- 1Circular construction aims to keep building materials in circulation rather than treating them as_____after use.
Hint
Think about whether materials are discarded or kept available for another use.
Answer
waste
Explanation
Circular construction seeks to reuse or recycle materials so they remain in circulation instead of becoming waste.
- 2A key principle of zero waste is to keep existing materials in use for as_____as possible.
Hint
Consider how renovation can delay the need to replace materials.
Answer
long
Explanation
The content describes the first step of zero waste as keeping materials in use for as long as possible.
- 3In a circular building project, designing components so they can be taken apart later is called designing for_____.
Hint
Think of the reverse of assembling a structure.
Answer
disassembly
Explanation
Designing for disassembly makes it possible to separate and reuse building components in the future.
- 4A material logbook records materials already present in a building so they can be treated as_____rather than waste.
Hint
The record helps identify materials that may be recovered later.
Answer
recyclable materials
Explanation
Documenting existing materials makes it easier to recognize and manage them as recyclable materials.
- 5A building resource passport could document the materials in a building and support their future_____.
Hint
Consider what information about building materials can enable when a building is altered or dismantled.
Answer
reuse
Explanation
A building resource passport records material information and can help materials be reused in future projects.
- 6The zero-waste hierarchy favors retaining current materials in their existing_____when possible.
Hint
Think about whether keeping a component intact is preferable to processing or replacing it.
Answer
shape
Explanation
The content emphasizes retaining materials in the shape they already have as the best option in the zero-waste hierarchy.
- 7A circular approach considers a building's materials throughout their life cycle, from production to demolition and_____.
Hint
This is the final stage named when assessing a building's environmental costs.
Answer
disposal
Explanation
The true environmental cost of construction includes impacts from production through demolition and disposal.
- 8The construction sector contributes substantially to climate change partly because producing building materials consumes energy and creates_____.
Hint
Think about greenhouse gases released during material production.
Answer
emissions
Explanation
Material production uses energy and generates emissions, making construction a major climate challenge.
- 9The content argues that circular construction requires changes in mindset as well as in regulations, guidelines, and building_____.
Hint
These formal rules shape what construction practices are permitted.
Answer
laws
Explanation
Changing regulations, guidelines, and building laws can make reusable and recyclable materials easier to use.
- 10To make circular construction more widespread, the content says renewable-material producers need to be_____.
Hint
Small manufacturers need help to compete and advance their materials.
Answer
supported
Explanation
Small manufacturers produce renewable building materials, and the content says they need support to move this type of construction forward.
- 11The content describes the construction sector as a major user of extracted raw materials, with about 90% of Germany's extracted materials flowing into_____.
Hint
The statistic concerns where natural materials such as forest products and gravel are used.
Answer
the construction industry
Explanation
The content states that roughly 90% of raw materials extracted in Germany flow into the construction industry.
- 12The construction industry's reported carbon footprint in the content is about_____.
Hint
Recall the approximate share linked to construction in the discussion of climate impacts.
Answer
40%
Explanation
The content cites a 40% carbon footprint associated with the construction industry.
- 13Straw binds greenhouse gases as it_____and requires little energy during production.
Hint
Consider what a growing plant does before it becomes a building material.
Answer
grows
Explanation
Straw is environmentally advantageous because it binds greenhouse gases while growing and takes little energy to produce as a material.
- 14The air pressed out during baling helps make a bale of straw not excessively_____.
Hint
The question concerns fire behavior, not structural strength.
Answer
flammable
Explanation
The content explains that compressed straw is not excessively flammable, especially when plastered several times with clay.
- 15Repeated plastering with_____further helps protect straw walls from fire.
Hint
This natural wall finish is also used in the house's interior walls.
Answer
Clay
Explanation
The content says a bale of straw is especially not excessively flammable when it is plastered with clay several times.
- 16Loadbearing straw-bale construction uses compressed straw bales as the building's_____blocks.
Hint
These blocks form the walls that support the roof.
Answer
holding
Explanation
The straw bales are compressed and used as the holding blocks in loadbearing straw-bale construction.
- 17In the straw house, the loadbearing straw walls were designed to support a roof weighing several_____.
