Taum Sauk Dam Failure

Transcript

Early in the morning of December 14, 2005, pumps  were nearly finished filling the upper reservoir   at the Taum Sauk power station, marking the  end of the daily cycle. Water rose to the top   of the rockfill embankment, reaching the concrete  parapet wall that ran along the top of the dam.   But the water didn’t stop. One of the two pumps  shut off, but the other kept running, and soon,   the water was lapping over the wall. Within  minutes, those splashes turned into a steady stream cascading over the parapet, pouring against  the embankment on the other side. The rockfill   eroded slowly at first, but the hole grew deeper  and wider. The pump finally shut off, but it   was too late—the footing of the parapet wall had  already been undermined. The wall tipped over, and   a massive surge of water was unleashed down the  mountainside headed directly toward a state park. This award-winning pumped storage facility,  considered a model of modern engineering,

immediately became the center of intense scrutiny.  And what the investigations found would change   a lot about the field of dam safety. I’m  Grady, and this is Practical Engineering. When it was built in the 1960s, the Taum Sauk  pumped storage plant was unlike really any other   power plant in the world, at least in terms of  size. South of St. Louis in the Ozark Mountains,   it was designed to meet a very specific need. I’ve  talked about pumped storage on the channel before,   and Taum Sauk was one of the largest facilities  of its time. Built by Union Electric,   which eventually merged with Ameren, the  whole plant is basically a battery. It’s

actually a net consumer of electricity,  which is normally not a good thing for a   power plant. But managing the power grid isn’t  only about how much electricity you can produce,   but also when you can produce it. Large  coal plants in the Missouri area could   make lots of power, but they couldn’t ramp  that production up and down to accommodate   fluctuating demands throughout the day. So,  Union Electric proposed a clever solution, one that’s pretty common today, but was innovative  for its time. Two reservoirs were constructed:   one low on the east fork of the Black River  and another near the top of Proffitt Mountain,   Missouri’s sixth-highest peak. Between them, a  hydroelectric plant with two reversible turbines. When electrical demands are low, rather than  reducing the output of thermal power plants,   that energy can go toward pumping water from the  lower to the upper reservoir, usually overnight.

Then when demand spikes during the day, all  that stored potential energy created from   cheap electricity can be harvested and put back  on the grid by reversing the system to generate   hydropower. Of course, you don’t get all the  power out that you put in. Some of that water   evaporates or leaks out, and there are losses of  energy in the pumping and generation. But, with an   overall efficiency of around 70%, it was more than  enough to justify the enormous cost of building and operating two reservoirs and a power plant  that doesn’t produce any of its own electricity. The most striking part of the whole facility is  the upper reservoir. It’s just such an unusual   sight: a circular dam, sometimes called  a ring dike or ring levee, perched on top   of a mountain. This is not usually an efficient  way to build a dam. We typically construct them   across valleys so that the natural topography  can form the sides and back of the reservoir.

With a so-called “off-channel reservoir” you have  to build the dam all the way around, increasing   the costs and the engineering complexity. But  there are no valleys at the tops of mountains,   and that height is an essential part of a  pumped storage facility. The power available   from falling water is really simple to calculate:  multiply gravitational acceleration, the density   of the fluid, the volumetric flow rate, and the  difference in height, called head. We can really only change two of these. So for a specific power  output needed for a specific duration, you can   trade height for flow. The greater the difference  in height between the two reservoirs in a pumped   storage facility, the less water you need to move,  which reduces the size of all the infrastructure,   and thus saves costs. The mountains in southeast  Missouri provided a perfect location for the   project, creating about 750 feet or 230 meters  of height between the upper and lower reservoirs.

Actually the whole facility is named after  the highest mountain in Missouri, Taum Sauk,   which was the original site for the upper  reservoir until there was too much pushback   about building a project there, so they moved  it to a slightly lower peak nearby. And they   encountered some challenging conditions during  construction, forcing the engineers to realign   the dam to avoid an area of weak geology, giving  it that unique kidney bean shape. The original dam was built as a rockfill embankment - basically  just dumping a long pile of rocks around the   perimeter of the reservoir. Rockfill usually works  well as an embankment if you have a good source   of material nearby. It’s really strong, doesn’t  require a lot of compaction, and it doesn’t settle   much over time like soil fills do. One thing  rockfill doesn’t do well is hold back water.   Too many spaces between the rocks. So concrete  panels were installed all along the inside of

the reservoir to make the embankment water-tight.  A tunnel connected a morning glory inlet through   the mountain to the generating plant. The inlet  was set into a basin 20 feet or 6 meters below the   bottom of the reservoir to suppress the potential  for a vortex to form as it was drained each day.   The whole project was designed to be operated  remotely with no on-site technicians required,   another innovation for the time, but one of  the many decisions that would prove disastrous. For most of its life, the Taum Sauk station  operated on average around 100 days per year,   usually during the hot summer months when  electricity demands were more variable between   night and day. Deregulation of electric power  markets in the 1990s opened up the possibility   of selling power to other utilities.  Those 100 days per year went up to 300,   meaning the upper reservoir cycled up and down,  often twice per day, nearly every day of the year.

