Project Management Lecture
The Basics of Good Project Management
Project management is a practical discipline for organizing people, resources, and activities to accomplish a defined objective within limits such as time, cost, and quality. Its principles apply not only to professional project managers but also to everyday efforts such as planning an event, renovating a home, redesigning a garden, creating a course, or implementing a new technology system.
Good project management combines:
Technical practices, such as defining scope, creating schedules, identifying risks, and monitoring progress.
Interpersonal competencies, such as communication, leadership, motivation, negotiation, and conflict management.
Ethical conduct, including responsibility, respect, fairness, and honesty.
What Is a Project?
A project is a temporary effort undertaken to create a unique product, result, service, or document.
Two characteristics distinguish projects from routine work:
A definite beginning and end: A project is started intentionally and is completed when its objective has been achieved, cancelled, or otherwise closed.
A unique outcome: Even when a project resembles previous work, its circumstances and result are not exactly identical.
For example, building a house is a project even if the builder has constructed many houses before. Each house differs in its location, design, materials, customer requirements, regulations, and available resources. Similarly, a customer relationship management implementation differs from one organization to another because the organizations use different processes, tools, data, and personnel.
Examples of Projects
Projects can be very small or extremely complex:
Planning a holiday or community event
Preparing a Thanksgiving meal
Cleaning and reorganizing a garage
Redesigning a yard or garden
Adding a room to a house
Creating a new academic course
Installing a telephone system
Implementing a customer relationship management system
Constructing a large resort, casino, or mixed-use development
Reopening a business after a disaster
A project may involve:
One person or many people
One department or several departments
One organization or multiple organizations
People working in the same location or across different regions and time zones
Employees, contractors, suppliers, consultants, customers, and business partners
A project managed by one person is possible, but most projects benefit from multiple contributors with specialized knowledge and complementary skills.
What Is Project Management?
Project management is the application of knowledge, skills, tools, and techniques to project activities in order to meet project objectives and address stakeholder needs and expectations.
Project management involves determining:
Why the project is being performed
What must be accomplished
Who needs to be involved
When activities and resources are needed
How the work will be performed
How progress will be measured
How changes, problems, and risks will be handled
How the project will be completed and formally closed
Project management is not merely the creation of a schedule. A schedule is only one tool within a broader process that includes authorization, planning, execution, monitoring, communication, leadership, change management, validation, and closure.
Project Management as a Life Skill
Project management principles apply to everyday activities because many ordinary efforts have:
A starting point
A desired outcome
Tasks that must be completed
Limited time, money, or resources
People who are affected
Decisions and trade-offs
A need for completion and evaluation
A person does not need the formal title of project manager to use project management skills. Anyone organizing a complex effort can benefit from defining the purpose, identifying tasks, sequencing work, communicating expectations, monitoring progress, and learning from the result.
Projects and Operations
Organizations perform both projects and operations.
Projects
Projects are temporary and produce unique outcomes. They are created to introduce a change, develop something new, or accomplish a specific objective.
Examples include:
Designing a new course
Implementing a new information system
Constructing a building
Reopening a facility after a disaster
Operations
Operations are ongoing, repetitive activities that sustain an organization.
Examples include:
Registering students
Teaching established courses
Processing customer orders
Running a store or casino
Performing routine administrative work
Relationship Between Projects and Operations
Projects and operations share several characteristics:
Both are performed by people.
Both require planning, execution, and control.
Both operate under limited resources.
Both require coordination and decision-making.
However, their purposes differ. Operations maintain the current system, while projects create a new product, service, result, or improvement. For example, teaching an existing course is an operation, while developing a new course is a project.
The Four Broad Phases of a Project
Project work can be organized into four broad phases:
Starting
Planning
Performing
Finishing
These phases are presented as distinct categories, but in practice they often overlap. Planning continues while work is being performed, and information discovered during execution may require adjustments to the plan.
1. Starting the Project
The starting phase establishes the reason for the project, its intended outcome, its authority, and the people who need to be involved.
The central questions are:
Why is the project being undertaken?
Who requested or sponsored it?
What is expected to be achieved?
What major requirements must be satisfied?
What constraints already exist?
Who has authority to approve the project and provide resources?
Why the Project Exists
The purpose of a project is often overlooked because organizations are eager to begin the work. However, failing to understand the purpose can cause the team to pursue the wrong outcome.
Understanding the purpose helps the project manager:
Define the correct objectives
Interpret requirements accurately
Make appropriate trade-offs
Identify relevant stakeholders
Recognize which activities are essential
Determine whether the project supports organizational strategy
Evaluate whether the project has actually succeeded
Projects may be initiated for several reasons:
Strategic improvement
Financial return or business opportunity
Regulatory compliance
Customer demand
Recovery after a disaster
Operational improvement
A need to introduce a new product, service, or system
If a project is required because of a new regulation, the team should examine the regulation directly to understand what must be done and what effects compliance will have.