Hint
The roof's weight made its installation a major structural test.
Answer
tons
Explanation
The walls were intended to be the only support for a roof weighing several tons.
- 18Because straw bales vary in how they are compressed and how the straw has grown, builders must adapt each bale to the_____at hand.
Hint
Builders may turn or trim a bale to fit a particular part of the structure.
Answer
wall
Explanation
Every bale has its own characteristics, so builders adjust the bales as they construct each wall.
- 19Straw-bale buildings were described as requiring approval on a_____-by-case basis.
Hint
The approval process considers each project individually.
Answer
case
Explanation
The content says permits for this kind of non-prefabricated house are given on a case-by-case basis.
- 20The straw-house project planned a plant-based purification system for its_____.
Hint
This is wastewater that is treated with plants, unlike toilet waste in the described system.
Answer
gray water
Explanation
The house's circulation system uses plant-based purification for gray water and compost toilets for black water.
- 21The straw house's black-water system relies on_____.
Hint
This alternative handles toilet waste without connecting to conventional sewage.
Answer
compost toilets
Explanation
The planned closed system uses compost toilets for black water rather than a sewage connection.
- 22A straw-house design used a round guest house and a separate_____house.
Hint
This is the primary residence, distinct from the guest building.
Answer
main
Explanation
The couple planned to build both a round guest house and a main house, doing much of the work themselves.
- 23Before the COVID pandemic, a straw house cost about 3% more than an ordinary_____.
Hint
The comparison is with conventional residential construction.
Answer
house
Explanation
The content reports that before the pandemic, straw-house construction cost about 3% more than an ordinary house.
- 24The content gives approximate counts of 700 straw houses in Austria, 1,000 in Germany, and 10,000 in_____.
Hint
This country had the largest of the three stated totals.
Answer
France
Explanation
The stated approximate totals are around 700 in Austria, 1,000 in Germany, and 10,000 in France.
- 25Natural building materials such as straw can be harder to scale because they depend on small producers and substantial_____labor.
Hint
This work is performed directly by people rather than automated industrial production.
Answer
manual
Explanation
The content notes that straw construction depends heavily on manual labor and on small producers of building materials.
- 26In the Slovenian renovation project, the old farm's materials were documented with a material_____so they could be treated as recyclable.
Hint
This record identifies the materials found in the building.
Answer
logbook
Explanation
The material logbook was created to record existing materials and make it possible to treat them as recyclable materials rather than waste.
- 27The old farm renovation was chosen instead of demolition after the owner recognized that the existing house was already a potential zero-waste_____.
Hint
The realization was that a useful structure already existed on the property.
Answer
house
Explanation
The owner reconsidered demolition and concluded that keeping the existing house in use was the more sustainable option.
- 28A road clause in the property's sales contract disrupted the original plan to demolish the farm and build a new_____.
Hint
This was the planned replacement structure, designed to be dismantled.
Answer
wooden house
Explanation
The owner had overlooked a clause regarding a road on the property, which caused the original new-house plan to fall through.
- 29The old farm's 60-centimeter-thick ground-floor walls were described as providing good_____.
Hint
This property helps limit heat transfer through the walls.
Answer
insulation
Explanation
The content contrasts the thick ground-floor walls, which insulate well, with the drafty, never-inhabited attic.
- 30Before deciding whether to keep the farm's roof, the owner wanted the old building materials thoroughly_____.
Hint
The examination was meant to determine whether the structure still had integrity.
Answer
inspected
Explanation
Inspecting the materials and structure would establish whether the roof could be renovated safely or would need replacement.
- 31If more than 20% of the old beams could not be saved, the roof structure would have to be completely_____.
Hint
This outcome would make the renovation unaffordable for the owner.
Answer
replaced
Explanation
The content says that if just 20% of the old beams were beyond saving, the roof structure would need complete replacement.
- 32The renovated farm's roof was reinforced and given space for 40 centimeters of natural_____.
Hint
This material layer improves the roof's thermal performance.
Answer
insulation
Explanation
After removing the old tiles and raising the beams, the project made room for 40 centimeters of natural insulation.
