Indonesia’s Energy Transition Plan
Indonesia’s Electricity Plan and Southeast Asia’s Clean Energy Transition
The RUPTL and its importance
The RUPTL is Indonesia’s ten-year electricity supply business plan, issued by PLN, the country’s state-owned electricity provider. The draft RUPTL for 2025–2034 describes the power projects expected to be developed over that period, including their locations, timing, and energy sources. It also provides an indication of how electricity demand and supply are expected to be managed.
Because power plants and related infrastructure operate for many years, decisions in the RUPTL can shape Indonesia’s electricity system well beyond the plan’s immediate timeframe. The plan therefore influences whether the country’s grid continues to depend heavily on fossil fuels or moves more rapidly toward renewable energy.
A CREA analysis of the draft plan identifies a proposed direction that delays renewable deployment while expanding fossil-fuel infrastructure, particularly gas-fired power. This raises concerns that new fossil projects could commit the country to decades of emissions and make later decarbonization more difficult. The plan’s timing matters: delaying clean-energy projects while adding fossil capacity can shape the grid’s development path for years to come.
Electricity planning is also climate, health, and economic planning
Electricity planning affects more than the power supply. It has consequences for national emissions, public health, economic choices, and people’s everyday lives.
Climate: Power generation is a significant source of Indonesia’s emissions. The infrastructure selected in the RUPTL influences the country’s ability to reduce emissions from its electricity system.
Public health: Coal and other fossil-fuel power generation release air pollutants as well as carbon emissions. The energy mix can therefore affect health and public welfare.
Economic direction: The plan influences which kinds of infrastructure and energy industries receive investment, and whether Indonesia builds capacity around fossil fuels or clean energy.
Daily life: Electricity supports households, transport, digital services, and other increasingly electrified activities. Decisions about how it is generated affect the people who use and pay for it.
The RUPTL is also connected to Indonesia’s climate commitments. The discussion notes that the country has released a second Nationally Determined Contribution (NDC), and that electricity planning should align with the emissions direction set out in national climate policy. Consistency between electricity plans and climate commitments is important: ambitious targets are difficult to meet if power-sector investments move in the opposite direction.
Renewable energy and fossil-fuel expansion
A central concern raised about the draft plan is the contrast between the proposed expansion of fossil-fuel power and the slower timing of renewable development. The discussion argues that clean energy has been shown to be cost-effective, making the prioritization of fossil infrastructure an important policy question.
The issue is not only which technologies appear in the plan, but also when they are added. If fossil-fuel capacity is developed first and renewable deployment is postponed, the result may be:
Continued reliance on fossil fuels in the electricity mix.
Long-lived infrastructure that is difficult to replace quickly.
A risk of carbon lock-in, in which investments and system arrangements prolong emissions.
A more challenging path toward decarbonizing the grid later.
The broader concern is that fossil-fuel expansion may be inconsistent with stated ambitions to accelerate the phaseout of fossil power and develop a clean-energy future. The plan’s choices must therefore be assessed against both near-term electricity needs and long-term emissions goals.
Transparency and public participation
Energy planning is sometimes treated as a highly technical subject, but it has direct public consequences. Electricity is paid for by consumers, and decisions about its production affect communities, public health, and the country’s future development. This makes transparency in planning important to more than technical specialists.
Greater transparency helps the public understand:
What kinds of power projects the government intends to build.
Whether the plan prioritizes renewable energy or fossil fuels.
How demand and supply assumptions are being made.
Whether communities and relevant experts have been consulted.
How pollution and other public-welfare impacts are being considered.
The planning process should include civil society, local communities, national and international experts, environmental groups, and young people. These groups can contribute different kinds of knowledge, including local experience and technical analysis. Their participation can help make decisions more informed and responsive to the people affected by them.
Energy decisions also require attention to the social and economic dimensions of the transition. For example, discussion of critical minerals should consider who benefits from their extraction and use, how impacts are managed, and whether the process is fair. A just transition requires attention not only to energy infrastructure, but also to the distribution of its benefits and burdens.
Energy planning and public welfare
The connection between energy and public welfare is especially clear in the relationship between fossil power and air pollution. CREA’s work focuses in part on the health impacts of pollution from fossil-fuel power generation. Considering these impacts makes it possible to evaluate electricity planning not only in terms of capacity and cost, but also in terms of its consequences for people.
