Corporate Energy Decisions

Transcript

The following content is provided under a creative commons license. Your support will help MIT OpenCourseWare continue to offer high quality educational resources for free. To make a donation or view additional materials from hundreds of MIT courses, visit MIT OpenCourseWare at ocw.mit.edu. RICHARD SCHMALENSEE: I want to say a little bit about Hexion to relate to where we are today and then do biodiesel, which is a great case. Obviously if Darren were making his own decision, if Darren were the CEO or Darren owned the company, then his decision to use combined heat and power to generate would reflect his preferences, whatever they happen to be. And if Darren was consistent over time, you could predict Darren's decisions from his past decisions. But it's a committee.

And the case doesn't go into-- in my modification, the case didn't really go into who was on that committee and who the doubters are. But it's clear he had to get by a group of people. And there's no guarantee that a group of people is consistent. They had different questions. You could read into those questions different preferences about downtime, different worries about bonuses.

You couldn't really tell-- again, you'd have to have a lot more than the questions they asked or the objections they posed to predict what the decision would be. It sounds like Darren would have just run the spreadsheet and done it. But others, who knows? The terms that Cohen, March, & Olson use, this is a group with problematic preferences. And groups have problematic preferences. There's no reason in principle why groups are consistent in making decisions.

You may recall we did this voting paradox thing some time ago where if I have preferences arranged correctly, I can get any decision I want by deciding which pairs you consider first. So there's no reason that a group would be consistent. And in fact, if you think about just that committee, you'd like to know who shows up, you'd like to know what arguments are made, you'd like to know who's prepared, you'd like to know what other items are on the agenda. If you've been in committees, you know how this works. Sometimes somebody will lose an argument. And to keep that person on board, they get to win the next one, et cetera, et cetera. So Cohen, March, and Olsen talk about problematic preferences in organized anarchiies like universities. The only point I want to make here is that if you think about Hexion, and you think about Darren trying to get this project approved through some kind of committee, that story holds--

who shows up, what are they interested in, what are their motivations, how prepared are they, what other issues are up that day. You can't assume consistency, and you may not be able to predict decisions. So we're going to see some of this, and we're going to see some other features. We'll see this, and we'll also see some other things in biodiesel which has to do with a more complicated and presumably anarchic organization-- us. So the story you all know, a student-led group, simple goal,

you take the used cooking oil and convert it into diesel fuel to replace the diesel-- save the reprocessing cost and use it in tech shuttles, other equipment. Lots of diesel engines around campus. I assume you've all read the case. There is a short video that's actually-- if I can get it to work, it's sort of a nice description told by the participants. And I'm going to refer back to this. [VIDEO PLAYBACK] - Animal, so animal weight. - The whole biodiesel from used vegetable oil

is definitely a good idea because it reduces waste as well as creates a useful product. - Biodiesel MIT, the student-run organization that's been working to get a biodiesel processor installed on campus is going to take the used vegetable oil from campus dining from fryolators and all that kind of stuff and convert it into fuel for the tech shuttles on campus. RICHARD SCHMALENSEE: This was made in 2010, this video. - So the smell of French fries [INAUDIBLE].. - I got involved because I heard about biodiesel. I was working in renewable energy. - I heard they were looking for someone to do some testing. - When I got here as a freshman, I was really looking for some sort of energy and [INAUDIBLE] environmental initiative. - I joined the group actually as the website manager. - They needed me to find them help. So, I figured I have the skill set to help with the project. - I tried from the beginning to say this is not a research problem.

It is an implementation problem. [CLASSICAL MUSIC PLAYING] - The group had been told, if you get funding, it'll be easier. - The project's going to pay for itself within a year. - We also wrote up a proposal for the mtvU GE Eco-imagination Challenge. The charismatic view from mtvU came in first. And they had balloons, they had this giant check. I had to go take a math test after that. The administration had theoretically supported the project. - You can parallel this as people in a community going to government and saying, we have the solution. We just need a place for it, and maybe incentives, economic incentive. - I really didn't think it would take that much time because the group had just won $25,000.

