- 1To reduce reliance on any single weather-dependent source, a renewable grid uses_____across energy sources and locations.
Hint
Think of spreading generation across different sources and places.
Answer
diversification
- 2In the UK example, the organization responsible for balancing electricity supply and demand is the_____.
Hint
It is abbreviated NESO.
Answer
National Energy System Operator
- 3NESO anticipates electricity supply and demand using highly accurate_____rather than waiting to react to the weather.
Hint
These estimates help the operator plan ahead.
Answer
forecasts
- 4In the UK system described, each 30-minute window for organizing electricity delivery is called a_____period.
Hint
It is the name for the market's half-hour time window.
Answer
settlement
- 5The market deadline about one hour before a settlement period, after which participants' submissions are locked, is called_____.
Hint
This is when the market menu closes.
Answer
gate closure
- 6At gate closure, generators submit a_____stating how many megawatts they plan to put onto the grid.
Hint
It is the participant's declared physical generation plan.
Answer
final physical notification
- 7At gate closure, participants also submit_____that state prices for turning generation up or down.
Hint
These are the price entries on NESO's balancing menu.
Answer
offers and bids
- 8After comparing declared generation with its demand forecast, NESO uses the_____to select power actions in real time.
Hint
This is the system used to close a gap between supply and demand.
Answer
balancing mechanism
- 9NESO's primary selection objective is to find the cheapest possible mix, but it must also respect network and_____constraints.
Hint
This constraint concerns keeping the electricity system operating reliably.
Answer
grid stability
- 10If transmission cables from Scotland toward London are full, NESO may pay a Scottish wind farm to turn off and a nearer plant to turn on because of a_____.
Hint
The limitation is the physical capacity of transmission lines.
Answer
network constraint
- 11The UK grid must be kept at a frequency of_____to help avoid blackouts.
Hint
It is the target frequency stated for the UK grid.
Answer
50 Hz
- 12When wind generation falls, NESO can balance the system with other resources, such as batteries or imported_____power from Norway.
Hint
This type of power comes from water and can travel through an undersea interconnector.
Answer
hydroelectric
- 13A transmission cable connecting electricity systems across a body of water, such as the link to Norway, is an_____.
Hint
It links one electricity system to another.
Answer
interconnector
- 14Because gas plants can be dispatched quickly, they have often supplied flexible balancing power in the UK, but replacing them requires more than_____alone.
Hint
The missing strategy is the first of the four defenses described.
Answer
diversification
- 15The four-part defense against variable renewable generation consists of diversification, overbuilding, storage, and_____.
Hint
This strategy changes when or how electricity is used.
Answer
demand response
- 16For fossil-fuel plants, ongoing spending on fuel is an example of_____.
Hint
This is commonly shortened to opex and recurs while the plant operates.
Answer
operating expenditure
- 17The large upfront cost of purchasing and installing renewable energy hardware is called_____.
Hint
This is commonly shortened to capex.
Answer
capital expenditure
- 18Unlike natural gas, the wind and sunlight used by renewable generators have no fuel purchase cost, so their ongoing_____is negligible.
Hint
This abbreviation refers to ongoing operating expenditure.
Answer
opex
- 19Because solar panels have become inexpensive, a solar farm can be economically designed with more panel capacity than its inverter can output; this is called_____.
Hint
It means installing capacity beyond the system's rated output.
Answer
overbuilding
- 20The measure comparing solar panel direct-current capacity with inverter alternating-current capacity is the_____.
Hint
It compares the panels' DC rating with the inverter's AC rating.
Answer
DC to AC ratio
- 21A solar farm with 10 megawatts of panels and a 10-megawatt inverter has a DC to AC ratio of_____.
Hint
The panel and inverter capacities are equal.
Answer
1.0
- 22The typical DC to AC ratio given for standard commercial solar projects is_____.
Hint
This indicates panels are sized above inverter capacity.
Answer
1.2 to 1.4
- 23Oversizing solar panels helps an inverter operate closer to its rated output for a larger fraction of the_____.
Hint
The benefit is spread across the annual cycle of sunlight conditions.
Answer
year
- 24The main purpose of grid-scale storage is to shift renewable electricity through_____rather than only changing where it is generated.
Hint
Storage lets power generated earlier be used later.
Answer
time
- 25Pumped hydroelectric storage stores excess electricity by pumping water to a high-elevation_____.
Hint
The water is held at height until it is needed to generate power.
