- 1Traditional feedback control involves sensing, actuation, and computation in a_____loop.
Hint
Think about the cycle of measure, compare, and adjust.
Answer
feedback
- 2The modern view of control emphasizes analyzing, designing, and implementing complex systems in the presence of_____.
Hint
What makes control challenging and interesting?
Answer
uncertainty
- 3The acronym DUFF stands for dynamics, uncertainty, feedforward, and_____.
Hint
The fourth element completes the cycle.
Answer
feedback
- 4Feedback is a tool for managing_____.
Hint
What does feedback help overcome when the system is not perfectly known?
Answer
uncertainty
- 5Feedback provides a tool for designing the_____of a system.
Hint
It allows us to change how the system behaves over time.
Answer
dynamics
- 6If there is no uncertainty in a system,_____is not needed.
Hint
When everything is perfectly known, you can use a simpler approach.
Answer
feedback
- 7Feedback enables_____and interoperability.
Hint
It allows components to be interconnected without redesign.
Answer
modularity
- 8In open-loop control, the controller applies inputs based on a_____of the system, without monitoring the output.
Hint
It uses a forward calculation rather than correction.
Answer
model
- 9A typical example of open-loop control is a stoplight that cycles without_____sensors.
Hint
It doesn't adjust based on actual conditions.
Answer
traffic
- 10The three primary disadvantages of feedback are complexity, potential for_____, and noise amplification.
Hint
Think of the microphone squeal when gain is too high.
Answer
instability
- 11The two primary advantages of feedback are robustness to_____and enabling modularity.
Hint
It measures what actually happens, not what is assumed.
Answer
uncertainty
- 12In the standard control model, the_____watches the outputs and infers the internal state.
Hint
It estimates unmeasured quantities.
Answer
observer
- 13The_____applies inputs to the process based on task description and observed information.
Hint
It decides what actions to take.
Answer
controller
- 14Disturbances and_____are sources of uncertainty that affect the system.
Hint
Both corrupt the measurements or the process.
Answer
noise
- 15The box labeled ENV (environment) in the control diagram represents unmodeled dynamics and_____.
Hint
It captures what we choose to leave out of the model.
Answer
uncertainty
- 16In control theory, models are always_____.
Hint
They are never perfect.
Answer
approximations
- 17Continuous state systems are often modeled using ordinary differential equations or_____differential equations.
Hint
Spatial variations require this type of equation.
Answer
partial
- 18Discrete state systems can be represented by finite state automata or_____nets.
Hint
A graphical modeling tool for concurrent systems.
Answer
Petri
- 19In probabilistic systems, specifications often involve probabilities, expected moments, and_____decision processes.
Hint
A common framework for stochastic decision making.
Answer
Markov
- 20A regulation problem aims to keep a variable at a constant_____.
Hint
Think of maintaining speed at a desired value.
Answer
setpoint
- 21In step response specifications,_____time is how long it takes to first reach the final value.
Hint
It starts from the initial response.
Answer
rise
- 22The amount by which the output exceeds the final value in a step response is called_____.
Hint
It's the maximum peak above the target.
Answer
overshoot
- 23The time required for the output to stay within a certain percentage of the final value is the_____time.
Hint
It indicates how long until transients die out.
Answer
settling
- 24Frequency response analysis examines the_____and phase of the system's output relative to a sinusoidal input.
Hint
It's about amplitude amplification.
Answer
gain
- 25Safety properties in temporal logic specify that something_____should happen.
Hint
It's about avoiding undesirable events.
Answer
never
- 26Liveness properties specify that something_____should happen.
Hint
It's about ensuring progress.
Answer
eventually
- 27In reactive compensation, the controller computes the input based on the_____between reference and output.
Hint
It's the difference between desired and actual.
Answer
error
- 28Reference input shaping typically uses a_____pass filter to smooth sudden changes.
Hint
It removes high-frequency content.
Answer
low
- 29In predictive compensation, the controller uses a model to compute a nominal_____and nominal state.
Hint
It pre-calculates what to do.
Answer
input
- 30In predictive compensation, feedback is applied on the_____error rather than output error.
Hint
It compares estimated state to desired state.
Answer
state
- 31The dashed line in the predictive compensation diagram indicates that trajectory generation is done_____over time.
Hint
It's not a one-time calculation.
Answer
repeatedly
- 32Receding horizon control is an example of_____optimization used in feedback.
Hint
It computes on the fly.
Answer
online
- 33In the bike share example, the actuator can be moving bikes or offering_____.
Hint
Encouraging users to change behavior.
Answer
incentives
- 34In earthquake detection, the problem is primarily an_____problem (observer only).
Hint
It's about inferring state from measurements.
Answer
estimation
- 35Autonomous vehicles use both_____and feedback to navigate safely.
Hint
They plan ahead and correct.
Answer
feedforward
- 36The DARPA Grand Challenge vehicle Alice used multiple layers of_____to handle complex tasks.
Hint
Breaking down the problem into levels.
Answer
abstraction
- 37Advances in computation have enabled_____optimization in control systems.
Hint
It happens during operation.
Answer
online
- 38Formal methods from computer science are used for verification and_____of control systems.
Hint
The process of automatically generating a controller from specifications.
Answer
synthesis
- 39The concept of_____control involves recalculating trajectories every fraction of a second.
Hint
It's also called model predictive control.
Answer
receding horizon
- 40An adversarial environment can be captured in the control diagram as a_____where the environment actively works against the controller.
Hint
It involves strategic interaction.
Answer
game
- 41Nesting of feedback loops at different time scales requires_____contracts to ensure assumptions between layers are consistent.
Hint
They connect different levels of abstraction.
Answer
vertical