Preliminary Business Case
In many organizations, significant work occurs before the official project begins. A business case may explain:
The problem or opportunity
Expected benefits
Return on investment
Project objectives
Strategic alignment
Preliminary costs and schedule
Alternatives that were considered
Reasons for approving the project
The project manager should understand how the project reached the approval stage. This information may reveal:
Who strongly supported the project
Who opposed or questioned it
Which assumptions influenced the decision
Which stakeholders may later create difficulties
What commitments have already been made
The Project Charter
A project charter formally authorizes the project and gives the project manager authority to use organizational resources.
A project charter is a high-level authorization document that explains why the project exists, what it is intended to accomplish, who is responsible for it, and what authority and resources are available.
The charter should be developed very early, ideally during the first days or first week of the project. It should remain concise and focused on the most important information rather than becoming a detailed project plan.
Typical Charter Contents
A high-level charter may identify:
Project purpose
Major objectives
Broad scope
Major milestones
Target completion date
Key requirements
Major constraints
High-level risks or assumptions
Approval requirements
Acceptance criteria
Project manager
Project manager’s responsibilities
Project manager’s authority
Project sponsor
Funding source
Major stakeholders
Resources that may be used
The charter should answer the question: What will make this project successful?
For example, if a project must meet a compliance requirement, the charter should identify that requirement. If schedule is the dominant constraint, the target dates should be stated. If funding is limited, the financial constraint should be recognized from the beginning.
Approval and Acceptance
The charter should identify:
Who will approve the final result
What that person or group will evaluate
What evidence will demonstrate completion
Which deliverables require formal acceptance
Without clear approval criteria, projects may remain unofficially unfinished even when most of the work has been completed.
Project Sponsor
The project sponsor is the individual or group that supports the project at an organizational level and is usually responsible for authorizing or funding it.
The sponsor may:
Provide or approve funding
Support the project politically and organizationally
Resolve issues beyond the project manager’s authority
Confirm that the project aligns with organizational priorities
Approve the project charter and major changes
Accept the final result
The charter also helps ensure that the sponsoring organization remembers its commitment to provide funding and support.
Building the Initial Team
At the beginning, the project manager may work with only a few subject-matter experts. The project manager is not expected to know every technical detail. Specialists may provide knowledge about:
Technical solutions
Regulations
Materials
Equipment
Customer needs
Operational processes
Specialized services
Resources may include:
People
Money
Equipment
Facilities
Materials
External suppliers
Consultants
Contractors
Before committing resources, the project manager needs sufficient approval and authority to use them.
2. Planning the Project
Planning transforms a high-level idea into an organized approach for accomplishing the project.
Planning addresses:
What work must be performed
Who will perform it
When the work will occur
What resources are needed
How activities depend on one another
What assumptions and constraints apply
How requirements will be verified and accepted
How communication will occur
How changes will be managed
Planning begins almost immediately after project initiation and continues throughout the project.
Planning in Proportion to the Project
Planning should be proportional to:
Project size
Project duration
Complexity
Risk
Number of stakeholders
Number of organizations involved
Cost and resource requirements
Consequences of failure
A short, simple project does not require months of planning or several binders of documentation. A large, complex, high-risk project may require extensive analysis and formal documentation.
The goal is not to create the maximum amount of paperwork. The goal is to create the amount of planning and documentation that is useful and appropriate.
High-Level and Detailed Planning
Project planning should occur at different levels:
High-level planning identifies the major path and major outcomes.
Detailed planning explains the near-term work in greater depth.
Later work is planned as more information becomes available.
A project manager does not need to know every detail at the beginning, but must understand enough to know the general direction and major decisions.
A useful planning question is:
Where is the project going, and what major path will take it there?
Without a destination, selecting a path has little meaning.
Requirements and Specifications
Requirements describe what the customer, organization, regulator, or stakeholder expects the project to deliver. The term specification is often used in a similar way.
Requirements should be sufficiently specific and detailed to allow the team to determine whether they have been met.
Poorly defined requirements create multiple interpretations. Different stakeholders may imagine different products or results, leading to:
Rework
Disagreement
Delays
Cost increases
Failed acceptance
Conflict between the project team and customer
Facilitated Requirements Sessions
A facilitated session brings relevant people together so they can discuss and clarify requirements collectively.
The facilitator’s role is to:
Keep the discussion focused
Encourage participation
Help people understand one another
Capture the information
Resolve ambiguity
Record decisions
Ensure that participants reach a shared understanding
The facilitator does not necessarily determine the requirements. Instead, the facilitator helps the group develop and document them.
