Circular construction aims to keep building materials in circulation rather than treating them as
after use.

80 questions

  1. 1
    Circular construction aims to keep building materials in circulation rather than treating them as
    _____
    after use.
    Hint

    Think about whether materials are discarded or kept available for another use.

    Answer

    waste

    Explanation

    Circular construction seeks to reuse or recycle materials so they remain in circulation instead of becoming waste.

  2. 2
    A key principle of zero waste is to keep existing materials in use for as
    _____
    as possible.
    Hint

    Consider how renovation can delay the need to replace materials.

    Answer

    long

    Explanation

    The content describes the first step of zero waste as keeping materials in use for as long as possible.

  3. 3
    In a circular building project, designing components so they can be taken apart later is called designing for
    _____
    .
    Hint

    Think of the reverse of assembling a structure.

    Answer

    disassembly

    Explanation

    Designing for disassembly makes it possible to separate and reuse building components in the future.

  4. 4
    A material logbook records materials already present in a building so they can be treated as
    _____
    rather than waste.
    Hint

    The record helps identify materials that may be recovered later.

    Answer

    recyclable materials

    Explanation

    Documenting existing materials makes it easier to recognize and manage them as recyclable materials.

  5. 5
    A building resource passport could document the materials in a building and support their future
    _____
    .
    Hint

    Consider what information about building materials can enable when a building is altered or dismantled.

    Answer

    reuse

    Explanation

    A building resource passport records material information and can help materials be reused in future projects.

  6. 6
    The zero-waste hierarchy favors retaining current materials in their existing
    _____
    when possible.
    Hint

    Think about whether keeping a component intact is preferable to processing or replacing it.

    Answer

    shape

    Explanation

    The content emphasizes retaining materials in the shape they already have as the best option in the zero-waste hierarchy.

  7. 7
    A circular approach considers a building's materials throughout their life cycle, from production to demolition and
    _____
    .
    Hint

    This is the final stage named when assessing a building's environmental costs.

    Answer

    disposal

    Explanation

    The true environmental cost of construction includes impacts from production through demolition and disposal.

  8. 8
    The construction sector contributes substantially to climate change partly because producing building materials consumes energy and creates
    _____
    .
    Hint

    Think about greenhouse gases released during material production.

    Answer

    emissions

    Explanation

    Material production uses energy and generates emissions, making construction a major climate challenge.

  9. 9
    The content argues that circular construction requires changes in mindset as well as in regulations, guidelines, and building
    _____
    .
    Hint

    These formal rules shape what construction practices are permitted.

    Answer

    laws

    Explanation

    Changing regulations, guidelines, and building laws can make reusable and recyclable materials easier to use.

  10. 10
    To make circular construction more widespread, the content says renewable-material producers need to be
    _____
    .
    Hint

    Small manufacturers need help to compete and advance their materials.

    Answer

    supported

    Explanation

    Small manufacturers produce renewable building materials, and the content says they need support to move this type of construction forward.

  11. 11
    The content describes the construction sector as a major user of extracted raw materials, with about 90% of Germany's extracted materials flowing into
    _____
    .
    Hint

    The statistic concerns where natural materials such as forest products and gravel are used.

    Answer

    the construction industry

    Explanation

    The content states that roughly 90% of raw materials extracted in Germany flow into the construction industry.

  12. 12
    The construction industry's reported carbon footprint in the content is about
    _____
    .
    Hint

    Recall the approximate share linked to construction in the discussion of climate impacts.

    Answer

    40%

    Explanation

    The content cites a 40% carbon footprint associated with the construction industry.

  13. 13
    Straw binds greenhouse gases as it
    _____
    and requires little energy during production.
    Hint

    Consider what a growing plant does before it becomes a building material.

    Answer

    grows

    Explanation

    Straw is environmentally advantageous because it binds greenhouse gases while growing and takes little energy to produce as a material.