- But we had no experience with implementation. We have no experience in policy. - We still didn't have space. We still didn't have a processor. There wasn't really anything tangible that people could see. So we lost a lot of, I guess, recognition and student support. - We had the technical problem solved, so we thought everything else was easy. This experience actually taught me that it's actually the other way around. So even if you have the technology, if it's not going to be implemented

by the government or the administration, nothing's going to happen. - So we got to a point at the very end of the Spring semester in 2008 where the administrative organization that had been helping us look for space basically just said our least expensive may turn out like $160,000 in renovation. This is really just infeasible. We're going to stop looking for space for you. And I'm sorry, we can help you. So we agreed that we would terminate the group. - We came to a conclusion after a lot of struggling, especially because it seemed at the point that all the effort was wasted. - There's actually, like immediately calling that, a huge student uprising of support. Three or four days later, we get a call from the Kennedy [INAUDIBLE]. And practically Facilities was all like, hey, we can get back again. We found you space this time. This is Biodiesel@MIT's biodiesel processor. - Being part of the group has helped

me realize how important the politics of it all can be. - I'm so convinced that the policy is more important. - It's just pushed me to a minor in policy. - Putting different groups of people together always produced pretty good results. - There have to be first members. - Even if you have a good idea, it doesn't really matter if you have to change the way people do things. - But after Biodiesel@MIT, I know that people will be able to do things like this much more easily. [MUSIC PLAYING]

[END PLAYBACK] RICHARD SCHMALENSEE: OK. The group's website doesn't seem to have been touched since last summer, so I don't know what its current status is. But they did manage to produce fuel. So I'll just run lightly through the history because I want to spend some time on the discussion. Did that raise any questions vis-a-vis the case, by the way? Is that pretty clear? The first time we taught this case, Sara presented it, so nice to see her again. So they talked to the administration

and they were told, if you have dollars and space, why, that's great. They won this award, they looked for space from the full of 2007 through the spring of 2008, they gave up, space was found, and they installed the process. So they actually did produce fuel. And at least according to the website, it's in use, or was in use, at least as of last summer. So there it is.

It's a nice project if you think about it. From the MIT point of view, it's got some research. Somebody had to do the cost analysis. They had to get this stuff tested. They had to get the system work. They had to design the logistics, a lot of interesting things, good photos. It comes out a little murky you will see, but it can be made usable. But it took a long time. And you got the frustration in that video. And I hope you got the frustration in the case.

A project that seemed like such a good thing, and the case goes on, it saves energy, it's clean burning, it's swell, it took a long time. So I want to talk about, and we will talk at some length about why that happened because I think this really is a good case in terms of what it takes to make organizations change, that's what this is about, and why they don't. So the conventional explanation, and you could see it in Sara's face was, gee, if only

you'd been a better leader, if only, if only, if only. The whole Women in Science Initiative here a few years ago really did have a big impact, really did change things. How come that worked? How come that went off right away and this didn't? The alternative might be that there was something about the organization. And it wasn't a matter of better or worse leadership. It was a matter of strategy running up against organizational problems. So I think there are more things in the story.

What we got in the case, and what you get in the video, is they tried real hard, they gave up, and then suddenly the space was found. And it's got to be more complicated than that. So we think-- I think context is really important. So let's walk through a little bit of this. So in the video, Sara talks about "and we talk to the administration and the administration was supportive." And you hear, that, you hear people talk about large organizations in the singular a lot.

BP does this, Goldman Sachs does that. The administration does one thing and another. Well, it's not a black box. It's a set of people. That's just the top set. That's the top layer. And there are rules. That shows reporting relationships, who reports up through the provost, who reports up through the chancellor, who reports up through the executive vice president and treasurer, a little dotted line responsibility here from Israel, a Sloan graduate. She's a Sloan graduate, but never mind.

If you look at MIT, there's a formal hierarchy. I'll show you some more organization charts. People report to people, particularly outside the faculty realm, particularly in the staff side of the operation, which is what they were largely dealing with. They're specialized responsibilities. Different people have different jobs, different things they're judged on. And they're a set of rules, formal, informal, but mostly formal rules and procedures about how we do things.