Verification and Validation
Requirements should support both verification and validation.
Verification determines whether the work was performed correctly according to the defined requirements.
Validation determines whether the completed result is acceptable to the customer or approving authority.
In practical terms:
The team checks that the work was done correctly.
The customer or authorized stakeholder confirms that the result is what was requested and can be accepted.
Prioritizing Requirements
Projects often contain more requested work than can be completed within the available time, cost, or resources. Requirements therefore need to be prioritized.
Prioritization helps determine:
Which features or deliverables are essential
Which items provide the greatest value
Which items are legally or contractually required
Which items can be postponed
Which items may be removed if constraints become severe
Work Breakdown Structure
A work breakdown structure organizes all the work required to complete the project into logical groups and smaller components.
It helps the team:
Identify the full scope of work
Avoid leaving out important tasks
Group related activities
Assign responsibility
Estimate time and resources
Create a schedule
Track completion
A work breakdown structure can be created through a collaborative activity:
Participants list all tasks they believe are necessary.
The tasks are written on cards or notes.
Similar tasks are grouped together.
The groups are organized into larger categories.
The structure is reviewed for missing or duplicated work.
The resulting groups become the basis for planning and scheduling.
This technique is useful for inexperienced teams because it makes the project visible and gives participants a physical way to organize ideas.
Work breakdown structures can be used for both professional and personal projects. They may reveal overlooked activities, such as approvals, logistics, preparation, cleanup, training, or follow-up work.
Stakeholders
A stakeholder is any person, group, or organization that:
Is affected by the project
Can affect the project
Cares about the project’s outcome
Has an interest in the decisions or results
Stakeholders are not limited to the project team or the person funding the work.
Examples of Stakeholders
Depending on the project, stakeholders may include:
Customers
Project sponsors
Team members
Managers
Employees
Neighbors
Community groups
Government agencies
Regulatory bodies
Suppliers
Contractors
Business partners
Users of the final product
People who may oppose the project
Individuals whose influence is not immediately visible
For a landscaping project, stakeholders might include neighbors, community associations, water authorities, local regulators, and people affected by noise or construction activity.
Stakeholder Analysis
The project manager should understand:
Why each stakeholder is involved
What interests the stakeholder has
How much influence the stakeholder possesses
What concerns the stakeholder may raise
How the stakeholder may affect project decisions
When the stakeholder should be involved
Which stakeholders influence one another
Stakeholders may have interdependencies. One stakeholder may oppose whatever another supports, while another may help persuade a difficult stakeholder.
Some stakeholders may be hidden or indirect. For example, lobbyists, political groups, or senior decision-makers may influence a government project without being visible in day-to-day project activities. Recognizing the existence of such stakeholders is an important first step.
Project Teams
The project team consists of the people who perform, support, guide, or contribute to the project work.
Team members may include:
Core project staff
Subject-matter experts
Contractors
Suppliers
Consultants
Business partners
Customer representatives
External service providers
Part-time specialists
Not every team member works on the project continuously. Some people participate only during specific phases or when their expertise is needed.
Core and Extended Teams
Core team: Works directly and consistently on the project.
Extended team: Participates occasionally or provides specialized assistance at particular points.
Customers may be represented by designated individuals rather than by every person who will eventually use the result.
Team Structures
Teams may be:
Full-time or part-time
Co-located or geographically distributed
Internal or externally contracted
In a single organization or across several organizations
Stable throughout the project or assembled progressively
The project manager must clarify roles, responsibilities, communication expectations, and decision-making authority.
Virtual and Global Teams
A virtual team works together primarily through communication technology rather than regular face-to-face interaction.
Virtual teams may be located:
In different offices
In different cities or states
In different countries
Across multiple time zones
On different shifts or work schedules
Advantages of Virtual Teams
Virtual teams can:
Access specialized expertise from anywhere
Reduce travel and relocation costs
Include people who are unavailable locally
Allow work to continue across time zones
Support continuous or nearly continuous work
Make training and collaboration more accessible
When teams work across time zones, one group can complete work and transfer it to another group at the end of its workday. This can create an extended work cycle, although it requires careful coordination.
Challenges of Virtual Teams
Virtual teams may experience:
Misunderstandings in written communication
Lack of emotional cues
Feelings of isolation
Difficulty recognizing conflict
Time-zone scheduling problems
Delays in responses
Dependence on technology
High technology and infrastructure costs
Different levels of technical access
Difficulty building trust
Cultural misunderstandings
Language barriers
A person who needs frequent face-to-face interaction may become disengaged or leave if placed in an isolated virtual role. Project managers need to consider individual working preferences when assigning team members.
