Botanists, zoologists, and geologists

    2. B

      Ecologists, hydrologists, engineers, and arborists

    3. C

      Chemists, physicists, and mathematicians

    4. D

      Architects, urban planners, and economists

    Correct answer
    B

    Ecologists, hydrologists, engineers, and arborists

    Explanation

    The team includes ecologists, hydrologists, engineers, arborists, soil scientists, and others, as mentioned.

  4. 4

    What are the three main service areas of Biohabitats?

    1. A

      Urban planning, architectural design, and construction management

    2. B

      Stormwater management, green roofs, and native landscaping

    3. C

      Conservation planning, ecological restoration, and regenerative design

    4. D

      Environmental education, policy advocacy, and community outreach

    Correct answer
    C

    Conservation planning, ecological restoration, and regenerative design

    Explanation

    The three main service areas are conservation planning, ecological restoration, and regenerative design.

  5. 5

    Why does Biohabitats have bioregional offices across the United States?

    1. A

      To focus solely on coastal projects

    2. B

      To leverage expertise in local native ecology and ecosystems

    3. C

      To reduce travel costs for employees

    4. D

      To comply with federal regulations for environmental consulting

    Correct answer
    B

    To leverage expertise in local native ecology and ecosystems

    Explanation

    Bioregional offices allow for expertise focused on that native ecology and ecosystems to inform design and consulting.

  6. 6

    What is the emerging practice area at Biohabitats?

    1. A

      Green building certification

    2. B

      Waste management consulting

    3. C

      Renewable energy planning

    4. D

      Integrated water strategies

    Correct answer
    D

    Integrated water strategies

    Explanation

    Integrated water strategies is an emerging practice area focusing on water as part of many systems.

  7. 7

    In landscape ecology, what are landscapes understood as?

    1. A

      Uniform areas with single ecosystem types

    2. B

      Organizations of patches and corridors that connect across scales

    3. C

      Human-dominated spaces only

    4. D

      Isolated habitats with no connections

    Correct answer
    B

    Organizations of patches and corridors that connect across scales

    Explanation

    Landscape ecology principles view landscapes as patches and corridors that connect across the landscape.

  8. 8

    Why is it important to look beyond project boundaries in ecological design?

    1. A

      To reduce project costs by sharing resources

    2. B

      To avoid working with neighboring properties

    3. C

      Because decisions have larger impacts on ecosystem connections and corridors

    4. D

      To ensure compliance with international treaties

    Correct answer
    C

    Because decisions have larger impacts on ecosystem connections and corridors

    Explanation

    Projects impact larger ecology, ecosystem connections, and system-wide conditions, so looking beyond boundaries is crucial.

  9. 9

    Which ecosystem services are highlighted as key outcomes of using diverse native plant palettes?

    1. A

      Food production and raw material supply

    2. B

      Pollination and seed dispersal

    3. C

      Carbon sequestration and air purification

    4. D

      Stormwater management and habitat creation

    Correct answer
    D

    Stormwater management and habitat creation

    Explanation

    The presentation focuses on stormwater management and potential habitat as ecosystem services from diverse native plant palettes.

  10. 10

    What type of native plant palette was used at the Green Streets Academy project?

    1. A

      A formal rose garden and clipped hedges

    2. B

      A restored pollinator meadow and rain gardens

    3. C

      A cactus garden and succulent borders

    4. D

      A bamboo grove and tropical plants

    Correct answer
    B

    A restored pollinator meadow and rain gardens

    Explanation

    The project included a restored pollinator meadow and rain gardens with native plants.

  11. 11

    What was a major challenge at the Philadelphia pocket park project?

    1. A

      The site was entirely paved and removing concrete was too expensive

    2. B

      The site was prone to flooding from the river

    3. C

      The site was contaminated with toxic waste

    4. D

      The site had no access for construction vehicles

    Correct answer
    A

    The site was entirely paved and removing concrete was too expensive

    Explanation

    The site was wholly paved, and removing all impervious surface would have used the entire budget.

  12. 12

    How did the Philadelphia pocket park project reuse concrete on site?

    1. A

      By selling it to local contractors

    2. B

      By creating a rubble meadow and dendritic decay gardens

    3. C

      By using it as fill for retaining walls

    4. D

      By crushing it into gravel for pathways

    Correct answer
    B

    By creating a rubble meadow and dendritic decay gardens

    Explanation

    They reused concrete by creating a rubble meadow and dendritic decay gardens, interplanting with native species.

  13. 13

    What was the purpose of the integrated wastewater treatment wetlands at Sidwell Friends School?

    1. A

      To create a habitat for endangered fish

    2. B

      To treat wastewater produced by the school

    3. C

      To provide irrigation for a vegetable garden

    4. D

      To manage stormwater from the parking lot

    Correct answer
    B

    To treat wastewater produced by the school

    Explanation

    The wetlands managed wastewater produced by the school, as part of an integrated water strategy.