  14. 14
    The air pressed out during baling helps make a bale of straw not excessively
    _____
    .
    Hint

    The question concerns fire behavior, not structural strength.

    Answer

    flammable

    Explanation

    The content explains that compressed straw is not excessively flammable, especially when plastered several times with clay.

  15. 15
    Repeated plastering with
    _____
    further helps protect straw walls from fire.
    Hint

    This natural wall finish is also used in the house's interior walls.

    Answer

    Clay

    Explanation

    The content says a bale of straw is especially not excessively flammable when it is plastered with clay several times.

  16. 16
    Loadbearing straw-bale construction uses compressed straw bales as the building's
    _____
    blocks.
    Hint

    These blocks form the walls that support the roof.

    Answer

    holding

    Explanation

    The straw bales are compressed and used as the holding blocks in loadbearing straw-bale construction.

  17. 17
    In the straw house, the loadbearing straw walls were designed to support a roof weighing several
    _____
    .
    Hint

    The roof's weight made its installation a major structural test.

    Answer

    tons

    Explanation

    The walls were intended to be the only support for a roof weighing several tons.

  18. 18
    Because straw bales vary in how they are compressed and how the straw has grown, builders must adapt each bale to the
    _____
    at hand.
    Hint

    Builders may turn or trim a bale to fit a particular part of the structure.

    Answer

    wall

    Explanation

    Every bale has its own characteristics, so builders adjust the bales as they construct each wall.

  19. 19
    Straw-bale buildings were described as requiring approval on a
    _____
    -by-case basis.
    Hint

    The approval process considers each project individually.

    Answer

    case

    Explanation

    The content says permits for this kind of non-prefabricated house are given on a case-by-case basis.

  20. 20
    The straw-house project planned a plant-based purification system for its
    _____
    .
    Hint

    This is wastewater that is treated with plants, unlike toilet waste in the described system.

    Answer

    gray water

    Explanation

    The house's circulation system uses plant-based purification for gray water and compost toilets for black water.

  21. 21
    The straw house's black-water system relies on
    _____
    .
    Hint

    This alternative handles toilet waste without connecting to conventional sewage.

    Answer

    compost toilets

    Explanation

    The planned closed system uses compost toilets for black water rather than a sewage connection.

  22. 22
    A straw-house design used a round guest house and a separate
    _____
    house.
    Hint

    This is the primary residence, distinct from the guest building.

    Answer

    main

    Explanation

    The couple planned to build both a round guest house and a main house, doing much of the work themselves.

  23. 23
    Before the COVID pandemic, a straw house cost about 3% more than an ordinary
    _____
    .
    Hint

    The comparison is with conventional residential construction.

    Answer

    house

    Explanation

    The content reports that before the pandemic, straw-house construction cost about 3% more than an ordinary house.

  24. 24
    The content gives approximate counts of 700 straw houses in Austria, 1,000 in Germany, and 10,000 in
    _____
    .
    Hint

    This country had the largest of the three stated totals.

    Answer

    France

    Explanation

    The stated approximate totals are around 700 in Austria, 1,000 in Germany, and 10,000 in France.

  25. 25
    Natural building materials such as straw can be harder to scale because they depend on small producers and substantial
    _____
    labor.
    Hint

    This work is performed directly by people rather than automated industrial production.

    Answer

    manual

    Explanation

    The content notes that straw construction depends heavily on manual labor and on small producers of building materials.

  26. 26
    In the Slovenian renovation project, the old farm's materials were documented with a material
    _____
    so they could be treated as recyclable.
    Hint

    This record identifies the materials found in the building.

    Answer

    logbook

    Explanation

    The material logbook was created to record existing materials and make it possible to treat them as recyclable materials rather than waste.

  27. 27
    The old farm renovation was chosen instead of demolition after the owner recognized that the existing house was already a potential zero-waste
    _____
    .
    Hint

    The realization was that a useful structure already existed on the property.

    Answer

    house

    Explanation

    The owner reconsidered demolition and concluded that keeping the existing house in use was the more sustainable option.