A thoughtful transition should consider:
How emissions and pollution from existing and proposed power plants are controlled.
Whether clean-air and energy policies reinforce one another.
How communities are affected by power projects.
Whether the transition is planned in a way that supports public welfare.
Energy planning is therefore a societal issue as well as a technical process. Its decisions affect health, environmental conditions, and the way the economy develops.
Regional implications for Southeast Asia
Indonesia’s choices have significance beyond its borders. It is described as the region’s largest country by population and economy, and its largest emitter. Its electricity strategy can therefore influence the direction and ambition of the wider Southeast Asian energy transition.
If Indonesia postpones renewable energy and expands fossil infrastructure, that may send a discouraging signal to other countries. Conversely, faster clean-energy deployment could help build regional momentum and encourage more ambitious planning.
The regional opportunity includes developing clean-technology supply chains that serve more than one national market. Stronger supply chains could support deployment and improve the availability and affordability of clean-energy technologies. Regional cooperation can also help countries coordinate the systems needed to move electricity across borders.
Regional cooperation, energy security, and integration
The ASEAN power grid is part of a broader discussion about how Southeast Asia’s energy systems could become more interconnected. Regional cooperation can support:
Transmission links that allow electricity to move between countries.
Electricity trade integration and the sharing of renewable resources.
Coordinated energy planning that takes neighboring countries’ decisions into account.
Regional supply chains for clean-energy technologies.
Energy security and economic resilience through stronger connections among national systems.
The region’s countries can learn from one another. The discussion points to Vietnam’s solar deployment as an example of faster renewable-energy progress that may help raise ambition elsewhere. When countries coordinate more effectively, they can prepare collectively for energy-security concerns and make better use of renewable resources across the region.
Collaboration is not only a technical matter. It also depends on political will, supporting policies, and practical arrangements for transmission and trade. Regional integration can help turn national clean-energy goals into a more coordinated shared transition.
Steps identified for Indonesia
The discussion identifies several priorities for strengthening Indonesia’s clean-energy direction.
Align national plans with stated ambitions
National electricity planning should be consistent with the country’s public commitments and climate objectives. This requires reviewing how electricity demand, supply, and infrastructure plans fit together, and ensuring that the decisions in the RUPTL support the intended emissions pathway.
Create conditions for renewable-energy growth
Renewable deployment requires an enabling environment, including policies and planning that support the development of clean-energy projects. The discussion also calls for reconsidering how subsidies are arranged, arguing that fossil fuels should no longer receive subsidies.
Improve transparency and inclusion
Planning should make information more accessible and allow meaningful participation by experts, civil society, environmental groups, local communities, and the public. Broad participation can help bring technical decisions into public discussion and ensure that social and environmental concerns are considered.
Strengthen accountability and implementation
Plans must be carried out, not merely published. The discussion raises concerns about a lack of implementation of the previous plan and asks how Indonesia can ensure that planned projects and targets move forward. Effective accountability requires clarity about:
Who is responsible for each target.
Who monitors and enforces implementation.
Who reports on progress.
How the public can see whether projects are actually advancing.
Without clear responsibilities and transparent reporting, ambitious targets may not translate into completed projects or measurable progress.
What individuals and organizations can contribute
Electricity planning affects everyone as more aspects of daily life become electrified. Public awareness and engagement can help bring wider perspectives into a process often regarded as technical or specialized.
People and organizations can contribute by:
Asking for transparent electricity planning and public reporting.
Encouraging timely progress on clean-energy projects.
Bringing affected communities and other stakeholders into discussions.
Supporting scrutiny of whether government plans match stated climate ambitions.
Timeliness is crucial because the decisions made during the current decade can shape the electricity system for many years. Public engagement can help ensure that future aspirations are reflected in policy and that clean-energy plans are acted upon.
Indonesia’s electricity plan is a long-term decision about the country’s emissions, public welfare, and economic direction—and, given Indonesia’s influence, about the momentum of Southeast Asia’s wider energy transition.
The transition depends on aligning national plans with clean-energy goals, implementing projects effectively, and coordinating across the region to support reliable, fair, and lower-emission electricity systems.

Ask anything
We've read this whole study set, so questions about it get the best answers.