You can go on the MIT website, and you can get the rules and regulations of the faculty. You can get a document called Policies and Procedures that lays out a lot. In various other places, there are sets of rules deep into organizations. I mean, it's a bureaucracy. That's not-- that's a technical term, an organization that has all of those things. Most large organizations have to be bureaucracies to get things done. You got to have hierarchies and reporting responsibilities, and you've got to divide responsibility, and you've got to have some rules for how we do stuff. That makes for efficiency. It doesn't make for change.

There are also a set of informal rules. Who votes with whom? Who talks to whom? Who supports whom? What are the communication channels in this complicated entity? So, whenever you think about changing an organization or about how an organization behaves, you got to think about it in the plural. It's a set of people, it's a set of relationships, it's a set of rules, a set of responsibilities. And here are-- oh, yeah, let's go to the next one. So this is a description--

I'm not quite sure where it's from-- of what Biodiesel@MIT does. They work with-- they have to work with Campus Dining, Facilities, Environmental Health and Safety, MBP Bioenergy, I think, was the reactor supplier, and the Energy Initiative. And it's designed to do some training and to make biodiesel. That's sort of where this organization has to be situated, has to get space, has to pass Environmental Health and Safety because things can go wrong with the reaction.

And you've got a lot of material around. The Energy Initiative, not so clear. Health and Safety, yeah. Campus Dining to get the fuel. Lots of places. Who was the most troublesome from the case? What parts? Max. MAX: --trying to find them space. RICHARD SCHMALENSEE: That was the CRSP, the Committee for Review of Space Planning. Anybody else troublesome? Scott. SCOTT: Also the Health and Safety, it was a lot of different back and forth. RICHARD SCHMALENSEE: Health and Safety. Anybody else? Yeah.

AUDIENCE: They said something about the janitorial service. RICHARD SCHMALENSEE: That's facilities basically, yup. AUDIENCE: And there were members that were in class familiar with isolating systems. RICHARD SCHMALENSEE: OK. Let's unpack it a little bit. Let's see, Facilities and Environmental Health and Safety report up through the executive vice president and treasurer. We can see them there. This unpacks the organization from the website. There's Facilities, there's the Environmental Health and Safety reporting up through the executive vice president and treasurer. What are their day jobs? What's Environmental Health and Safety's day job? What are they mostly concerned with? They don't exist to provide space for student activities. What do they exist to do? Jacob. JACOB: I know they do a lot of safety training for people for different labs and students who are working [INAUDIBLE]. RICHARD SCHMALENSEE: So their job

is to prevent accidents, and incidents, and hazards. They do training. They also work with people to make sure they're in compliance with a variety of regulations and try to instill best practices to make the place safe. They want to reduce risk. They want to reduce risk. What about Facilities? What's its main job? What's its day job? Again-- yeah, Columbus. COLUMBUS: To make sure that the physical buildings are operating correctly. RICHARD SCHMALENSEE: That the physical plant runs,

that it's clean, that it's warm when it needs to be warm, that it's cool when it needs to be cool, that the plumbing works, the electricity works, things are clean and landscaped and all that. They're concerned with the physical plant, keeping it going. OK, CRSP, CRSP is a more complicated story. Sorry, that's the acronym. The space planners are a more complicated story. But just to give you a sense, here's-- what do I have first? Here's Facilities.

So Facilities-- I don't have people down there. But there are people in all these boxes. That's what Facilities looks like, worrying about the utilities, worrying about security, janitorial services, grounds, making sure the mail gets delivered, and a whole lot of overhead. That's the planning, building new construction, renovation, and so forth. A fairly complicated organization, not unusually complicated for an institution this size, but fairly complicated. And lots of people.

And everybody's got a job. Whoever these folks are, they worry about getting the mail delivered. And these folks worry about the grounds and landscaping. That's their job. That's how they're evaluated. And you don't see a provide lab space for students. Not their job. Environmental Health and Safety-- you have to have an MIT certificate to get this org chart, which I don't quite understand. But I had to type in a bunch of credentials twice to get it. But there's Environmental Health and Safety. You got folks worried about the reactor, a variety of other responsibilities, some technicians out here. A whole set of people concerned with minimizing risk. So these are simple, focused organizations.