Cultural and Language Differences
Global and geographically diverse teams may differ in:
Communication styles
Attitudes toward hierarchy
Approaches to deadlines
Expectations about participation
Conflict responses
Work practices
Technical vocabulary
First languages
A common working language may be necessary, but team members may still think and communicate more comfortably in another language. The project manager should use clear language, avoid unnecessary idioms, and confirm understanding.
Effective Virtual Communication
Effective virtual communication should be:
Clear: The intended meaning is easy to understand.
Timely: Information is delivered when it can still affect decisions.
Concise: Unnecessary detail does not obscure the main message.
Appropriate: The method and tone fit the audience and situation.
Confirmed: Recipients provide feedback to show that the message was understood.
Trust-building: Team members can rely on one another and share information openly.
Virtual teams need deliberate efforts to build trust and maintain connection because many informal signals available in face-to-face work are absent.
Constraints and Trade-Offs
Every project has constraints. Common constraints include:
Time
Cost
Scope
Quality
Resources
Risk
Regulatory requirements
Availability of people or equipment
The project manager must determine which constraints are most important and which are secondary.
Different Priorities
In some projects:
Schedule is the dominant constraint.
Cost is the dominant constraint.
Quality or compliance cannot be compromised.
Scope must be reduced to meet a deadline.
Additional resources may be added to protect the schedule.
For example, a casino opening may have a fixed public opening date. In that case, the organization may accept additional cost to ensure completion on time. In another project, funding may be fixed, requiring the team to reduce scope or extend the schedule.
Managing Trade-Offs
When constraints conflict, the project manager must decide:
What must be completed first
What can be delayed
What can be removed
Whether additional resources are justified
Whether the deadline can change
What quality level is acceptable
Who has authority to approve the trade-off
A fixed deadline does not necessarily mean that every component must be delivered on that date. The project manager may divide the work into phases and deliver the most important parts first.
Scheduling the Project
Scheduling determines:
What must be done
In what order
When each activity should occur
How long activities may take
Which resources are needed
Which activities depend on others
What delays could affect completion
A software tool can help analyze the effects of changes, but scheduling does not require specialized software. A simple list or set of notes can reveal the order in which work must occur.
Dependencies
A dependency exists when one activity relies on another activity being completed first.
For example:
The ground must be prepared.
Soil or materials must be added.
Plants or seeds can be placed.
Watering and maintenance can begin.
If the sequence is ignored, later activities may fail or require rework.
External Events and Contingencies
Weather, inspections, equipment availability, and regulatory approvals can disrupt a schedule. A strong schedule considers what may happen if:
It rains
Materials arrive late
Equipment becomes unavailable
An inspection is delayed
A key person is absent
A facility is inaccessible
A regulation changes
A major unexpected obstacle is discovered
The project manager should identify possible disruptions and determine how the project will respond.
Inspections and Approval Timing
Inspections can significantly affect schedules because:
Work must reach a suitable stage before inspection.
The inspector may not be available at the expected time.
Work may need to stop until approval is received.
Incorrect or late inspection may require rework.
Continuing work before proper inspection can create serious problems.
Inspection and approval activities must therefore be included in the schedule, not treated as informal side activities.
Critical Path
The critical path is the longest sequence of dependent activities that determines the shortest possible project duration.
Activities on the critical path have little or no scheduling flexibility. If a critical-path activity is delayed and no recovery action is taken, the entire project may be delayed.
The project manager should:
Identify the critical path
Monitor critical activities closely
Protect the resources needed for those activities
Identify possible delays early
Maintain contingency plans
Avoid unnecessary interruptions
Critical Chain
The critical chain considers both task dependencies and resource limitations.
A project may have a logical sequence of activities, but the work can still be delayed if a critical resource is unavailable. Critical resources may include:
A specialized technician
A key decision-maker
A particular piece of equipment
A required facility
A scarce supplier
A project manager or subject-matter expert
Critical-chain thinking emphasizes protecting the project from resource-related delays and using buffers or reserves.
Buffers and “Wiggle Room”
A buffer is time or capacity intentionally reserved to absorb uncertainty and variation.
Buffers can help manage:
Weather
Traffic
Rework
Late approvals
Resource conflicts
Unexpected technical problems
Delayed deliveries
A project without any flexibility may fail as soon as a minor disruption occurs. Buffers should be planned deliberately rather than added only after the project is already late.
Project Life Cycles and Approaches
Projects can use different approaches for organizing and sequencing work.
Sequential Approach
In a sequential or phase-to-phase approach, one phase is substantially completed before the next begins.
For example, a house may require:
Design and approve plans.
Prepare the site.
Build the foundation.
Construct the structure.
Install systems.
Complete finishing work.
Sequential work is appropriate when later activities depend heavily on the completion and approval of earlier work.