  28. 28
    A road clause in the property's sales contract disrupted the original plan to demolish the farm and build a new
    _____
    .
    Hint

    This was the planned replacement structure, designed to be dismantled.

    Answer

    wooden house

    Explanation

    The owner had overlooked a clause regarding a road on the property, which caused the original new-house plan to fall through.

  29. 29
    The old farm's 60-centimeter-thick ground-floor walls were described as providing good
    _____
    .
    Hint

    This property helps limit heat transfer through the walls.

    Answer

    insulation

    Explanation

    The content contrasts the thick ground-floor walls, which insulate well, with the drafty, never-inhabited attic.

  30. 30
    Before deciding whether to keep the farm's roof, the owner wanted the old building materials thoroughly
    _____
    .
    Hint

    The examination was meant to determine whether the structure still had integrity.

    Answer

    inspected

    Explanation

    Inspecting the materials and structure would establish whether the roof could be renovated safely or would need replacement.

  31. 31
    If more than 20% of the old beams could not be saved, the roof structure would have to be completely
    _____
    .
    Hint

    This outcome would make the renovation unaffordable for the owner.

    Answer

    replaced

    Explanation

    The content says that if just 20% of the old beams were beyond saving, the roof structure would need complete replacement.

  32. 32
    The renovated farm's roof was reinforced and given space for 40 centimeters of natural
    _____
    .
    Hint

    This material layer improves the roof's thermal performance.

    Answer

    insulation

    Explanation

    After removing the old tiles and raising the beams, the project made room for 40 centimeters of natural insulation.

  33. 33
    To create additional roof space and reinforce the structure, the beams were raised by an additional 12
    _____
    .
    Hint

    This measurement refers to the height added to the beams.

    Answer

    centimeters

    Explanation

    The renovation raised the beams by an additional 12 centimeters, creating more space and strengthening the structure.

  34. 34
    The farm renovation used wood-fiber boards and aimed to avoid installing an air-conditioning
    _____
    .
    Hint

    This mechanical device cools indoor air.

    Answer

    unit

    Explanation

    The project added wood-fiber boards and sought to avoid an air-conditioning unit in favor of a natural building approach.

  35. 35
    A building that combines existing and newer construction methods can be understood as a
    _____
    of old and modern techniques.
    Hint

    This word describes a combination of different approaches.

    Answer

    synthesis

    Explanation

    The renovated house became a synthesis of old and modern building techniques rather than a completely zero-waste new build.

  36. 36
    The renovation was estimated to cost about €200,000, which was described as much less than constructing a
    _____
    building.
    Hint

    The comparison is with starting over rather than adapting the existing house.

    Answer

    new

    Explanation

    The owner estimated the renovation at €200,000, considerably less than the cost of a new building.

  37. 37
    In the renovation project, worm-eaten and damaged materials sometimes had to be discarded, illustrating that some waste cannot always be
    _____
    .
    Hint

    Even a project designed to reduce waste may encounter materials that cannot be saved.

    Answer

    avoided

    Explanation

    The project tried to avoid waste, but structural damage meant that some materials could not be retained.

  38. 38
    Hempcrete is a composite made from hemp, chalk, and
    _____
    .
    Hint

    This ingredient is added to the dry materials before application.

    Answer

    water

    Explanation

    The content identifies hempcrete as a mixture of chalk, hemp, and water.

  39. 39
    Hempcrete is sprayed into wall and floor compartments, where it eventually
    _____
    .
    Hint

    The mixture changes from a wet material into a solid building layer.

    Answer

    hardens

    Explanation

    After being sprayed into compartments in walls and floors, the hempcrete mixture hardens.

  40. 40
    Compared with polyethylene, hemp insulation allows walls to
    _____
    .
    Hint

    This describes the walls' capacity to manage moisture rather than trapping it.

    Answer

    breathe

    Explanation

    The content contrasts hemp insulation with polyethylene by noting that hemp walls can breathe.