So when Sara talks about "the administration," we talked to the administration, the first question is, who, who did you talk to? What was that person's role in the hierarchy? What was their responsibility? What rules were they operating under? And how are they judged? Now, let me come to the really interesting one. This is CRSP. I have to tell you in nine years as dean, I never actually knew who was all on CRSP. But CRSP was like one of--

I can't remember whether it was a Carter advisor or a Clinton advisor who said, when I die, I want to come back as the bond market because everybody's afraid of the bond market. Well, I'd like to come back as CRSP because everybody's afraid of CRSP. At MIT, space isn't priced. Departments, labs, don't rent space. Space is allocated. But space is a status symbol. If you're running a lab, you want to have a lot of space because that means you're active, you're busy.

I mean, those of us who work at our desks, we're out of this game. But in most of MIT, space is a status symbol, and CRSP allocates space. CRSP is a nice illustration, its processes, of the garbage can model. First, CRSP deals with proposed solutions. And this is a characteristic of lots of entities and lots of organizations. How can Congress, when it decides to actually do something, get legislation written in a hurry? Because somebody's drafted it, somebody's got the answer.

They're just waiting for the right question, just waiting for the right question. Some years ago when Rush was moved from September to later in the year, that was a proposal acted on. There was no problem definition from which that emerged as the optimal solution. This is a very standard mode of operation of organizations. There are solutions. If you want to actually think about another university example, many colleges and universities around the country

have abolished their Greek systems over time. Was that the optimal solution to a carefully defined problem? No, it was a solution that people put forward, a proposal that people put forward that was evaluated. So CRSP acts only on proposed solutions, only on "I need to do this with this space because," not-- and you can see why. You can't sit down-- they process many requests with great regularity. Particularly this renovations subcommittee, which is what's at interest here,

meets twice a month, every other week, and processes dozens of requests of various sizes, dozens of requests. You can't say, is this the absolute best way to meet this need? It's like, is this OK? Does this work? Can we do this? Fluid participation was a characteristic of the garbage can model. Well, look at all those people. Does everybody come to every meeting? Probably not. Is everybody thoroughly prepared on every issue? Probably not. Does everybody care passionately about every issue?

Probably not. And everybody's got, with one or two exceptions, has got a day job, has got a day job. So, exactly who's active in making a decision is going to vary. It's going to vary. So if you want to affect it-- if you want to affect a decision, you'd like to make sure that there's somebody in the room on your side when the decision is made. You don't just-- and this is how you deal with Congress, right? You don't just make a great proposal to Congress. You go talk to people.

You go talk to people on the committee, and you say, here's why this is important. OK, fluid participation. Who makes the decision varies. Problematic preferences. We know CRSP is not consistent over time. We know it from the case. We know it from life. The case illustrates it nicely. Can't find you space, it's going to cost $160,000, boom, here it is, we found it. A miracle. A miracle. The other thing, unclear technology. By "technology" they mean the decision-making process. And if you say to somebody, well, how come this project got approved and this project didn't, you will hear the argument that was made for or against. That's not necessarily why. That's the argument that rationalizes the decision. In any group like this, particularly when the objectives aren't clear-- x wants $20,000 to renovate the lab. Is that a good deal or a bad deal?

Well, it's not like we're trying to maximize profit here. We're trying to-- who knows, MIT has a complicated set of objectives involving research and education. But almost everything that's proposed will contribute to research and education. So which ones can you fund? Well, exactly how those choices get made is obscure. It has to be obscure. If you ask the people to describe it, it would be obscure. That's a lot of people in a room dealing with a lot of information, again, not atypical.

So when Daniel says, well it's politics, well, yeah, but that doesn't help you figure out what to do. It's politics in the sense that there are people making a decision for other people. So in a very broad sense, I use politics-- at the start of the semester, it's politics. It's a collective decision. But if you wanted to do a better job, you would want to do more than treat the administration as a black box. And you would want to do more than say, well, what goes on in here is politics.

