Dynamic Graph Algorithms
- 39Unfamiliar
- 0Learning
- 0Familiar
- 0Mastered
What makes an algorithm a dynamic graph algorithm, and how does it interact with updates and queries?
39 questions
- 1
What makes an algorithm a dynamic graph algorithm, and how does it interact with updates and queries?
Model answer
It processes a graph that changes over time, updating its data structure or answering a query after each online update or query.
Explanation
The input changes step by step as updates arrive, and the algorithm responds to each step rather than solving only a fixed instance.
- 2
What is the role of the initial graph G0 and the graph Gi in the dynamic setting?
Model answer
G0 is the input graph available for preprocessing; Gi denotes the graph after the ith update.
Explanation
The sequence G0,G1,G2,… represents the graph as it evolves over time.
- 3
Give examples of updates and tasks that arise in dynamic graph problems.
Model answer
Updates can insert or delete edges, and sometimes vertices. Tasks include testing connectivity, answering distances between two vertices, or maintaining a minimum spanning tree as the graph changes.
Explanation
Dynamic graph problems can ask either for answers to queries or for updates to a maintained graph object.
- 4
What is an update sequence, and what does update time measure?
Model answer
An update sequence is the sequence of updates and queries presented to the algorithm. Update time is the time needed to process an individual step.
Explanation
Update time measures the per-step work after preprocessing the initial graph.
- 5
Distinguish worst-case update time from amortized update time.
Model answer
Worst-case update time bounds the work of every individual step. Amortized update time bounds the average work over a sequence: after k steps, total processing time is at most kT for amortized time T.
Explanation
The amortized bound is an average over time steps, not an average over a probability distribution; individual steps may take longer than T.
- 6
What is preprocessing time, and how is it treated when measuring update time?
Model answer
Preprocessing time is the time used to process G0 before updates begin, and it is not counted as update time.
Explanation
It is measured separately from the cost of handling the update sequence.
- 7
Compare fully dynamic, incremental, and decremental algorithms.
Model answer
A fully dynamic algorithm handles both insertions and deletions; an incremental algorithm handles insertions, while a decremental algorithm handles deletions.
Explanation
The terms distinguish which types of graph updates the algorithm supports.
- 8
What is a matching, and what does the maximum matching size [?] represent?
Model answer
A matching is a set of edges that share no vertices. The maximum matching size is the number of edges in a largest matching.
Explanation
Because the edges in a matching are vertex-disjoint, the maximum matching is the largest such set in the graph.
- 9
How does the simple rebuild strategy maintain an approximation to the maximum matching size?
Model answer
It computes an approximate maximum matching size from scratch, stores the result, and returns that stored value for a chosen number of subsequent updates before rebuilding.
Explanation
The strategy avoids recomputing after every update by reusing the last computed estimate during a phase.
- 10
Why can the size of a maximum matching change by at most one after a single edge insertion or deletion?
Model answer
An insertion can increase the maximum matching size by at most one, and a deletion can decrease it by at most one.
Explanation
A single changed edge can add or remove at most one edge from a matching, so the optimum size changes by no more than one.
- 11
Why does waiting for about ϵμ~ updates preserve a (1+ϵ)-approximation in the rebuild strategy?
Model answer
Immediately after rebuilding, the stored estimate μ~ approximates the current maximum matching size. Over the next ϵμ~ updates, that size can change by at most ϵμ~, keeping the stored estimate within a factor of 1+ϵ.
Explanation
The approximation remains valid because each update changes the optimum by at most one and the estimate is refreshed before accumulated change becomes too large.
- 12
Why is the number of edges in a graph at most 2nμ(G), where n is the number of vertices and μ(G) is the maximum matching size?
Model answer
Every edge must be incident to an edge of a maximum matching; otherwise, that edge could be added to the matching. Removing the two endpoints of each matching edge removes at most 2n edges, so m≤2nμ(G).
Explanation
The endpoints of a maximum matching cover all edges, and each endpoint has degree at most n.
- 13
How does the edge bound help analyze the amortized update time of rebuilding for dynamic matching?
Model answer
If rebuilding takes O(m/ϵ) time and the algorithm waits for about ϵμ(G) updates, then the rebuild cost per update is O(m/ϵ2μ(G)). Using m≤2nμ(G) gives O(n/ϵ2) amortized update time, or O(n) for fixed ϵ.