Overlapping Approach
In an overlapping approach, activities or phases begin before all work in the preceding phase is complete.
For example:
Construction may begin on one part of a building while plans for another part are still being finalized.
Marketing may begin while a course is still being developed.
Procurement may begin once enough design information is available, even though the entire design is not finished.
Overlapping can shorten the schedule, but it may increase the risk of rework if later information changes earlier work.
Adaptive and Agile Approaches
An adaptive approach organizes work in short cycles and adjusts plans as new information becomes available. Agile methods commonly use this approach.
Adaptive work is useful when:
Requirements are uncertain
The environment changes quickly
Customer feedback is important
The full solution cannot be defined in advance
Early delivery provides useful learning
Priorities may change during the project
Iterations
An iteration is a short, defined period during which the team completes a selected portion of the work.
During each iteration, the team:
Selects the highest-priority work.
Determines what can be completed within the available time or resources.
Performs the work.
Reviews the result.
Learns from feedback.
Reprioritizes the next set of work.
For example, a multi-session course might be developed and delivered one session at a time. Feedback from the first session can be used to modify the second session rather than waiting until the entire program is complete.
Benefits of Iterative Work
Iterative work allows the team to:
Deliver value earlier
Obtain feedback sooner
Discover what works and what does not
Change priorities
Reduce the risk of investing heavily in the wrong solution
Adapt to market or customer changes
Improve the process continuously
Retrospective Reviews
A retrospective review occurs at the end of an iteration or work period. The team asks:
What went well?
What should continue?
What did not work?
What could be improved?
What should be changed immediately in the next iteration?
The important feature of a retrospective is that improvements are applied quickly rather than being saved until the end of a long project.
Rolling-Wave Planning
Rolling-wave planning means planning near-term work in detail while representing future work at a higher level.
For example:
The current phase may be planned in detail.
The next phase may be described broadly.
A later phase may appear only as a placeholder.
As the project approaches each future phase, the project manager develops a more detailed plan.
Rolling-wave planning is useful because the team often lacks enough information to plan the distant future accurately. It avoids wasting effort on details that are likely to change.
Progressive Elaboration
Progressive elaboration means increasing the detail of project information as understanding improves.
The project manager may begin with:
A broad objective
Major phases
General deliverables
High-level estimates
Later, the project manager adds:
Detailed tasks
Specific roles
Precise resource needs
Refined estimates
Detailed acceptance criteria
More accurate risks and dependencies
Rolling-wave planning emphasizes when future work is planned, while progressive elaboration emphasizes how project information becomes increasingly detailed.
Performing and Monitoring the Work
During the performing phase, the team carries out the planned activities while comparing actual progress with intended progress.
The project manager examines:
What was planned
What has actually been completed
Whether the work is on schedule
Whether resources are available
Whether quality requirements are being met
Whether new issues have emerged
Whether changes are necessary
Whether stakeholders remain aligned
Planned Versus Actual Performance
The project manager should compare the expected result with the actual result:
Was the task completed?
Was it completed on time?
Did it use the expected resources?
Does it meet the required quality?
Did it create any effects on later tasks?
Is the project still within its constraints?
If actual progress differs from the plan, the project manager determines whether the variance is acceptable or requires action.
Variance and Tolerance
Not every deviation requires intervention. A project may include an acceptable range of variation.
The project manager should determine:
Whether the deviation is within tolerance
Whether corrective action is required
Whether the deviation is likely to grow
Whether preventative action should be taken
Whether the sponsor or stakeholders need to be informed
A small delay may be absorbed by a buffer. A delay beyond the allowable range may require schedule changes, additional resources, reduced scope, or formal approval.
Managing Change
Changes are inevitable in projects. However, change should not be introduced casually because it may affect:
Scope
Schedule
Cost
Quality
Resources
Risks
Stakeholder expectations
Other project activities
A project manager should assess the impact of a proposed change before accepting it.
Change Requests
A change request is a formal or informal proposal to alter an approved aspect of the project.
The request should be evaluated for:
The reason for the change
Benefits and disadvantages
Impact on time
Impact on cost
Impact on quality
Impact on resources
Impact on risks
Effects on other deliverables
Required approval
The project manager should avoid allowing unapproved additions to become part of the project. If a requested activity was not included in the original plan, it may constitute a change in scope.
Three Types of Corrective Change
The presentation identifies three related forms of change:
Corrective Action
A corrective action brings current performance back into alignment with the plan.
Examples include:
Reassigning an unsuitable resource
Rescheduling activities
Correcting an error
Revising an inaccurate estimate
Repairing work that was performed incorrectly
Preventative Action
A preventative action changes the approach to avoid a future problem.