Yeah, OK, what kind of politics? Who? Why? What interests are people serving? So this is the background. I want to spend some time, and a good deal of time if we can, on what happened, what happened and why? Why did it take so long? Was this a bad project? Is this project inconsistent with the kinds of stuff MIT tries to do? You're shaking your head, David. Not inconsistent. Good values. DAVID: [INAUDIBLE] President Hockfield at that point of time had stressed the MITEI initiative. RICHARD SCHMALENSEE: Yeah. And they have 50 faculty members, MITEI support.

This I think is the key question. How come 50 faculty members, MITEI support, consistency with MIT values didn't move this thing off the dime for all that time? Andrew. ANDREW: Because everybody's not responsible for actually making the decisions. Ultimately they first saw the [INAUDIBLE] concern. RICHARD SCHMALENSEE: OK. ANDREW: It falls to their responsibility to change [INAUDIBLE]. RICHARD SCHMALENSEE: So all those supporters didn't have the power to move it. Point. Sam.

SAM: I think just the biggest issue is the back end. What the group planned to do, it'd affect so many different operations. They would need to get the Dining Hall on their side, Facilities to help them move the grease. They'd need to get the OK from Facilities to actually use the biodiesel in their vehicles. They need to get the space from the administration. So it just encompasses so many different areas. And that's like five or six different like sub-bureaucracies you have to deal with. RICHARD SCHMALENSEE: But you didn't hear the Dining Hall objecting. The main objection-- the main objection was between Facilities, and Environmental Health and Safety, and space. SAM: Well, they did have most at stake. All the Dining had to do is say, OK, we'll leave our grease on this back porch. And Facilities, they had to be the one to move it, bring it over to wherever the space was, pick up the finished biodiesel, figure out how they're actually going to put it in the shuttle.

I mean, it's the most work for them. So that explains why they were most hesitant. RICHARD SCHMALENSEE: Well, explain why, because this is consistent with MIT values thing, and it's a good MIT thing. And the students probably would have volunteered to handle the legwork of moving it. I don't think we're talking that much bulk. Blending it is going to be an issue. But blending is blending. You could probably do it simply enough. But then you notice all of a sudden [SNAP OF FINGERS] it happened.

All of a sudden they got the space, the reactor was bought, and they were moving forward. So what you're saying was Facilities resisted. Why? What was it to Facilities-- well, go ahead. SAM: I mean like in Facilities [INAUDIBLE] was like changing people's responsibilities, which I think people, like it you've been a role for a while, and you're comfortable with that job, somebody says, oh, we're going to have to implement this completely new system , we're going to balk. RICHARD SCHMALENSEE: OK. So for Facilities they added to their day job. Christopher. CHRISTOPHER: I mean, I think you have to define support, too. I think any faculty member would be willing to say, hey, that's a great idea. But is it worth it to them to actually go out and do something about it? Like for Facilities, to get their support, it has to be worth their time and their money. RICHARD SCHMALENSEE: So there has to be something in it for them because they have the ability to block, don't they? CHRISTOPHER: Yeah.

Like if there was a Professor that had a research interest and vested in this, then he might be more willing to try and find some space or vouch for them with CRSP or something like that. RICHARD SCHMALENSEE: Well that actually comes to the next one. What kind of entity is this? It wasn't a professor's lab, was it? It wasn't a live-in group, it wasn't an administrative unit, it wasn't a department. What kind of creature was it? You had your hand up, Alexandra. ALEXANDRA: Oh, I was going-- can I say something? RICHARD SCHMALENSEE: Yeah, of course. ALEXANDRA: So-- wait. [INAUDIBLE] RICHARD SCHMALENSEE: Hold that thought. I'll go with Julian. I'm sorry. JULIAN: It's a student organization, right? RICHARD SCHMALENSEE: It's a student organization. But most student organizations don't handle potentially flammable equipment that could do various kinds of damage, don't take up-- don't need to interact-- it's a student organization, but it's kind of different.