- 33To create additional roof space and reinforce the structure, the beams were raised by an additional 12_____.
Hint
This measurement refers to the height added to the beams.
Answer
centimeters
Explanation
The renovation raised the beams by an additional 12 centimeters, creating more space and strengthening the structure.
- 34The farm renovation used wood-fiber boards and aimed to avoid installing an air-conditioning_____.
Hint
This mechanical device cools indoor air.
Answer
unit
Explanation
The project added wood-fiber boards and sought to avoid an air-conditioning unit in favor of a natural building approach.
- 35A building that combines existing and newer construction methods can be understood as a_____of old and modern techniques.
Hint
This word describes a combination of different approaches.
Answer
synthesis
Explanation
The renovated house became a synthesis of old and modern building techniques rather than a completely zero-waste new build.
- 36The renovation was estimated to cost about €200,000, which was described as much less than constructing a_____building.
Hint
The comparison is with starting over rather than adapting the existing house.
Answer
new
Explanation
The owner estimated the renovation at €200,000, considerably less than the cost of a new building.
- 37In the renovation project, worm-eaten and damaged materials sometimes had to be discarded, illustrating that some waste cannot always be_____.
Hint
Even a project designed to reduce waste may encounter materials that cannot be saved.
Answer
avoided
Explanation
The project tried to avoid waste, but structural damage meant that some materials could not be retained.
- 38Hempcrete is a composite made from hemp, chalk, and_____.
Hint
This ingredient is added to the dry materials before application.
Answer
water
Explanation
The content identifies hempcrete as a mixture of chalk, hemp, and water.
- 39Hempcrete is sprayed into wall and floor compartments, where it eventually_____.
Hint
The mixture changes from a wet material into a solid building layer.
Answer
hardens
Explanation
After being sprayed into compartments in walls and floors, the hempcrete mixture hardens.
- 40Compared with polyethylene, hemp insulation allows walls to_____.
Hint
This describes the walls' capacity to manage moisture rather than trapping it.
Answer
breathe
Explanation
The content contrasts hemp insulation with polyethylene by noting that hemp walls can breathe.
- 41Hemp insulation can help create an excellent indoor_____.
Hint
This describes the comfort conditions inside the building.
Answer
climate
Explanation
The content says hemp insulation contributes to an excellent indoor climate.
- 42In addition to insulating, hempcrete is a good acoustic_____.
Hint
This property relates to reducing sound transmission.
Answer
insulator
Explanation
Hempcrete provides acoustic insulation as well as thermal insulation.
- 43The hemp used in the renovation project came from_____.
Hint
The material crossed a nearby national border to reach Slovenia.
Answer
Hungary
Explanation
The content says the hemp used for the insulation came from Hungary.
- 44The hemp mixture's environmental balance was described as very good because it requires minimal_____.
Hint
The claim concerns the resources needed to produce and apply the insulation.
Answer
energy
Explanation
Hempcrete was presented as having a good environmental balance because its energy requirements are minimal.
- 45Hempcrete insulation was proposed as an alternative to conventional synthetic insulation such as_____.
Hint
This material was contrasted with breathable hemp walls.
Answer
polyethylene
Explanation
The content contrasts the breathable hemp insulation with polyethylene, which does not provide the same wall-breathing quality.
- 46The hempcrete project reflects a broader return to natural building after hemp cultivation had declined in the region following_____.
Hint
The content refers to changes after Yugoslavia broke apart.
Answer
independence
Explanation
The speaker says hemp cultivation in Slovenia had declined after independence, despite its earlier prominence in Yugoslavia.
- 47Straw and clay construction can face economic and institutional disadvantages because conventional materials have benefited from decades of_____.
Hint
This has helped create a perception that new products are better than older or natural ones.
Answer
advertising
Explanation
The content argues that decades of advertising have encouraged people to regard new products as superior, while natural-material producers lack a strong lobby.
- 48Before demolition, examining a building for reusable and recyclable components is known as urban_____.
Hint
This approach treats buildings as sources of materials, like a mine.