Examples include:
Adding an additional review
Providing training
Adding schedule flexibility
Securing backup equipment
Changing a process before defects occur
Monitoring an emerging risk more closely
Problem or Defect Resolution
When a problem or defect already exists, the team must fix it. The solution may require:
Additional time
Additional resources
Additional funding
Rework
Replacement materials
A change to the planned approach
If defects are ignored or concealed, their eventual impact may become much larger and may damage the organization’s reputation or brand.
Proactive Project Management
A strong project manager is both preventative and proactive.
Preventative management reduces the likelihood or effect of problems.
Proactive management looks ahead, identifies warning signs, and acts before problems become emergencies.
Waiting until someone reports a major problem is not effective project management. The project manager should continuously monitor signals, ask questions, examine trends, and prepare alternatives.
Communication Management
Communication is one of the most important responsibilities in project management.
Effective communication requires attention to:
Content
Audience
Timing
Format
Level of detail
Tone
Context
Required response
Applicable regulations
Characteristics of Effective Communication
Communication should be:
Concise: The main point is easy to identify.
Clear: The recipient understands what is meant.
Timely: The information arrives while action is still possible.
Accurate: The information is correct and complete enough for its purpose.
Appropriately formatted: The method fits the message.
Audience-specific: The message is adapted to the recipient.
Proportionate: Urgency is communicated accurately.
Actionable: The recipient knows what is expected.
The wrong communication style can create confusion. Excessive warnings can also reduce credibility. If a project manager repeatedly treats minor issues as emergencies, people may stop responding when a genuine emergency occurs.
Choosing the Communication Method
Communication may be:
Written
Verbal
Electronic
Presented in a meeting
Included in a report
Documented in a contract
Delivered through a project-management system
Contracts and organizational policies may specify how certain information must be communicated.
Communication Planning
A communication plan identifies:
Who needs information
What information each person needs
Who will provide the information
How the information will be delivered
How much detail is appropriate
How often communication will occur
When information must be submitted
Who must review or approve it
How communication records will be maintained
Different audiences require different levels of detail. A team member may need task-level information, while an executive may need a concise summary of progress, risks, decisions, and required actions.
Avoiding Communication Overload
Too many messages can be as harmful as too few. If people receive excessive email, repeated meeting notices, or irrelevant updates, they may begin ignoring all project communication.
The project manager should therefore consider:
Frequency
Relevance
Timing
Audience
Message length
Required action
Communication Workflow
If a document must be approved before distribution, the project manager should plan for:
Collecting the information
Preparing the document
Reviewing it internally
Obtaining required approvals
Revising it if necessary
Distributing the final version
The plan should account for unavailable reviewers, holidays, time zones, and approval delays.
Communication Regulations
Organizations and industries may regulate:
What information can be shared
Who may release it
How it must be worded
Where it may be stored
Which records must be retained
How confidential information must be protected
When public relations or legal review is required
Project managers must understand these requirements before communicating sensitive or public information.
Completing and Closing the Project
Finishing a project requires more than stopping the work. A project should be formally completed, accepted, documented, and evaluated.
The closing phase includes:
Confirming that deliverables are complete
Obtaining formal acceptance
Recording outstanding or rejected items
Archiving project information
Evaluating team performance
Capturing lessons learned
Releasing resources
Recognizing accomplishments
Completing administrative closure
Validation and Acceptance
The project manager compares:
What the project originally promised
What was actually delivered
What has been accepted
What remains incomplete or unapproved
Unapproved deliverables should be documented and examined. The team should ask:
Why was the item rejected?
Was the requirement misunderstood?
Was the quality insufficient?
Was the stakeholder expectation different?
What should be changed in future projects?
Formal acceptance prevents uncertainty about whether the project is complete.
Administrative Closure
Administrative closure is the process of completing the documentation and organizational work required to close the project.
It may include:
Filing project records
Archiving plans and reports
Storing requirements and approvals
Recording lessons learned
Documenting unresolved issues
Closing contracts
Releasing resources
Completing financial records
Evaluating performance
Confirming final acceptance
Documentation is valuable because future teams may encounter similar projects. A well-organized archive allows them to reuse:
Templates
Checklists
Estimates
Requirements
Lessons learned
Designs
Reports
Communication records
Solutions to previous problems
Team Feedback and Evaluation
Project managers should provide feedback to the people who contributed to the project.
Feedback may address:
Quality of work
Reliability
Collaboration
Technical contribution
Communication
Initiative
Problem-solving
Areas for improvement
Positive feedback can support future assignments, career advancement, references, and professional recommendations. Even when performance was imperfect, useful feedback should identify strengths as well as areas for development.