Answer
reservoir
- 26When power is needed from pumped hydro storage, water flows back through_____to generate electricity.
Hint
The returning water turns these machines.
Answer
turbines
- 27The UK facility in Wales built inside a hollowed-out slate mountain is the_____power station.
Hint
It is the largest pumped hydro facility mentioned in the UK example.
Answer
Dinorwig
- 28Dinorwig can supply a maximum power of_____gigawatts.
Hint
This is the facility's stated power output, not its energy storage capacity.
Answer
1.7
- 29Dinorwig's stated storage capacity is roughly_____gigawatt-hours.
Hint
This figure measures stored energy rather than power output.
Answer
9.1
- 30At maximum power, Dinorwig can discharge for_____hours.
Hint
Use the stated duration, which is slightly more than five hours.
Answer
over 5
- 31Compressed air energy storage stores energy by pumping air into a large underground_____.
Hint
It is an underground space that holds the compressed air.
Answer
cavern
- 32The compressed air plant described as the world's largest, located in Jiangsu province, has a capacity of_____megawatts.
Hint
This figure is the plant's power capacity.
Answer
600
- 33The Jiangsu compressed air plant stores_____gigawatt-hours of energy without burning fuel.
Hint
This figure is its energy storage capacity.
Answer
2.4
- 34Historically, grid batteries were mainly used for_____response, injecting power within seconds after a sudden frequency drop.
Hint
This rapid service helps stabilize the grid after a disturbance.
Answer
frequency
- 35The newer battery role of storing renewable electricity and releasing it over multiple hours is called_____.
Hint
This contrasts with the earlier short-duration frequency response role.
Answer
energy shifting
- 36The share of new battery projects dedicated to bulk energy shifting rose from 40% in 2015 to over_____by 2025.
Hint
The figure is more than nine-tenths of new projects.
Answer
90%
- 37In the UK example, operational battery capacity is around_____gigawatts.
Hint
This is the approximate national battery power capacity given.
Answer
6.9
- 38Demand response changes the timing or amount of electricity use so that demand can autonomously follow_____.
Hint
This reverses the traditional expectation that generation must follow demand.
Answer
supply
- 39Demand response focuses on flexible, often invisible electricity loads whose timing can change without negatively affecting the_____.
Hint
This is the person or organization using the electricity.
Answer
end user
- 40In the UK, NESO's mechanism for paying suppliers to encourage customers to shift electricity use is the demand_____service.
Hint
The service enables electricity use to move to different times.
Answer
flexibility
- 41Octopus Energy's customer program that rewards shifting electricity use is called_____sessions.
Hint
The program name describes the opportunity to save money.
Answer
saving
- 42By encouraging customers to shift appliance use, Octopus reportedly moved_____gigawatt-hours of demand.
Hint
This is the reported amount of shifted energy.
Answer
1.86
- 43The reported peak power reduction achieved through those customer shifts was_____megawatts.
Hint
This reduction was compared with the output of a small gas plant.
Answer
188
- 44An electric vehicle can act as a distributed grid resource because it is essentially a grid battery on_____.
Hint
It can store electricity while serving as a vehicle.
Answer
wheels
- 45Smart EV charging can pause during the high-price evening peak and resume later when demand falls and offshore wind is high, using cheaper_____power.
Hint
The term describes renewable electricity in this example.
Answer
green
- 46The global demand response capacity projected to be needed by 2030 to meet net-zero targets is_____gigawatts.
Hint
This is the total global capacity projection.
Answer
500
- 47Of the projected 500 gigawatts of global demand response capacity needed by 2030, roughly_____gigawatts are expected to come from electric vehicles.
Hint
This is about one-tenth of the total projection.
Answer
50
- 48Treating EVs, commercial heating and air conditioning, and cold storage warehouses as flexible loads reduces the grid's peak capacity_____.
Hint
These are the maximum supply needs the grid must be built to meet.
Answer
requirements
- 49The reasoning error that combines the true premise that weather is unpredictable with the false conclusion that renewables cannot be relied on is a_____.
Hint
It presents an unjustified either-or conclusion.
Answer
false dilemma
- 50Brandolini's law says refuting a misleading claim takes an order of magnitude more_____than producing it.
Hint
The law compares the effort required to create and rebut a claim.
Answer
energy
- 51A debating tactic that oversimplifies an opposing view to make it easier to attack is a_____argument.