JULIAN: It is a different student organization. So because of that, you have to take into account like practicality, where are they going to get space? It's not like they think they're going to Walker Memorial and whatnot. Also, most student organizations don't actually have a space of their own. So it's kind of a zero sum game. Everyone's fighting over equal space. RICHARD SCHMALENSEE: Yeah. JULIAN: And not everyone is moving out of your space. And, of course, MIT-- it's highly sought over to have space at MIT. So, I mean, realistically they're not going to be able to move in until someone else moves out. RICHARD SCHMALENSEE: Or unless CRSP decides they're very important because faculty members expand their labs all the time. And space is zero sum. Logan. LOGAN: I would say that a lot of the difficulty stems from the fact that it's spanned across a lot of different types of organizations. And there are [INAUDIBLE] is everyone listed up there,

including some others, like transportation and stuff like that. RICHARD SCHMALENSEE: Alexandra, good to go? OK. ALEXANDRA: What I was going to say is like, the fact that, as he said, spans across so many different departments, as well as a lot of those departments, their goal is not necessarily to make biodiesel work. So maybe it works with MIT's general idea, but Facilities wants to maintain buildings. So add-- the MIT@Biodiesel group probably adds to their responsibilities.

And also now the space group has to talk about this. And maybe they don't actually want to spend time if like no one really cares. So probably it seems to me what happened was maybe the student group wasn't pushing hard enough for it or didn't know how you go about talking to people. And then they quit, and then everyone else was like, oh my gosh, don't quit! And then-- RICHARD SCHMALENSEE: But we're going to come to that because that's a very important part of the story. I don't know who was first here, Ryan? We'll get all three of you. RYAN: I was the last one. But-- RICHARD SCHMALENSEE: Well, that's not fair. Erica. No, go ahead. RYAN: Well, I was just going to say that I think that part of the problem was that MIT and many other places just made the bureaucracy too complicated. Instead of actually deciding on to do anything, they usually have a meeting to decide a committee to decide something. So I would say that the reason it didn't get through

was partially their fault because they didn't know who to go to, but it's also partially the fault that bureaucracy has evolved into this monster that's hard to get through. RICHARD SCHMALENSEE: Well-- but to be fair, this is not some kind of terrible thing. And it's not, compared to other universities, particularly bureaucratic. It's that if you want to run a place this complicated, you have to have a hierarchy, and a division of authority, and a set of rules. Everybody's got a Facilities department. Everybody's got Environmental Health and Safety. Everybody has to have a process for assigning space. So those three entities have to exist in some form. So I wouldn't say MIT's an example of out-of-control bureaucracy. It seems like that occasionally when I try to get something done. But looked at objectively, I don't think-- it's really good at doing, it's not good at changing. That's the way all these are. Steven.

STEVEN: Well, the first thing I was going to comment on was that when you say that the faculty support and values weren't sufficient, it's not that they weren't sufficient, it's that it's easy to gain support from people and bodies that don't necessarily have to make the sacrifices in order to implement those types of changes. So that way with the Facilities and the Health and Safety groups, they actually have to sacrifice other groups and other possible issues in order to take care of this initiative. And also the fact about space, I don't know a lot about CRSP, but I know with certain other organizations when they're assigning spaces, they'll do it at a specific point once every year, that way they review all the different allocations of spacing, whether it be rooms in the Student Center or other places on campus and say, all right, you can use this space, or this group is getting this space now. So I'm not sure if maybe CRSP, for instance,

says like at the beginning of the, year they can re-assign different lab spaces, different locations for other groups as well. RICHARD SCHMALENSEE: No, they operate more flexibly than that. Renovations-- that renovations committee met every two weeks, and the body itself met monthly. So if you're going to put in a big request, like we want to build this building, it may go through CRSP, but it ultimately goes to the president. But for medium-sized things, they get decided on a pretty regular cycle because you don't want to wait a year. You have a big-- you've got a big grant, it requires you to install some equipment, you don't want to sit around and wait for a year to get the project going. So it operates pretty regularly. Erica. You were probably first, huh? STEVEN: Yeah. ERICA: I think there's a lot of, like, instability, I guess in the process or uncertainty because I think when they first got the GE Eco-imagination grant,