  41. 41
    Hemp insulation can help create an excellent indoor
    _____
    .
    Hint

    This describes the comfort conditions inside the building.

    Answer

    climate

    Explanation

    The content says hemp insulation contributes to an excellent indoor climate.

  42. 42
    In addition to insulating, hempcrete is a good acoustic
    _____
    .
    Hint

    This property relates to reducing sound transmission.

    Answer

    insulator

    Explanation

    Hempcrete provides acoustic insulation as well as thermal insulation.

  43. 43
    The hemp used in the renovation project came from
    _____
    .
    Hint

    The material crossed a nearby national border to reach Slovenia.

    Answer

    Hungary

    Explanation

    The content says the hemp used for the insulation came from Hungary.

  44. 44
    The hemp mixture's environmental balance was described as very good because it requires minimal
    _____
    .
    Hint

    The claim concerns the resources needed to produce and apply the insulation.

    Answer

    energy

    Explanation

    Hempcrete was presented as having a good environmental balance because its energy requirements are minimal.

  45. 45
    Hempcrete insulation was proposed as an alternative to conventional synthetic insulation such as
    _____
    .
    Hint

    This material was contrasted with breathable hemp walls.

    Answer

    polyethylene

    Explanation

    The content contrasts the breathable hemp insulation with polyethylene, which does not provide the same wall-breathing quality.

  46. 46
    The hempcrete project reflects a broader return to natural building after hemp cultivation had declined in the region following
    _____
    .
    Hint

    The content refers to changes after Yugoslavia broke apart.

    Answer

    independence

    Explanation

    The speaker says hemp cultivation in Slovenia had declined after independence, despite its earlier prominence in Yugoslavia.

  47. 47
    Straw and clay construction can face economic and institutional disadvantages because conventional materials have benefited from decades of
    _____
    .
    Hint

    This has helped create a perception that new products are better than older or natural ones.

    Answer

    advertising

    Explanation

    The content argues that decades of advertising have encouraged people to regard new products as superior, while natural-material producers lack a strong lobby.

  48. 48
    Before demolition, examining a building for reusable and recyclable components is known as urban
    _____
    .
    Hint

    This approach treats buildings as sources of materials, like a mine.

    Answer

    mining

    Explanation

    Urban mining assesses buildings as sources of raw materials that can be recovered and used again.

  49. 49
    Urban mining treats each building as a kind of raw-material
    _____
    .
    Hint

    The metaphor emphasizes recovering resources already present in buildings.

    Answer

    mine

    Explanation

    The approach views existing buildings as repositories of materials rather than simply as structures to discard.

  50. 50
    A material check before demolition should identify materials that are reusable or at least
    _____
    .
    Hint

    Some components may not be reusable intact but can still be processed into new materials.

    Answer

    recyclable

    Explanation

    The material assessment checks for both reusable components and materials that can at least be recycled.

  51. 51
    For materials to be recovered efficiently, they should be easy to
    _____
    .
    Hint

    This is especially important when a building is dismantled.

    Answer

    separate

    Explanation

    The content says materials need to be easy to separate for effective recovery and recycling.

  52. 52
    The annual construction-waste figure cited for Germany is about 74 million
    _____
    .
    Hint

    This is the unit used for the quantity of discarded building material.

    Answer

    tons

    Explanation

    The content identifies the disposal of approximately 74 million tons of construction waste per year in Germany as a growing concern.

  53. 53
    An assessment of whether a building can be modernized may consider wooden-beam ceilings a major
    _____
    because of concerns about future structural stability.
    Hint

    The content uses an informal term for a factor that can undermine the case for modernization.

    Answer

    killer

    Explanation

    Wooden-beam ceilings are often seen as a modernization obstacle because they may create structural stability concerns over a 50- or 100-year life cycle.

  54. 54
    The content argues that the impacts of demolition should be considered before it happens, so planners can determine what must be
    _____
    .
    Hint

    The goal is to take stock of recoverable resources in advance.