  14. 14

    What design feature was used at the living shoreline project in Maryland to manage shoreline erosion?

    1. A

      Stepped wetlands

    2. B

      Sandbags

    3. C

      Concrete seawalls

    4. D

      Rock revetments

    Correct answer
    A

    Stepped wetlands

    Explanation

    They created stepped wetlands that guide water down to open water while filtering and managing erosion.

  15. 15

    What was the goal of the Savage Branch Library project?

    1. A

      To build a new wing for the library

    2. B

      To create native gardens and stormwater strategies integrated into the library entry and parking lot

    3. C

      To create a rooftop garden for staff

    4. D

      To install solar panels on the roof

    Correct answer
    B

    To create native gardens and stormwater strategies integrated into the library entry and parking lot

    Explanation

    The project involved native gardens and stormwater strategies at the library entry and parking lot.

  16. 16

    What was unique about the UNC Chapel Hill project?

    1. A

      It installed a green roof on the oldest building

    2. B

      It built a large fountain in the center of the quad

    3. C

      It daylighted a stream through the campus and created a reforested space

    4. D

      It created a formal English garden

    Correct answer
    C

    It daylighted a stream through the campus and created a reforested space

    Explanation

    The project daylighted a pipe stream and created an interactive garden and reforested space.

  17. 17

    What are the four key goals of the Anacostia River Restoration Master Plan?

    1. A

      Wildlife preservation, pollution reduction, education, and research

    2. B

      Economic development, tourism, housing, and transportation

    3. C

      Flood control, irrigation, hydroelectric power, and recreation

    4. D

      Enhancing resiliency, restoring habitat, improving water quality, and enhancing public access

    Correct answer
    D

    Enhancing resiliency, restoring habitat, improving water quality, and enhancing public access

    Explanation

    The four goals are enhancing resiliency, restoring habitat, improving water quality, and enhancing public access and recreation.

  18. 18

    What method was used in the first phase of the Anacostia River project to identify opportunity zones?

    1. A

      Historical document review

    2. B

      On-site surveys of flora and fauna

    3. C

      Interviews with local politicians

    4. D

      Data analysis with GIS and public engagement

    Correct answer
    D

    Data analysis with GIS and public engagement

    Explanation

    Phase one used data analysis with GIS and public engagement to understand opportunity zones.

  19. 19

    What did the community feedback in the Anacostia project reveal as priorities?

    1. A

      More parking lots and commercial development

    2. B

      Water quality, habitat, and safe access to the river

    3. C

      Removal of all vegetation along the river

    4. D

      Construction of high-rise apartments

    Correct answer
    B

    Water quality, habitat, and safe access to the river

    Explanation

    Community priorities included water quality, habitat, and safe access for recreation and enjoyment.

  20. 20

    Which sensory activity was used in the Atlanta urban ecology framework project to engage the community?

    1. A

      Tasting local honey from urban beehives

    2. B

      Smelling jars of plants and soils from natural areas

    3. C

      Touching different types of tree bark

    4. D

      Listening to recordings of bird calls

    Correct answer
    B

    Smelling jars of plants and soils from natural areas

    Explanation

    They had jars with plants and soils for people to smell, as part of sensory engagement.

  21. 21

    What is the recommended approach to dealing with lawns when converting to native landscapes?

    1. A

      Use artificial turf instead of native plants

    2. B

      Only convert lawns if neighbors agree

    3. C

      Provide visual cues of maintenance, such as an edge between lawn and new planting

    4. D

      Remove all lawns entirely without any transition

    Correct answer
    C

    Provide visual cues of maintenance, such as an edge between lawn and new planting

    Explanation

    Joan Nassauer's work suggests visual cues like an edge show intentional maintenance of wild-looking landscapes.

  22. 22

    How can controlled burns be used in ecological restoration?

    1. A

      To warm the soil for early planting

    2. B

      To create charcoal for soil amendment

    3. C

      To kill all existing vegetation permanently

    4. D

      To clear a site and release native seed banks

    Correct answer
    D

    To clear a site and release native seed banks

    Explanation

    Controlled burns can clear a site and sometimes release native seed banks, but must be done within municipal rules.

  23. 23

    What is a key consideration for trail lighting in restored landscapes?

    1. A

      Minimizing light impact on dark sky and wildlife habitat

    2. B

      Using bright lights for safety at all times

    3. C

      Placing lights directly on animal paths

    4. D

      Installing lights only during nesting seasons

    Correct answer
    A

    Minimizing light impact on dark sky and wildlife habitat

    Explanation

    Lighting should be mindful of dark sky and habitat needs of animals, especially migrants who rely on moon cycles.

