The SS U.S. ship was studied as a distinctive building enclosure because it is a floating
structure rather than a land-based building.

55 questions

  1. 1
    The SS U.S. ship was studied as a distinctive building enclosure because it is a floating
    _____
    structure rather than a land-based building.
    Hint

    Think about the primary material and setting of the ship.

    Answer

    metal

  2. 2
    The project aimed to merge naval architecture with
    _____
    architecture while adapting the ship for a new use.
    Hint

    This type of architecture is contrasted with naval architecture.

    Answer

    traditional

  3. 3
    The SS U.S. ship is described as the world's largest
    _____
    liner of its time.
    Hint

    It transported passengers across the sea.

    Answer

    ocean

  4. 4
    In addition to transporting passengers, the ship could be transformed into a state-of-the-art security
    _____
    vessel.
    Hint

    This role relates to national security and defense.

    Answer

    military

  5. 5
    The ship's stories include immigrants crossing the sea to begin
    _____
    lives.
    Hint

    The phrase describes starting over in another place.

    Answer

    new

  6. 6
    A central project question was whether the ship could be reused as a future
    _____
    while reducing its carbon footprint.
    Hint

    The question concerned a place people might visit or inhabit in the future.

    Answer

    destination

  7. 7
    The project considered whether the ship could achieve
    _____
    zero performance.
    Hint

    This term describes balancing energy or emissions so the overall result is zero.

    Answer

    net

  8. 8
    The design approach treated the ship as a form of
    _____
    project because an existing structure was adapted for a new use.
    Hint

    This process upgrades or adapts an existing building or structure.

    Answer

    retrofit

  9. 9
    The ship's superstructure plate functions as both the
    _____
    barrier and the vapor barrier.
    Hint

    This barrier controls unintended movement of indoor air.

    Answer

    air

  10. 10
    The fact that water does not normally enter the ship helps explain why its metal superstructure can act as a
    _____
    barrier.
    Hint

    This barrier controls moisture in gaseous form.

    Answer

    vapor

  11. 11
    In a cold climate, the ship's enclosure must resist interior
    _____
    flow to control convective loops.
    Hint

    The movement occurs because of pressure and temperature differences inside the enclosure.

    Answer

    air

  12. 12
    The convective loops in the ship's enclosure are caused primarily by its hollow construction, not by the
    _____
    .
    Hint

    The speaker explicitly contrasts this cause with the hollow structure.

    Answer

    wind

  13. 13
    The ship's hollow enclosure creates a
    _____
    hull that can contain space for systems.
    Hint

    The term describes two adjacent layers or shells.

    Answer

    double

  14. 14
    A complete air barrier and interior
    _____
    help improve enclosure performance by reducing convective loops.
    Hint

    This divides a large continuous space into smaller sections.

    Answer

    compartmentalization

  15. 15
    In a high-performance wall, the thermal layer is preferably placed on the
    _____
    side of the structure.
    Hint

    This placement helps protect the structure from temperature changes.

    Answer

    outside

  16. 16
    Because the ship's outer steel plate served as the air controller, it had to be extremely
    _____
    .
    Hint

    A high-performing air barrier limits unintended leakage.

    Answer

    tight

  17. 17
    The ship contained 20 watertight compartments separated by
    _____
    bulkheads.
    Hint

    The number is less than the total number of compartments.

    Answer

    eight

  18. 18
    The primary purpose of the watertight bulkheads was to prevent water from moving between adjacent
    _____
    .
    Hint

    These are the separate spaces created by the bulkheads.

    Answer

    compartments

  19. 19
    The ship's structural grid runs continuously and contributes to
    _____
    through its watertight bulkheads and structural organization.
    Hint

    This is the division of a structure into controlled sections.

    Answer

    compartmentalization

  20. 20
    The ship's double-hull space was considered useful for routing mechanical, electrical, and
    _____
    systems.
    Hint

    This system reduces heat transfer rather than transporting air or electricity.

    Answer

    insulation

  21. 21
    From the hold to C deck, the structural double-hull space was approximately
    _____
    inches wide.
    Hint

    This was the larger dimension before the space became smaller.

    Answer

    nine

  22. 22
    Above the nine-inch section, the double-hull space became approximately
    _____
    inches wide before becoming smaller still.
    Hint

    This dimension is smaller than nine inches.

    Answer

    six

  23. 23
    The ship's conventional marine organization divides spaces using thermal and structural boundaries, vertical zones, and
    _____
    categorizations.
    Hint

    These categorizations address the danger of combustion spreading through the vessel.

    Answer

    fire risk

  24. 24
    For the building conversion, the existing bulkheads were extended through the ship to create four major
    _____
    .
    Hint

    These larger zones organized systems and programming.

    Answer

    compartments

  25. 25
    The four major compartments were planned so that each could have its own electrical and
    _____
    systems.
    Hint

    This system includes heating, cooling, and ventilation equipment.

    Answer

    mechanical

  26. 26
    Newer ships commonly use a material called
    _____
    marine board around the structure for thermal and fire protection.
    Hint

    The material name begins with a number followed by the word marine board.

    Answer

    16

  27. 27
    The marine board used on newer ships surrounds the structure to provide both thermal protection and
    _____
    protection.
    Hint

    This protects the structure during a fire.

    Answer

    fire

  28. 28
    Because the SS U.S. ship was older, the retrofit could not simply reproduce all the fireproofing methods used on
    _____
    ships.
    Hint

    The contrast is between existing older vessels and recently constructed vessels.