and they are thinking, oh, it's going to take $35,000 I think was the number-- RICHARD SCHMALENSEE: Something like that. ERICA: --and it ballooned up to $137,000 and came back down to like-- RICHARD SCHMALENSEE: Came back down. Isn't that a miracle? Yeah. ERICA: But all the costs that piled up, this was not only like, oh, it's a big cost. Now it's also an indication that they didn't realize how far things were going to go. And so when you think, OK, it's not even what, 35,000, and they think they know what we're doing, and then all these other things start piling up-- RICHARD SCHMALENSEE: Then they get overwhelmed. ERICA: Yeah, overwhelming, and it's harder to support when you don't know what the [INAUDIBLE] is. RICHARD SCHMALENSEE: That's true. That's true. It's hard-- they had faculty support, which a number of people have pointed out, is really pretty cheap and fairly useless for many things. But for this one, where you had to deal with the staff, quite useless.

David. DAVID: I was just going to say I think it's important to realize that the people who are in charge of these communities are gatekeepers, not necessarily stakeholders in the project. So for them to say no to something is to minimize their risk because if something doesn't go forward, they're really not on the line for it unless there's public attention drawn to their decision, which is what happened. And then they had a choice to make. There was we do it and we deal with the consequences, or we don't do it and deal with the consequences, as opposed to doing it and possibly dealing with a fire, or explosion, or something expensive down the line, or not doing it and then it fizzles out and dies and no one knows about it. RICHARD SCHMALENSEE: Well, I want to come back to that. I just do want to make the point here that we've danced around, which is this group doesn't quite fit. You could look at policies and procedures, and it talks about labs, and it talks

about the departments, and administrative, units and living groups. And it even might talk about student organizations, but not in a way that deals with this kind of operation. This is a production operation run by students. You can look through the rules and the precedents, and you don't find any of those. So you're giving the administrative apparatus with its rules, and its hierarchies, and its defined responsibilities, and you're giving it a new kind of creature. David.

DAVID: There are lots of student groups that do have hard allocated spaces in [INAUDIBLE]---- there's the [INAUDIBLE] City team and [INAUDIBLE] team and stuff like that. And you do power allocated space with like dangerous machines and stuff where there is risk. RICHARD SCHMALENSEE: Some of those have been around for a long time, of course. This was a new one. DAVID: So maybe it took them five years to get space or 20 years. RICHARD SCHMALENSEE: I also think the Environmental Health and Safety stuff has gotten much more focused in recent years. I think we've all gotten much more risk averse. If you look at something like-- well, I don't know which shops. I know the ones that used to be when I was here as a student, they'd been around for 50 years when, hey, go ahead play with a drill press. Who cares? So it may just be that there's more scrutiny. DAVID: There's some sort of precedent that these groups use. RICHARD SCHMALENSEE: There is. There is. I take your point.

But boy, they acted like this was neither fish nor fowl. Charlotte. CHARLOTTE: I was going to say, I guess, I think that that's the answer right there, that just in today's world, things take longer. I mean, I think it's more impressive that a student group was able to successfully carry out this project, and get approval, and get a space within two years. And then now, six years later, we're actually producing the product. I think that's really impressive. And I know that two years seems like a long time to a college student, but in the real world, wouldn't a project like this take longer? RICHARD SCHMALENSEE: It would depend, wouldn't it? I mean, it went real fast once it cleared. So I think part of what we've been saying, and a lot of people have said it, was none of the key players had a positive incentive to take this project forward. It was more work for Facilities, it was more risk for Environmental Health and Safety,

it was space from other uses for CRSP. So Arianna. ARIANNA: I'm not sure I entirely agree with that. I think there is some kind of incentive as part of [INAUDIBLE] the overall organization if this is accomplished, then it kind of looks good on everyone. But because those-- it's a collective action problem. If not everyone's pulling their weight, and because it's taking all these different groups to pull it off, if someone's lagging, it's a waste of everyone else's time.