Hint
It replaces a real position with an easier-to-defeat version.
Answer
strawman
- 52Imagining one wind turbine directly powering one television misrepresents how a national electricity_____operates.
Hint
It is the interconnected system that balances many generators and users.
Answer
grid
- 53The claim that one unpredictable wind turbine makes the entire grid unreliable overlooks how aggregating many generators reduces short-term_____.
Hint
This refers to rapid variability in the combined output.
Answer
volatility
- 54The mathematical principle that makes the results of many coin flips approach an even split is the_____.
Hint
It explains why aggregate outcomes become more predictable as the number of trials grows.
Answer
law of large numbers
- 55A political use of the question about windless periods can function as a rhetorical device intended to_____discussion before engineering solutions are considered.
Hint
The phrase describes preventing a conversation from continuing.
Answer
shut down
- 56When a person asks how renewables work during low-wind periods in good faith, the question is still a_____one.
Hint
It is a reasonable question that points to a real engineering issue.
Answer
legitimate
- 57The final roughly_____of the transition to a fully decarbonized grid is expected to be much harder than reaching about 70% clean energy.
Hint
This is the remaining share needed to reach absolute net zero.
Answer
30%
- 58The current cost of keeping batteries and backup gas plants on standby is largely_____through energy bills.
Hint
This means the costs are spread across customers rather than borne only by one developer.
Answer
socialized
- 59Financial penalties imposed when a wind farm misses its promised generation target at gate closure are called_____charges.
Hint
The name refers to a mismatch between promised and delivered power.
Answer
imbalance
- 60When many renewable generators produce at the same time, their output can exceed demand and create the_____effect.
Hint
The term describes renewable generators reducing one another's market revenues.
Answer
cannibalization
- 61When renewable supply greatly exceeds demand, wholesale electricity prices can become_____rather than merely reaching zero.
Hint
In this situation, the price falls below zero.
Answer
negative
- 62A market design that pays companies for being capable of providing power on demand is called a_____market.
Hint
It rewards available power capability, not only electricity actually generated.
Answer
capacity
- 63One proposed way to address both standby-cost allocation and renewable revenue problems is to redesign how the electricity market_____power.
Hint
The proposal concerns the market's method of assigning worth to available electricity and capability.
Answer
values
- 64The stabilizing effect of the momentum of heavy spinning rotors in conventional power plants is called grid_____.
Hint
It helps prevent frequency from changing too rapidly after a disturbance.
Answer
inertia
- 65Traditional gas and nuclear plants provide inertia through massive_____spinning at thousands of rotations per minute.
Hint
These are the heavy rotating components inside the plants.
Answer
rotors
- 66Solar panels and wind turbines connect to the grid through_____that can stop almost instantaneously.
Hint
These devices convert and control electrical power between the generator and grid.
Answer
inverters
- 67As spinning rotors are replaced with inverter-connected generation, the grid needs new technology to provide_____inertia.
Hint
It is an engineered substitute for the natural momentum of rotating machines.
Answer
artificial
- 68A geographic bottleneck arises because the windiest and sunniest locations are often far from the_____.
Hint
These are major centers of electricity demand.
Answer
cities
- 69Moving renewable electricity from remote resource-rich areas to cities requires new high-voltage_____lines.
Hint
These lines carry electricity over long distances.
Answer
transmission
- 70Local opposition summarized by the phrase not-in-my-backyard can delay transmission projects through permitting disputes lasting several_____.
Hint
The permitting delay can extend across multiple annual cycles.
Answer
years
- 71The progress of renewable energy is described as following an_____curve, with the final portion of the transition becoming more difficult.
Hint
The curve's name comes from its overall shape.
Answer
S
- 72Whether future grids will reach 90%, 95%, or 100% renewable generation remains an active debate among_____.
Hint
These are the people studying and assessing the transition.
Answer
experts
- 73Judging a future renewable grid only by the capabilities of today's infrastructure is misleading because the transition is highly_____.
Hint
The opposite would be assuming that technology and infrastructure remain unchanged.
Answer
dynamic
- 74The inability of today's grid geography to support tomorrow's generation is presented as an engineering_____rather than a failure.
Hint
It identifies work that still needs to be done.
Answer
road map
- 75The remaining obstacles to a highly renewable grid are characterized as logistical and economic problems, not invisible_____problems.
Hint
This refers to claims that the transition violates fundamental natural laws.
Answer
physics