    Answer

    recycled

    Explanation

    Taking stock before demolition helps identify which materials can and must be recycled in the future.

  55. 55
    A building component catalog can record materials and their potential
    _____
    savings.
    Hint

    The information can help compare environmental impacts of building components.

    Answer

    emission

    Explanation

    The catalog developed from the work contains information about materials and associated emission savings.

  56. 56
    In the long term, an existing component can be reused for a new
    _____
    rather than discarded.
    Hint

    The component may serve a second life in another building project.

    Answer

    construction

    Explanation

    The content gives the example of a component in good condition being suitable for use in new construction.

  57. 57
    The content says Germany seals about 200 square kilometers of land per
    _____
    .
    Hint

    The figure describes the rate at which land is covered.

    Answer

    year

    Explanation

    The content cites approximately 200 square kilometers of land sealed per year in Germany.

  58. 58
    Redensification seeks to create more living space in existing urban areas while also protecting the
    _____
    .
    Hint

    This urban-planning strategy tries to address housing demand without ignoring environmental effects.

    Answer

    climate

    Explanation

    The content presents redensification as a way for cities to create more living space while protecting the climate.

  59. 59
    Before demolition, a building's components can be checked and cataloged as part of an
    _____
    -mining approach.
    Hint

    This term describes recovering materials from the built environment.

    Answer

    urban

    Explanation

    Urban mining catalogs building components to identify what can be reused or recycled before a structure is demolished.

  60. 60
    The content suggests that renovation can emit less carbon dioxide than constructing a new, highly insulated building, even when the existing building is
    _____
    renovated.
    Hint

    The comparison highlights the emissions of new construction, not the ideal condition of the old building.

    Answer

    poorly

    Explanation

    The content states that even the best new highly insulated building emits more carbon dioxide than a poorly renovated existing building.

  61. 61
    Recycled concrete, or R concrete, incorporates recovered concrete and bricks into a new building's
    _____
    .
    Hint

    These building parts were made from sorted and recycled demolition materials.

    Answer

    facades and walls

    Explanation

    The town hall example used old concrete and bricks, sorted and recycled nearby, in its facades and walls.

  62. 62
    The R in R concrete stands for
    _____
    .
    Hint

    It names the process of recovering materials for another use.

    Answer

    recycling

    Explanation

    The content explicitly defines R concrete as concrete associated with recycling.

  63. 63
    The recycled-concrete town hall was reported to produce 7% fewer emissions than a building using conventional
    _____
    .
    Hint

    The comparison is with the standard material whose cement production is energy- and emissions-intensive.

    Answer

    Concrete

    Explanation

    The town hall using R concrete was reported to produce 7% fewer emissions than conventional concrete construction.

  64. 64
    Cement production is both energy-intensive and emissions-intensive, so using less cement conserves valuable
    _____
    .
    Hint

    The benefit is not limited to reducing emissions; it also reduces demand for materials.

    Answer

    resources

    Explanation

    Reducing cement use saves resources because cement production consumes substantial energy and produces emissions.

  65. 65
    Recycled brick chippings in a building facade can make urban
    _____
    visible.
    Hint

    The facade displays recovered materials from the built environment.

    Answer

    mining

    Explanation

    The content points to brick chippings in the facade as a visible sign of urban mining.

  66. 66
    The town hall project was described as Germany's first
    _____
    mining project.
    Hint

    The project recovered materials from an existing building for a new one.

    Answer

    urban

    Explanation

    The content describes the recycled-material town hall as the first urban mining project in Germany.

  67. 67
    Circular construction favors plugging and screwing over gluing and
    _____
    so materials can be separated later.
    Hint

    These methods permanently join materials and make later separation harder.

    Answer

    bonding

    Explanation

    The content says that plugging and screwing should replace gluing and bonding to enable future dismantling.

