Sustainable Data Centres

  • 28Unfamiliar
  • 0Learning
  • 0Familiar
  • 0Mastered
Topic: Sustainability Focus Areas
The three main areas for making data centres more ecologically sound are efficient building systems, power source, and
.

28 questions

  1. 1
    The three main areas for making data centres more ecologically sound are efficient building systems, power source, and
    _____
    .
    Hint

    This area relates to the carbon emitted during material production and construction.

    Answer

    embodied carbon

  2. 2
    The operational carbon consumption of data centres is primarily impacted by efficient building systems and the
    _____
    .
    Hint

    Think about what feeds the building systems.

    Answer

    power source

  3. 3
    Decarbonisation of the grid is not fully within the remit of the data centre provider but depends on the
    _____
    .
    Hint

    It's about the broader energy infrastructure.

    Answer

    wider grid

  4. 4
    There has been a shift from green power purchase agreements (PPAs) to clients prioritising sites close to
    _____
    generation.
    Hint

    Think about the type of energy that is clean and local.

    Answer

    renewable energy source

  5. 5
    Unlike efficient systems, reducing embodied carbon in building fabric often comes with a
    _____
    rather than a saving.
    Hint

    It's the opposite of a financial incentive.

    Answer

    cost

  6. 6
    Addressing embodied carbon early in design can help avoid
    _____
    charges later.
    Hint

    These are penalties linked to carbon emissions.

    Answer

    carbon related

  7. 7
    Embodied carbon is often measured and reported but not a requirement in the
    _____
    .
    Hint

    This document outlines the project requirements.

    Answer

    design brief

  8. 8
    Designers can effectively show clients that low-carbon technologies save money, time, and
    _____
    .
    Hint

    One of the three things saved, often associated with carbon.

    Answer

    material

  9. 9
    On a previous project, Timo's team saved
    _____
    of concrete by making slabs thinner and reducing foundation sizes.
    Hint

    The amount is in cubic meters and was quite large.

    Answer

    11,000m311,000\text{m}^311,000m3

  10. 10
    On two projects for the same client, Timo's team saved
    _____
    and 3030%30 of steel respectively.
    Hint

    One project saved a quarter of the steel.

    Answer

    25%25\%25%

  11. 11
    Building lean, offsite, and efficiently are key strategies to save
    _____
    .
    Hint

    This is the main environmental goal.

    Answer

    carbon

  12. 12
    End tenant specifications are often unduly stringent and are not
    _____
    by designers.
    Hint

    Designers could question these requirements.

    Answer

    challenged

  13. 13
    Microsoft recently made a stir with a new data centre built using
    _____
    .
    Hint

    This is an engineered wood product.

    Answer

    CLT (cross-laminated timber)

  14. 14
    A drawback of using CLT with steel is that it requires
    _____
    because the concrete-steel synergy is lost.
    Hint

    It's the opposite of saving steel.

    Answer

    more steel

  15. 15
    GGBS is a
    _____
    replacement that is now standard in data centre specifications.
    Hint

    It substitutes a key component of concrete.

    Answer

    cement

  16. 16
    Concretene is concrete impregnated with
    _____
    , allowing removal of rebar and further reduction of cement content.
    Hint

    This is a two-dimensional carbon material.

    Answer

    graphene

  17. 17
    To adopt new technologies, designers must be
    _____
    and put forward innovative models to clients.
    Hint

    It requires courage to move away from traditional methods.

    Answer

    brave

  18. 18
    The most common DfMA application in UK data centres is in services cassettes, packaged plant rooms, and
    _____
    units.
    Hint

    These are pre-assembled units bolted to the building.

    Answer

    drivetrain

  19. 19
    A perceived limitation for DfMA in building fabric is the long
    _____
    of data centre floor plates, often 8m×12m8\text{m} \times 12\text{m}8m×12m.
    Hint

    This refers to the distance between supports.

    Answer

    spans

  20. 20
    Integrating secondary systems (e.g., services) with the primary structure into one DfMA unit would reduce
    _____
    usage.
    Hint

    This is about using resources only once.

    Answer

    material

  21. 21
    Data centres lend themselves to DfMA because they consist of repetitive
    _____
    (e.g., 10m10\text{m}10m cells repeated many times).
    Hint

    These are repeated modules.

    Answer

    cells

  22. 22
    A contractor's Scope 3 emissions accounted for
    _____
    of their total works.
    Hint

    Almost all of their emissions are indirect.

    Answer

    99.4%99.4\%99.4%

  23. 23
    To save carbon, buildings should be made
    _____
    through lean construction.
    Hint

    Opposite of heavy.

    Answer

    lighter

  24. 24
    Computer modelling can challenge traditional solutions based on
    _____
    and legislation.
    Hint

    These are the rules that often dictate design.

    Answer

    regulations

  25. 25
    Liquid cooling allows moving from air cooled systems to
    _____
    liquid cooled systems in current arrangements.
    Hint

    The majority of cooling becomes liquid-based.

    Answer

    75%75\%75%

  26. 26
    Higher off-temperatures from liquid-cooled chips can assist in
    _____
    plans.
    Hint

    This involves supplying heat to nearby buildings.

    Answer

    district heating

  27. 27
    District heating from data centres is more realised in northern Europe, but in the UK it remains in the realm of
    _____
    .
    Hint

    It's not yet implemented widely.

    Answer

    ideas

  28. 28
    The UK lacks the
    _____
    needed to distribute waste heat from data centres, requiring central government involvement.
    Hint

    Physical systems like pipes are needed.

    Answer

    infrastructure

1 of 28
Question 1 of 28

Ask anything

We've read this whole study set, so questions about it get the best answers.

FlashcardsQuizFill in the blanksWritten testLessonNotesPodcastContent