Explanation
The maximum-matching edge bound cancels the factor of μ(G) in the phase length against the bound on m.
- 14
State the general reduction from a finite-horizon algorithm to an algorithm handling arbitrarily many updates.
Model answer
If an algorithm can handle L updates with rebuild time Tb and worst-case update time Tu, rebuilding every L steps gives amortized update time Tb/L+Tu.
Explanation
The rebuild cost is spread across the L updates in each phase, while the ordinary update cost is paid at each step.
- 15
How can background rebuilding convert a rebuild-based amortized bound into a worst-case bound?
Model answer
Spread the rebuild work over many updates instead of doing it all at once, then catch up on updates that arrived during rebuilding before using the new data structure.
Explanation
Distributing the rebuild cost removes the large single-step spike that prevents a worst-case guarantee.
- 16
Describe the three periods used in the background-rebuilding schedule for a phase of length L.
Model answer
Use the first L/4 steps to rebuild the structure for the graph at the phase's start, the next L/4 steps to process missed updates at double speed, and the final L/2 steps to process updates normally with a current structure.
Explanation
The middle period catches the rebuilt structure up to the present, and the final period is when this instance gives correct current answers.
- 17
Why does the catch-up period process two updates for each new update received?
Model answer
The rebuilt structure is behind because updates were ignored during rebuilding. Processing two updates per step lets it handle both the newly arriving update and one previously missed update, catching up in time.
Explanation
The structure must process updates faster than they arrive temporarily to eliminate its backlog.
- 18
Why is a single background-rebuilding instance not correct throughout the entire phase?
Model answer
It is rebuilding or catching up during the first half of the phase, so it does not yet represent the current graph; it is current during the final half.
Explanation
Only the final period follows completion of both rebuilding and catch-up.
- 19
How do two shifted background-rebuilding instances provide a correct answer at every step?
Model answer
Run two copies with their schedules shifted so their correct final periods cover complementary parts of the timeline. At every step, at least one copy is current and correct.
Explanation
The second copy's schedule is offset from the first, and its initial preprocessing is outside the update-time measure.
- 20
What worst-case update-time bound results from background rebuilding?
Model answer
The worst-case update time is O(Tb/L+Tu), up to constant factors.
Explanation
Each step performs a share of the rebuild work as well as the ordinary update work; running two instances changes only the constant factor.
- 21
What is the decremental connectivity problem considered in the batching example?
Model answer
Given a graph subject only to edge deletions, maintain whether the whole graph remains connected.
Explanation
It is decremental because the update sequence contains deletions only, and the task is to track connectivity.
- 22
What is a one-batch algorithm for connectivity, and how is its input different from a fully dynamic sequence?
Model answer
It receives one set D of d edge deletions and determines whether the graph G−D is connected; it does not need to process a continuing sequence of batches.
Explanation
The one-batch setting isolates the effect of a single group of deletions, which can be easier to handle than an ongoing dynamic sequence.
- 23
How can a one-batch algorithm with initialization time O(m) and batch time O(d2) be used to handle a finite sequence of L deletions?
Model answer
For update i, form a batch containing the first i deletions and run the one-batch algorithm on it. This gives a finite-horizon algorithm with initialization time O(m) and per-step time at most O(L2).
Explanation
At each step the prefix batch has size at most L, so its O(d2) processing cost is at most O(L2).
- 24
How does background rebuilding turn the finite-horizon deletion algorithm into a worst-case dynamic algorithm, and what choice of L gives the stated bound?
Model answer
The bound becomes O(m/L+L2) per update. Choosing L=m1/3 balances the terms and gives O(m2/3) worst-case update time.
Explanation
Substituting L=m1/3 makes both m/L and L2 equal to m2/3.
- 25
Why is a spanning tree useful when analyzing a batch of edge deletions?
Model answer
Deleting tree edges splits the original spanning tree into components; to determine whether the updated graph remains connected, it suffices to check whether surviving non-tree edges reconnect those components.
Explanation
The tree edges provide an initial connected structure, and non-tree edges are the possible links between components after tree-edge deletions.
- 26
How many components can result from deleting d edges of a spanning tree?
Model answer
At most d+1 components can result.
Explanation
Each deleted tree edge can increase the number of components by at most one.
- 27
What is the purpose of representing a tree by an Euler tour in the one-batch connectivity method?