RICHARD SCHMALENSEE: But if I'm the Facilities guy, the fact that MIT gets good press doesn't affect my job performance rating, doesn't affect my day-- how well I do my day job, which is what I'm judged on. I'm not judged on MIT's press, I'm not judged on MIT's education, I'm judged on, does the mail get delivered, does the landscape look good? And if I'm Environmental Health and Safety, I'm judged on accidents. Are there risks? Do we comply? This is not an opportunity for me.

This is a challenge for me. CRSP is more complicated because of its diverse representation. But Facilities and Environmental Health and Safety, this is not an opportunity, this is a challenge. For MIT as a whole, that's a different game. ARIANNA: I think there's some trickle down of smiling faces. RICHARD SCHMALENSEE: But the whole point here is not much, in a large complicated organization, not much. Erica. ERICA: Well, in this situation, having MIT look better as a whole would just affect the Facilities' and EH&S's jobs. So they needed to be required to implement the [INAUDIBLE] pass as part of their job. RICHARD SCHMALENSEE: They could be required to. And in fact, that's probably what happened. But when the process is coming up through them, there's nobody requiring them. Sarah. SARAH: It raises a question as to the direction of the rules in the hierarchy because it seems like all of the rules we've talked about thus far

are about proceeding up the hierarchy. But there aren't checks and rules for going down. So if you brought something like this to President Hockfield, she would have the incentive to move forward with it and force those incentives on the people below her. But it's not able to move on the other direction. RICHARD SCHMALENSEE: That's the nature of organizations, right? You go back to Hexion, all these folks concerned about their bonuses with there might be an outage, and it might affect my bonus, and I can't go to Hawaii this year, it may be a great thing for the CEO. If you can get it on the CEO-- the CEO might say, oh, come on, we want to be leaders, we want to get great press, and the savings are nice. So for the organization as a whole, if not necessarily for you and your bonus, we should do this. But if it doesn't get on that person's desk, it doesn't go down the hierarchy. It doesn't go down. Andrew. ANDREW: I assume [INAUDIBLE] some points.

Somebody brought up one of the points that despite-- because if we talk a little about the administrations and how they interact with each other. But I think that we shouldn't underestimate the importance of the individual people who are in that administration. Like if it happens to be that that went to the registrar's office and one day spoke to person A about the same issue, and then the next day spoke to person B, and they should discover results, simply because they spoke to the right person. "Right" might be his position, it might be his mood that day. It might be the [INAUDIBLE] who he conferred me to. So I think that-- I mean, some of you [INAUDIBLE] previously that it's not always the administration, per se. It's the actual people inside and not dealing with a black box. And then if you make it his personal goal or something to make sense-- RICHARD SCHMALENSEE: Well, the registrar is a good example because the registrar's office

is student-facing importantly. Facilities is sort of building-facing. Registrar's office is supposed to solve problems for students. So part of it's temperament and ability. But if you get somebody good, that's their job. It's not the job of the person in Facilities. [INAUDIBLE] AUDIENCE: I know there are [INAUDIBLE] differences. But you can also argue-- I mean, you got to juxtapose this against, say, maybe MITx, that you may not be dealing with Health and Services and Facilities, but you're dealing with other organizations and so on and so forth. RICHARD SCHMALENSEE: That have terms. AUDIENCE: And that went from idea to ground in less than two or three months that we know of. RICHARD SCHMALENSEE: And it had support from the top. And the Energy Initiative got launched with support from the top. Casey. CASEY: So this biodiesel effort was a solution. So maybe part of the problem was that there wasn't a saline problem that needed to be addressed

within the MIT community. I mean, this group had an idea of what it wanted to accomplish. But maybe just the fact that the rest of the MIT community wasn't so concerned about the fuel usage of transportation that the key players did not have this incentive to address the problem because there wasn't this push. RICHARD SCHMALENSEE: So, why'd it change so radically? Obina. AUDIENCE: [INAUDIBLE] to a question. Instead of an incentive, do you think there was a disincentive?