Answer
mining
Explanation
Urban mining assesses buildings as sources of raw materials that can be recovered and used again.
- 49Urban mining treats each building as a kind of raw-material_____.
Hint
The metaphor emphasizes recovering resources already present in buildings.
Answer
mine
Explanation
The approach views existing buildings as repositories of materials rather than simply as structures to discard.
- 50A material check before demolition should identify materials that are reusable or at least_____.
Hint
Some components may not be reusable intact but can still be processed into new materials.
Answer
recyclable
Explanation
The material assessment checks for both reusable components and materials that can at least be recycled.
- 51For materials to be recovered efficiently, they should be easy to_____.
Hint
This is especially important when a building is dismantled.
Answer
separate
Explanation
The content says materials need to be easy to separate for effective recovery and recycling.
- 52The annual construction-waste figure cited for Germany is about 74 million_____.
Hint
This is the unit used for the quantity of discarded building material.
Answer
tons
Explanation
The content identifies the disposal of approximately 74 million tons of construction waste per year in Germany as a growing concern.
- 53An assessment of whether a building can be modernized may consider wooden-beam ceilings a major_____because of concerns about future structural stability.
Hint
The content uses an informal term for a factor that can undermine the case for modernization.
Answer
killer
Explanation
Wooden-beam ceilings are often seen as a modernization obstacle because they may create structural stability concerns over a 50- or 100-year life cycle.
- 54The content argues that the impacts of demolition should be considered before it happens, so planners can determine what must be_____.
Hint
The goal is to take stock of recoverable resources in advance.
Answer
recycled
Explanation
Taking stock before demolition helps identify which materials can and must be recycled in the future.
- 55A building component catalog can record materials and their potential_____savings.
Hint
The information can help compare environmental impacts of building components.
Answer
emission
Explanation
The catalog developed from the work contains information about materials and associated emission savings.
- 56In the long term, an existing component can be reused for a new_____rather than discarded.
Hint
The component may serve a second life in another building project.
Answer
construction
Explanation
The content gives the example of a component in good condition being suitable for use in new construction.
- 57The content says Germany seals about 200 square kilometers of land per_____.
Hint
The figure describes the rate at which land is covered.
Answer
year
Explanation
The content cites approximately 200 square kilometers of land sealed per year in Germany.
- 58Redensification seeks to create more living space in existing urban areas while also protecting the_____.
Hint
This urban-planning strategy tries to address housing demand without ignoring environmental effects.
Answer
climate
Explanation
The content presents redensification as a way for cities to create more living space while protecting the climate.
- 59Before demolition, a building's components can be checked and cataloged as part of an_____-mining approach.
Hint
This term describes recovering materials from the built environment.
Answer
urban
Explanation
Urban mining catalogs building components to identify what can be reused or recycled before a structure is demolished.
- 60The content suggests that renovation can emit less carbon dioxide than constructing a new, highly insulated building, even when the existing building is_____renovated.
Hint
The comparison highlights the emissions of new construction, not the ideal condition of the old building.
Answer
poorly
Explanation
The content states that even the best new highly insulated building emits more carbon dioxide than a poorly renovated existing building.
- 61Recycled concrete, or R concrete, incorporates recovered concrete and bricks into a new building's_____.
Hint
These building parts were made from sorted and recycled demolition materials.
Answer
facades and walls
Explanation
The town hall example used old concrete and bricks, sorted and recycled nearby, in its facades and walls.
- 62The R in R concrete stands for_____.
Hint
It names the process of recovering materials for another use.
Answer
recycling
Explanation
The content explicitly defines R concrete as concrete associated with recycling.
- 63The recycled-concrete town hall was reported to produce 7% fewer emissions than a building using conventional_____.
Hint
The comparison is with the standard material whose cement production is energy- and emissions-intensive.
Answer
Concrete
Explanation
The town hall using R concrete was reported to produce 7% fewer emissions than conventional concrete construction.
- 64Cement production is both energy-intensive and emissions-intensive, so using less cement conserves valuable_____.
Hint
The benefit is not limited to reducing emissions; it also reduces demand for materials.