Celebrating Success
Completion should be recognized. Celebration provides:
Positive reinforcement
Acknowledgment of effort
Team morale
A sense of accomplishment
Closure after demanding work
Celebration does not need to be expensive. Recognition, appreciation, and public acknowledgment can be meaningful even when the budget is limited.
Project Manager Competencies
Successful project management requires more than technical knowledge. A project manager needs a balance of technical, interpersonal, conceptual, and ethical competencies.
Technical Competencies
Technical competencies may include the ability to:
Define project objectives
Develop a charter
Identify scope and requirements
Build a work breakdown structure
Create and interpret schedules
Identify dependencies
Monitor cost and time
Manage risks
Analyze variances
Control changes
Track deliverables
Obtain acceptance
Close the project
A project manager does not need to personally perform every technical task, but must understand enough to coordinate the work and make sound decisions.
Leadership and Team Competencies
Project managers need to:
Build effective teams
Clarify roles
Motivate people
Encourage participation
Communicate expectations
Resolve conflict
Support collaboration
Delegate effectively
Influence without dictating
Recognize achievement
Coach and mentor team members
Managing a team differs from completing work independently. The project manager must accomplish results through other people.
Interpersonal or Soft Skills
Important interpersonal skills include:
Communication
Emotional intelligence
Facilitation
Negotiation
Conflict management
Decision-making
Trust-building
Cultural awareness
Political awareness
Coaching
Mentoring
Adaptability
Empathy
Stress management
These skills are increasingly important because projects involve diverse teams, complex organizations, virtual communication, competing priorities, and uncertainty.
Emotional Intelligence
Emotional intelligence is the ability to understand and manage one’s own emotions while recognizing and responding appropriately to the emotions of others.
In project management, emotional intelligence helps a project manager:
Recognize team morale
Detect frustration or disengagement
Understand individual motivations
Respond appropriately to conflict
Avoid unintentionally demotivating people
Build trust
Adapt communication
Provide useful support
Facilitation
Facilitation is the ability to help a group communicate, generate ideas, reach understanding, and make progress.
A facilitator:
Encourages balanced participation
Keeps discussions focused
Clarifies ambiguous statements
Captures important information
Helps participants resolve differences
Guides the group toward decisions
Facilitation is particularly important during requirements sessions, planning meetings, retrospectives, and conflict resolution.
Decision-Making
Project managers may need to choose among:
Individual decisions
Group consensus
Majority decisions
Plurality decisions
Decisions delegated to specialists
Decisions escalated to sponsors
The appropriate approach depends on the issue, the required speed, the authority available, and the consequences of the decision.
Negotiation
Negotiation involves balancing competing interests to reach an acceptable agreement.
A win-win outcome attempts to satisfy the legitimate interests of all parties rather than allowing one party to benefit only at the expense of another. Project managers negotiate over:
Scope
Schedule
Cost
Resources
Responsibilities
Priorities
Quality
Deliverables
Motivation
Motivation is not identical for every person. A reward that motivates one team member may discourage another.
Possible motivators include:
Recognition
Responsibility
Learning opportunities
Flexible work
Public appreciation
Compensation
Career opportunities
Autonomy
Meaningful work
Team belonging
The project manager should understand individual preferences and avoid assuming that a single incentive will work for everyone. Recognition for good performance, responsible behavior, and honest admission of mistakes can strengthen team culture.
Matching Team Members to Work
A team member may be enthusiastic about taking responsibility but lack the necessary experience. The project manager must balance:
Project performance
Risk
Team development
Morale
Learning opportunities
Available supervision
Possible strategies include:
Pairing the inexperienced person with an expert
Giving the person a limited responsibility
Providing coaching or mentoring
Assigning a supporting role
Allowing an experienced team member to teach
Reassigning the work when project risk is too high
When a team member must be removed from a project, the project manager should handle the decision respectfully and preserve the person’s dignity where possible. The appropriate action depends partly on the organizational structure and the project manager’s authority over staffing.
Organizational Structure and Project Authority
The project manager’s authority varies according to the organization’s structure.
In a functional organization:
Work is primarily organized by departments.
Functional managers control staff and resources.
Projects may be managed by departmental leaders.
A project manager may have limited authority.
Team members may report primarily to their functional managers.
In organizations that perform many projects:
Dedicated project managers are more likely to be employed.
Project managers may receive formal authority over teams and budgets.
Project roles may exist only for the duration of a project.
Specialized project management support may be available.
The project manager must understand:
Who controls the budget
Who assigns resources
Who approves changes
Who evaluates team members
Who resolves conflicts
Who has final decision authority
Career Development in Project Management
Project managers commonly develop through one of two broad paths:
Subject-Matter Expert to Project Manager
A person may begin in a technical or functional field such as:
Information technology
Manufacturing
Construction
Logistics
Finance
Marketing
Operations
The person may then become a team leader or coordinator and gradually develop project management skills.
