Sustainable Data Centres


Sustainable Data Centres

Maria
The pace of change in data centre development is incredible, but how much room is there to make these facilities more sustainable? I've been looking into the biggest opportunities, and it seems like power usage is where the biggest wins are, but there's a lot more to it.

Corey
Absolutely. And experts are pointing to three main buckets: efficient building systems, the power source, and then embodied carbon from the building materials. The first two get a lot of attention because they save operational energy and costs, but embodied carbon is where designers and architects can really make a difference.

Maria
Right, because with efficient systems you save on energy bills, but with embodied carbon, there's often an upfront cost. So it's harder to get client buy-in. But as we heard, these decisions are critical for reaching net zero.

Corey
Exactly. And the challenge is that while embodied carbon gets measured and reported in early design stages, it often gets diluted later due to value engineering or just losing focus. The briefs rarely require hitting those targets.

Maria
So how do we overcome that? One engineer pointed out that it's about showing clients that sustainable designs can save money, time, and materials all at once. Like on a recent project, they saved 11,000 cubic metres of concrete just by making slabs thinner and reducing foundations.

Corey
That's an enormous saving. And on two projects for the same client, they cut steel use by 25% and 30% respectively. The carbon savings are massive, plus it reduces construction time and cost. That's the kind of win-win that makes clients sit up and listen.

Maria
Of course, one way to cut embodied carbon is using new materials. Cross-laminated timber, or CLT, is getting a lot of buzz. Microsoft recently built a CLT data centre in the US. But there are trade-offs—CLT often requires more steel because you lose the composite action you get with concrete.

Corey
Interesting. So the carbon equation still works in favour of CLT overall, but there's room to optimise. Maybe designing structural systems that use steel and timber together in a smarter way could reduce both. No one's really doing that yet.

Maria
And then there are innovations in concrete itself. GGBS is now standard for many data centres—it's a cement replacement that cuts carbon. And there's concretene, which adds graphene to concrete, letting you remove the rebar and reduce cement even further. But these come with risks and need client buy-in.

Corey
It really comes down to designers being brave and putting forward new solutions. As one architect put it, the industry tends to default to what they know—what insurers approve, what's been done before. But we have to push for alternatives, especially when tenants' requirements are unnecessarily stringent.

Maria
Absolutely. And speaking of new approaches, what about design for manufacture and assembly—DfMA? It's already used in other sectors but is less common in UK data centres. One big opportunity is pre-assembled services cassettes and packaged plant rooms, which save time and reduce site labour.

Corey
But DfMA hasn't really been applied to the building structure itself. Data centres usually require large clear spans—like 8 by 12 metres—which is too big for a single offsite component. But if you could bring in modular pieces that are assembled on site and then erected, that could work.

Maria
And there's a bigger idea: integrating the primary structure with the secondary systems. Right now, you build a floor plate and then hang a separate frame for services. That's redundant. A combined DfMA unit would do the job once, saving material and maybe even netting a carbon benefit.

Corey
And with more remote sites in the UK, there's a labour shortage. Offsite fabrication reduces the need for workers on site, cuts waste, and improves quality control. Since data centres are often repetitive cells, it's a perfect application for DfMA—but it requires early planning and template designs.

Maria
Stephen mentioned that liquid cooling is another frontier. With high-density racks, you can move from air cooling to 75% liquid cooling, which eliminates fan energy. And here's the bonus: chips are running at higher temperatures, so the waste heat is warmer and more useful for district heating.

Corey
That's key, because district heating from data centres has huge potential but is still mostly an idea in the UK. Northern Europe is ahead, but we lack the infrastructure. You need a heat consumer nearby, or a government push. Maybe the new AI Growth Zones will force co-location.

Maria
And then there's Scope 3 emissions. As a contractor pointed out, 99.4% of their carbon footprint came from Scope 3—upstream supply chain. That becomes the client's downstream Scope 3. If we can reduce embodied carbon at the front end, we save huge amounts of offsetting later.

Corey
It all ties together. Using modern computer modelling to design lighter buildings, challenging traditional codes and tenant specs, pushing for new materials and DfMA—these are the ways forward. The consensus from the experts is that we need to be brave and educate clients on the long-term value.

Maria
This conversation has shown that while there are real challenges around programme, cost, and regulation, the opportunities for sustainability in data centre design are enormous. It's going to take a collaborative push from designers, engineers, clients, and even government to make it happen.

Corey
And the UK's data centre sector is already vibrant. With the right focus on embodied carbon, DfMA, and embracing new technologies, it can become a leader in sustainable digital infrastructure. That's something worth listening to.

Ask anything