  24. 24

    Why is fragmentation a concern in landscape ecology?

    1. A

      It increases the total habitat area

    2. B

      It reduces human impact on nature

    3. C

      It allows more species to coexist

    4. D

      It creates smaller patches with less core area for sensitive species

    Correct answer
    D

    It creates smaller patches with less core area for sensitive species

    Explanation

    Fragmentation leads to tiny pieces with less core area, affecting sensitive species that need interior habitat.

  25. 25

    What was a strategy used to manage invasive species at the Philadelphia pocket park?

    1. A

      Introducing non-native predators to control invasives

    2. B

      Spot treatment with specific herbicides and careful monitoring

    3. C

      Allowing invasives to remain as part of the design

    4. D

      Complete removal of all soil and replacement with sterile mix

    Correct answer
    B

    Spot treatment with specific herbicides and careful monitoring

    Explanation

    They conducted a full invasive clearing before construction and used spot treatment with herbicides, applied carefully due to proximity to river.

  26. 26

    What is one way to incorporate habitat for species like the Karner blue butterfly in a design?

    1. A

      Install butterfly houses throughout the site

    2. B

      Provide a minimum of 10 acres of intact meadow with trails around the perimeter

    3. C

      Plant only the butterfly's host plant in containers

    4. D

      Create small scattered patches of flowers

    Correct answer
    B

    Provide a minimum of 10 acres of intact meadow with trails around the perimeter

    Explanation

    The Karner blue butterfly requires at least 10 acres of meadow habitat, with trails around it to avoid intrusion.

  27. 27

    What is the role of the public engagement in the Anacostia River project?

    1. A

      To fund the project through donations

    2. B

      To inform residents about upcoming construction delays

    3. C

      To gather insight from community members about their needs and knowledge of the river

    4. D

      To select the design team for the project

    Correct answer
    C

    To gather insight from community members about their needs and knowledge of the river

    Explanation

    Public engagement was used to survey community needs and understand their knowledge of the river's ecology and history.

  28. 28

    Which of the following is a key principle of the Biohabitats approach to design?

    1. A

      Centering ecology and biodiversity in planning and design

    2. B

      Prioritizing aesthetics over ecological function

    3. C

      Using only non-native plants for ease of maintenance

    4. D

      Focusing solely on human needs

    Correct answer
    A

    Centering ecology and biodiversity in planning and design

    Explanation

    The presentation emphasizes centering ecology and biodiversity in planning and design projects.

  29. 29

    What happened at the Green Streets Academy after the native meadow was planted?

    1. A

      Students were involved in the planting day and continue to maintain it

    2. B

      The area was mowed regularly to keep it tidy

    3. C

      It was converted back to turf after one season

    4. D

      It became a parking lot for the school

    Correct answer
    A

    Students were involved in the planting day and continue to maintain it

    Explanation

    Students did the planting day and are involved; the meadow continues to shift and regenerate.

  30. 30

    How did the Philadelphia pocket park designers decide on the plant palette for the rubble meadow?

    1. A

      They selected invasive species to outcompete others

    2. B

      They planted a monoculture of one grass species

    3. C

      They used only wetland plants to absorb stormwater

    4. D

      They chose hardy upland species that could tolerate dry, hot conditions

    Correct answer
    D

    They chose hardy upland species that could tolerate dry, hot conditions

    Explanation

    Plants needed to be hardy, tolerate dry conditions and high evapotranspiration, and were more upland species.

  31. 31

    What is the significance of the 'queues' concept by Joan Nassauer in landscape design?

    1. A

      Audio cues like bird calls indicate healthy ecosystems

    2. B

      Tactile cues like rough bark discourage human interaction

    3. C

      Olfactory cues like flower scents attract pollinators

    4. D

      Visual cues like mown edges indicate that wild-looking landscapes are intentionally maintained

    Correct answer
    D

    Visual cues like mown edges indicate that wild-looking landscapes are intentionally maintained

    Explanation

    Nassauer's work shows that visual cues such as a mown edge signal that a native landscape is intentionally designed and maintained.

  32. 32

    What constraint did the designers face with the Philadelphia pocket park site's underlying structure?

    1. A

      The site had a high water table that required drainage

    2. B

      The site was on a deck over the river, not solid soil

    3. C

      The site was a designated historical landmark

    4. D

      The site was contaminated with asbestos

    Correct answer
    B

    The site was on a deck over the river, not solid soil

    Explanation

    The site was actually decking over the river, so there wasn't solid soil below the paving in some areas.

Question 1 of 32
Question 1 of 32

Ask anything

We've read this whole study set, so questions about it get the best answers.

FlashcardsQuizFill in the blanksWritten testLessonNotesPodcastContent