Answer
resources
Explanation
Reducing cement use saves resources because cement production consumes substantial energy and produces emissions.
- 65Recycled brick chippings in a building facade can make urban_____visible.
Hint
The facade displays recovered materials from the built environment.
Answer
mining
Explanation
The content points to brick chippings in the facade as a visible sign of urban mining.
- 66The town hall project was described as Germany's first_____mining project.
Hint
The project recovered materials from an existing building for a new one.
Answer
urban
Explanation
The content describes the recycled-material town hall as the first urban mining project in Germany.
- 67Circular construction favors plugging and screwing over gluing and_____so materials can be separated later.
Hint
These methods permanently join materials and make later separation harder.
Answer
bonding
Explanation
The content says that plugging and screwing should replace gluing and bonding to enable future dismantling.
- 68Designing a building so its materials can be separated by type in the future makes them easier to_____.
Hint
Separated materials can be recovered as distinct material streams.
Answer
recycle
Explanation
The town hall's design enables future separation by material type, which supports recycling and further use.
- 69A digital tool called the urban mining index helps planners assess material impacts and_____.
Hint
It measures how readily components can enter a circular materials system.
Answer
recyclability
Explanation
The urban mining index quantifies and combines information about materials, emissions, and the recyclability of building components.
- 70The urban mining index was developed to measure_____and help persuade decision-makers with figures.
Hint
This term describes how well materials remain in a reusable loop.
Answer
circularity
Explanation
The index offers a way to measure circularity and present its value using simple figures.
- 71The recycling encyclopedia compared conventional construction with recyclable construction and found that closed-loop projects were more economical in the_____.
Hint
The advantage may not be apparent if only immediate costs are considered.
Answer
long term
Explanation
For the three projects studied, recycling-friendly or closed-loop construction proved more economical over the long term.
- 72A demolition contractor helped calculate the actual costs of dismantling and_____.
Hint
These costs occur after materials have been taken apart.
Answer
disposal
Explanation
The field research used a demolition contractor to estimate real dismantling and disposal costs for the recycling encyclopedia.
- 73A green roof can reduce the effects of heavy rainfall by storing_____.
Hint
The roof temporarily holds precipitation instead of allowing it all to run off immediately.
Answer
water
Explanation
The content explains that green roofs counteract climate-change effects by storing water from heavy rainfall.
- 74A green roof needs a watertight layer beneath it so rain does not pass through the_____.
Hint
The layer protects the building below the planted surface.
Answer
roof
Explanation
The project had to seal the green roof because the roof must be watertight to protect the living space.
- 75For the green-roof covering to be installed, the seams in its plastic film needed to be_____.
Hint
Wet seams would interfere with making a reliable seal.
Answer
dry
Explanation
The builders noted that the seams had to be dry before they could install and seal the plastic film.
- 76The small plants for the green roof were grown in advance and would later be placed on the_____.
Hint
They were prepared before being installed on the building's upper surface.
Answer
roof
Explanation
The plants were grown in advance and were to be placed on the green roof later.
- 77The house's planned energy systems included photovoltaics and solar_____.
Hint
This system uses sunlight to provide heat rather than electricity alone.
Answer
thermal energy
Explanation
The couple planned to produce their own electricity and heat using photovoltaics and solar thermal energy.
- 78A compost toilet should smell less than a regular toilet, though the builders planned to see how it worked in_____.
Hint
They had not yet tested the toilet in everyday use.
Answer
practice
Explanation
The builders expected a compost toilet not to smell as bad as a regular toilet but planned to find out through actual use.
- 79The straw-house builders postponed the main house because continuing on the original schedule would have been too stressful and_____.
Hint
This describes the physical and emotional toll they wanted to avoid.
Answer
exhausting
Explanation
After the guest house work and its organization required substantial effort, the couple chose to delay the main house rather than continue an exhausting schedule.
- 80The green-roof project illustrates that sustainable building sometimes requires practical choices to protect one's living_____.
Hint
The builders said they needed to seal the roof because this is where they live.
Answer
space
Explanation
The content notes that some choices may not be completely sustainable, but sealing the roof was necessary to protect the household's living space.

Ask anything