Model answer
An Euler tour represents the tree as a sequence, allowing tree-edge deletions to be expressed as cuts that divide the sequence into intervals.
Explanation
The interval representation makes it possible to use range queries to test for non-tree edges between the resulting tree components.
- 28
How is a non-tree edge represented as a point in the two-dimensional range structure?
Model answer
For a non-tree edge with endpoints u and v, store a point whose coordinates are the first positions where u and v appear in the Euler-tour sequence.
Explanation
This point representation lets rectangle queries test whether non-tree edges connect particular Euler-tour intervals.
- 29
What operations does the two-dimensional range-query structure support in this method, and what are their stated costs?
Model answer
It supports point insertion and deletion in O(log2n) time and returns a point inside a queried rectangle in O(logn) time.
Explanation
These operations maintain the surviving non-tree edges and test whether a relevant pair of intervals has an edge between them.
- 30
How does a batch of deletions lead to a connectivity test using range queries?
Model answer
Remove points for deleted non-tree edges, partition the Euler-tour representation at deleted tree edges, and query the relevant pairs of intervals for surviving non-tree edges. If the components can be reconnected, the updated graph is connected.
Explanation
The queries detect whether edges remain between components created by the deleted tree edges.
- 31
Why does the one-batch algorithm take O(d2) time to process the batch?
Model answer
There are O(d) intervals created by the deleted tree edges, and the algorithm checks O(d2) relevant pairs of intervals, with each range query taking logarithmic time; the stated batch bound is O(d2) up to logarithmic factors.
Explanation
The quadratic number of interval-pair checks dominates the batch-processing work described.
- 32
How can batching improve dynamic update bounds beyond the one-batch reduction?
Model answer
A multi-batch algorithm can process batches of decreasing sizes, with later batches smaller than earlier ones, and then schedule those batches to reduce the worst-case update time.
Explanation
For example, the discussed two-batch sizes are about m2/3 and m1/3, leading to an O(m1/3) update-time target under the stated batch-cost assumptions.
- 33
What is a vertex sparsifier, also called a mimicking network, intended to do?
Model answer
Given a large graph and a small terminal set S, it produces a smaller graph H containing the terminals while preserving useful information about the original graph as it relates to those terminals.
Explanation
The goal is to compress the graph without losing the information relevant to the selected terminals.
- 34
What size goal does the vertex-sparsifier construction seek relative to the terminal set?
Model answer
It seeks a graph whose size is proportional to the size of the terminal set, rather than the size of the original graph.
Explanation
The sparsifier is intended to shrink a large graph to a representation scaled to the terminals.
- 35
What guarantee does the described shortest-path sparsifier provide for terminal pairs?
Model answer
For parameter k, it has O(∣S∣n1/k) edges and preserves the distance between every pair of terminals within a factor of k.
Explanation
The construction trades sparsifier size against the multiplicative approximation factor for terminal-to-terminal distances.
- 36
Define the minmax path between two vertices.
Model answer
It is a path between the vertices that minimizes the maximum edge weight appearing on the path.
Explanation
The path is judged by its heaviest edge, rather than by the sum of its edge weights.
- 37
How does a minimum spanning tree preserve minmax paths?
Model answer
For any two vertices, the unique path between them in a minimum spanning tree is a minmax path in the original graph.
Explanation
If another path had a strictly smaller maximum edge weight, replacing the largest-weight edge on the tree path with a suitable edge from that alternative path would produce a lighter spanning tree, contradicting minimality.
- 38
Explain the exchange argument showing that a minimum spanning tree path is a minmax path.
Model answer
Assume the tree path contains a maximum-weight edge heavier than every edge on some alternative path between the same endpoints. Adding an edge from that alternative path and removing the heavier tree edge yields a spanning tree of lower total weight, a contradiction.
Explanation
The contradiction to the minimum-spanning-tree property establishes that no alternative path has a smaller maximum edge weight.
- 39
What does it mean to rewind an algorithm, and how can persistence support this operation?
Model answer
Rewinding means restoring an algorithm or data structure to its configuration at an earlier point in its execution. Persistence can provide access to earlier versions, enabling that restoration.
Explanation
This ability supports reductions that repeatedly use a data structure from a prior state; the lecture notes that persistence can provide it without loss of generality.

Ask anything
We've read this whole study set, so questions about it get the best answers.