    Answer

    new

  29. 29
    The retrofit proposal placed insulation inside the ship's
    _____
    hull rather than sacrificing interior headroom.
    Hint

    This is the hollow two-layer space identified in the ship's structure.

    Answer

    double

  30. 30
    The proposed enclosure approach used a small
    _____
    wall system inside the double hull.
    Hint

    This wall controls moisture movement in vapor form.

    Answer

    vapor

  31. 31
    One enclosure option replaced spray foam with mineral
    _____
    while using a continuous marine-grade coating.
    Hint

    This inorganic insulation is commonly used for fire resistance.

    Answer

    wool

  32. 32
    In the baseline enclosure approach, spray foam was followed by closed-cell
    _____
    .
    Hint

    This layer reduces heat transfer and is described as closed-cell.

    Answer

    insulation

  33. 33
    The continuous marine-grade coating was proposed to serve as both fire protection and an
    _____
    barrier.
    Hint

    This barrier limits uncontrolled air leakage.

    Answer

    air

  34. 34
    The ship's curved form led the team to consider 3D scanning and prefabricated enclosure
    _____
    fitted to the hull.
    Hint

    The proposed components would be inserted or attached in a repeated series.

    Answer

    slots

  35. 35
    At the promenade and sports decks, the ship no longer followed the
    _____
    hull system.
    Hint

    These upper decks differed from the lower hull enclosure.

    Answer

    double

  36. 36
    The upper decks had to be designed as a building with a continuous, airtight
    _____
    .
    Hint

    The presentation describes the entire level below the conditioned spaces using this term.

    Answer

    floor

  37. 37
    The floor below the promenade deck was treated as its own
    _____
    to separate it from the conditioned spaces above.
    Hint

    This term refers to an enclosed three-dimensional space.

    Answer

    volume

  38. 38
    Thermal studies of the ship identified areas of heat loss and thermal
    _____
    in the metal enclosure.
    Hint

    This occurs where heat bypasses insulation through a more conductive path.

    Answer

    bridging

  39. 39
    The ship's exposed structural ribs were intentionally retained as part of the architectural
    _____
    .
    Hint

    The ribs were not hidden; they became part of the visual and enclosure strategy.

    Answer

    design

  40. 40
    The ship's enclosure laps were sealed so that the air barrier would be completely
    _____
    .
    Hint

    This describes an air barrier with minimal leakage.

    Answer

    tight

  41. 41
    The team proposed routing ERVs through the ship's existing
    _____
    posts.
    Hint

    These posts are prominent structural elements associated with the ship's history.

    Answer

    king

  42. 42
    In the proposed king-post system, one post would serve as the return and the other as the
    _____
    for ventilation air.
    Hint

    This is the path through which conditioned air is delivered.

    Answer

    supply

  43. 43
    The ventilation equipment proposed for the king posts was an energy
    _____
    ventilator.
    Hint

    This system transfers energy between exhaust and incoming air streams.

    Answer

    recovery

  44. 44
    The proposed roof design placed an air-source
    _____
    pump on the roof and vented it directly outside.
    Hint

    This equipment transfers heat between outdoor air and the building.

    Answer

    heat

  45. 45
    The project used an air-source heat pump rather than relying entirely on large centralized
    _____
    work.
    Hint

    This refers to extensive building equipment and distribution systems.

    Answer

    mechanical

  46. 46
    Most of the ship's electrical, plumbing, and other systems were planned to connect to the
    _____
    rather than operate entirely onboard.
    Hint

    This is the land-based infrastructure to which the ship would be connected.

    Answer

    mainland

  47. 47
    A
    _____
    system was proposed to serve the toilets and related plumbing needs.
    Hint

    This plumbing method uses suction to move waste.

    Answer

    vacuum

  48. 48
    For the lifeboat reuse concept, the lifeboats would retain approximately the same
    _____
    footage as the existing boats.
    Hint

    This measurement describes floor area.

    Answer

    square

  49. 49
    The reused lifeboats would be accessed from the
    _____
    deck.
    Hint

    This deck is above the main hull and is associated with passenger circulation.

    Answer

    promenade

  50. 50
    The lifeboat enclosure would use an insulated shell, an air barrier, and space for
    _____
    systems.
    Hint

    These systems distribute water and remove waste.

    Answer

    plumbing

  51. 51
    The lifeboat reuse concept would route ERVs upward through the top of each
    _____
    .
    Hint

    The reused lifeboat was treated as a small enclosed space with this name.

    Answer

    cabana

  52. 52
    The lifeboat concept preserved the structural
    _____
    of the original boat while adding a new interior experience.
    Hint

    This is the outer structural form of the boat.

    Answer

    shell

  53. 53
    The project demonstrates that resilient buildings may be created by adapting objects other than conventional
    _____
    .
    Hint

    The ship itself was the alternative object being transformed.

    Answer

    buildings

  54. 54
    The ship's reuse was considered a response to increasing
    _____
    levels.
    Hint

    These levels rise when coastal or water-related hazards become more severe.

    Answer

    flood

  55. 55
    The overall design goal was to make the reused ship highly performing while avoiding unnecessary
    _____
    of materials and systems.
    Hint

    The goal was to use resources efficiently rather than discard them.

    Answer

    waste

1 of 55
Question 1 of 55

Ask anything

We've read this whole study set, so questions about it get the best answers.

FlashcardsQuizFill in the blanksWritten testLessonNotesPodcastContent