  68. 68
    Designing a building so its materials can be separated by type in the future makes them easier to
    _____
    .
    Hint

    Separated materials can be recovered as distinct material streams.

    Answer

    recycle

    Explanation

    The town hall's design enables future separation by material type, which supports recycling and further use.

  69. 69
    A digital tool called the urban mining index helps planners assess material impacts and
    _____
    .
    Hint

    It measures how readily components can enter a circular materials system.

    Answer

    recyclability

    Explanation

    The urban mining index quantifies and combines information about materials, emissions, and the recyclability of building components.

  70. 70
    The urban mining index was developed to measure
    _____
    and help persuade decision-makers with figures.
    Hint

    This term describes how well materials remain in a reusable loop.

    Answer

    circularity

    Explanation

    The index offers a way to measure circularity and present its value using simple figures.

  71. 71
    The recycling encyclopedia compared conventional construction with recyclable construction and found that closed-loop projects were more economical in the
    _____
    .
    Hint

    The advantage may not be apparent if only immediate costs are considered.

    Answer

    long term

    Explanation

    For the three projects studied, recycling-friendly or closed-loop construction proved more economical over the long term.

  72. 72
    A demolition contractor helped calculate the actual costs of dismantling and
    _____
    .
    Hint

    These costs occur after materials have been taken apart.

    Answer

    disposal

    Explanation

    The field research used a demolition contractor to estimate real dismantling and disposal costs for the recycling encyclopedia.

  73. 73
    A green roof can reduce the effects of heavy rainfall by storing
    _____
    .
    Hint

    The roof temporarily holds precipitation instead of allowing it all to run off immediately.

    Answer

    water

    Explanation

    The content explains that green roofs counteract climate-change effects by storing water from heavy rainfall.

  74. 74
    A green roof needs a watertight layer beneath it so rain does not pass through the
    _____
    .
    Hint

    The layer protects the building below the planted surface.

    Answer

    roof

    Explanation

    The project had to seal the green roof because the roof must be watertight to protect the living space.

  75. 75
    For the green-roof covering to be installed, the seams in its plastic film needed to be
    _____
    .
    Hint

    Wet seams would interfere with making a reliable seal.

    Answer

    dry

    Explanation

    The builders noted that the seams had to be dry before they could install and seal the plastic film.

  76. 76
    The small plants for the green roof were grown in advance and would later be placed on the
    _____
    .
    Hint

    They were prepared before being installed on the building's upper surface.

    Answer

    roof

    Explanation

    The plants were grown in advance and were to be placed on the green roof later.

  77. 77
    The house's planned energy systems included photovoltaics and solar
    _____
    .
    Hint

    This system uses sunlight to provide heat rather than electricity alone.

    Answer

    thermal energy

    Explanation

    The couple planned to produce their own electricity and heat using photovoltaics and solar thermal energy.

  78. 78
    A compost toilet should smell less than a regular toilet, though the builders planned to see how it worked in
    _____
    .
    Hint

    They had not yet tested the toilet in everyday use.

    Answer

    practice

    Explanation

    The builders expected a compost toilet not to smell as bad as a regular toilet but planned to find out through actual use.

  79. 79
    The straw-house builders postponed the main house because continuing on the original schedule would have been too stressful and
    _____
    .
    Hint

    This describes the physical and emotional toll they wanted to avoid.

    Answer

    exhausting

    Explanation

    After the guest house work and its organization required substantial effort, the couple chose to delay the main house rather than continue an exhausting schedule.

  80. 80
    The green-roof project illustrates that sustainable building sometimes requires practical choices to protect one's living
    _____
    .
    Hint

    The builders said they needed to seal the roof because this is where they live.

    Answer

    space

    Explanation

    The content notes that some choices may not be completely sustainable, but sealing the roof was necessary to protect the household's living space.

1 of 80
Question 1 of 80

Ask anything

We've read this whole study set, so questions about it get the best answers.

FlashcardsQuizFill in the blanksWritten testLessonNotesPodcastContent