Project Management Skills First
A person may also develop project management expertise first and then apply it across different industries or technical areas.
A project manager does not need to be the leading technical expert in every project. The project manager needs sufficient understanding to coordinate experts, ask effective questions, identify dependencies, and make informed decisions.
Combining Technical and People Skills
The strongest project managers combine:
Knowledge of project management practices
Understanding of the relevant business or technical context
Ability to lead and communicate with people
Technical knowledge without people skills can result in poor collaboration. Strong interpersonal skills without sufficient understanding of the work can result in unrealistic plans or weak decisions.
Growing Need for Project Managers
Organizations increasingly need project managers because:
More work is organized as projects.
Delivery time frames are shorter.
Resources and budgets are tightly constrained.
Projects involve more departments and organizations.
Technology and business processes change rapidly.
Organizations need people who can organize complex efforts.
Leaders want greater control over cost, schedule, and scope.
Dedicated coordination reduces the burden on operational managers.
Project managers may be full-time employees or temporary specialists brought in for the duration of a project.
Professional Standards and Good Practices
A project management body of knowledge provides:
Recommended practices
Common terminology
Tools and techniques
Guidance for different types of projects
Concepts for planning, execution, monitoring, and closure
It is a guide rather than a rigid rulebook. The project manager and team must determine:
Which practices apply
How much documentation is necessary
Which tools are useful
How formal the process should be
What is appropriate for the project’s size and complexity
A small personal project may need only a brief list and schedule. A major regulated project may require extensive documentation, approvals, audit trails, and formal controls.
The central principle is tailoring: applying appropriate practices at the appropriate level of detail.
Code of Ethics
Ethics guide how project managers should behave toward organizations, team members, customers, stakeholders, and the profession.
Four central ethical values are:
Responsibility
Respect
Fairness
Honesty
Responsibility
A responsible project manager:
Takes ownership of commitments
Performs agreed duties
Acknowledges mistakes
Reports problems
Protects project resources
Follows applicable rules and contracts
Takes action when issues arise
Respect
Respect involves treating others with dignity and consideration.
A respectful project manager:
Listens to others
Values diverse perspectives
Avoids humiliation
Recognizes contributions
Handles disagreement professionally
Respects cultural differences
Protects people from inappropriate behavior
Fairness
Fairness means making decisions objectively and avoiding favoritism.
A fair project manager:
Applies standards consistently
Discloses conflicts of interest
Avoids giving unfair advantages
Considers relevant information
Treats team members equitably
Makes assignments and evaluations responsibly
Honesty
Honesty requires truthful and transparent communication.
An honest project manager:
Does not lie
Does not conceal important problems
Reports accurate status
Acknowledges uncertainty
Does not falsify records
Communicates risks and defects
Honors contractual commitments
Mandatory and Aspirational Standards
Ethical standards may be:
Mandatory: Actions that must be performed or prohibited, such as avoiding fraud, lying, cheating, and undisclosed conflicts of interest.
Aspirational: Principles that professionals should strive toward, such as acting with integrity, building trust, supporting others, and improving the profession.
Ethical decision-making becomes easier when a person understands the values guiding the decision. Values provide a basis for deciding what should be done when rules alone do not fully answer the situation.
Key Takeaways
A project is temporary and creates a unique product, service, result, or document.
Project management is more than scheduling. It includes purpose, scope, stakeholders, resources, communication, leadership, change management, ethics, and closure.
The basic project sequence is why, what, who, when, and how.
Planning should be proportional to the project. The project manager should use enough detail to support success without creating unnecessary bureaucracy.
Stakeholders include anyone who can affect the project or be affected by it. Their interests, influence, concerns, and communication needs must be understood.
Projects operate under constraints. Time, cost, scope, quality, resources, and risk often compete, requiring deliberate trade-offs.
Critical-path activities affect the project finish date, while critical-chain thinking also considers resource availability.
Adaptive and iterative approaches allow teams to deliver work in short cycles, obtain feedback, and reprioritize as conditions change.
Rolling-wave planning and progressive elaboration recognize that detailed information becomes available gradually.
Proactive project managers identify warning signs early, use buffers, communicate problems, and take corrective or preventative action.
Effective communication is clear, concise, timely, audience-appropriate, and confirmed through feedback.
A project is not complete until its deliverables are accepted, records are archived, lessons are captured, resources are released, and closure is formally recognized.
The strongest project managers combine technical competence with leadership, communication, emotional intelligence, ethical judgment, and the ability to work effectively with teams.
A successful project manager guides people toward a defined outcome while adapting to uncertainty, respecting constraints, communicating responsibly, and preserving the trust of stakeholders.