And that was starting to cause some problems. The  upper reservoir had dealt with leaks essentially   since it started operating in the 1960s. Several  projects were implemented throughout its life to   deal with the issue, but the increased cycles  of filling and draining were only making things   worse. At one point, small ponds were built  beside the reservoir to capture some of the   leakage and pump it back inside. In the fall  of 2004, Ameren decided to bring out the big guns and spent more than two million dollars  to install a geomembrane liner to cover the   entire reservoir. That essentially fixed the  problem, but it caused a few new ones too. About a year later, in September 2005, the  Institute of Electrical and Electronics   Engineers, or “I-triple-E” declared  the plant an “Engineering Milestone”   for its innovations in the world of electrical  infrastructure. On the day before the ceremony,

some of the participants took a tour of the  upper reservoir and witnessed water pouring   over the parapet wall on one side of the  dam. The operators quickly switched from   pumping mode to generation to get the water  back down. They chalked up the issue to high   winds from a remnant tropical storm that  caused the overtopping, but just to be safe,   they hired a dive inspection team to check on the  level sensors. And what they saw was concerning. When that geomembrane liner was installed in  the reservoir, there was a valid concern that   any penetrations might cause leaks in the future.  But the reservoir needed level sensors installed   for the control system to be operated remotely.  So, instead of mounting those sensors directly   to the concrete through the liner along their  length, the engineers tried something different.   Two cables were run between anchors at the  top and bottom of the embankment slope. The

conduits for the sensors were attached to those  cables, minimizing the number of penetrations   needed. Unfortunately, the mounting system was  underdesigned. Those conduits were buoyant,   and also subject to strong currents as  the reservoir filled and emptied each   day. Sometime after the spring of 2004,  they had become dislodged and deflected,   so the sensors inside were providing readings  that were lower than the actual water level. Based on those findings, the operators  decided to reprogram the control system   to subtract two feet from the upper set point  on the pumps. The original design called for   two feet or 600 millimeters of freeboard  between the top of the wall and the maximum   water surface. They figured that doubling that  distance would be enough to avoid issues until   permanent repairs could be made during  the annual maintenance period when the

reservoir was drained. Unfortunately,  they would never get the chance. Less than three months after that first time  someone observed the reservoir overflowing,   on December 14, it happened again, this time  in the early dawn when no one was around to notice. Once the parapet wall collapsed, the  water quickly eroded down through the dam,   emptying roughly 6 billion liters or 200 million  cubic feet of water down the steep mountainside   straight toward Johnson’s Shut-Ins State Park,  stripping away trees and rocks as it surged.   By pure luck, the failure happened in the winter  when the park was practically empty, but the park   superintendent, his wife, and three kids (one of  whom was only seven months old) were swept away

when the water demolished their house. Incredibly,  the entire family survived the event, but not   without suffering from injuries and hypothermia.  The wave of water flowed into the lower reservoir,   where it would have gone anyway later that  day, so there were no major downstream impacts. The event was investigated by the  Federal Energy Regulatory Commission,   and the conclusions were surprising. Like most  events of this kind, a series of small oversights, which on their own wouldn’t have resulted in a  disaster, combined to cause hundreds of millions   of dollars in damage, plus the effects on the  family I mentioned. First was the embankment.   That rockfill it was supposed to be built from  wasn’t quite as rocky as the engineers who   designed it intended. There was a lot more soil  mixed into the fill, resulting in more settlement   of the embankment over time. Unsound areas of  soil in the embankment’s foundation were also

not properly cleaned out, making the settlement  even worse. From construction to failure,   some parts of the parapet wall were a full  two feet or 600 millimeters lower than where   they started. That settlement wasn’t taken into  consideration when the level sensors were replaced   after the lining project in 2004. And with the  sensors unattached and free to move around, there   was no way for the logic controllers to know the  actual elevation of the water in the reservoir. Failsafe probes were installed on the parapet wall  to provide a backup that would automatically shut   off the pumps if the level got too high, but they  were installed in a location that was actually   higher than the top of settled parts of the  embankment wall. If the water hit those sensors,   it was already overtopping parts of the wall.  And they were incorrectly programmed in a way   that required both sensors to be activated before  the pumps shut off. That first site visit when

water was running over the wall didn’t trigger  those failsafe sensors, but no one thought to   check them. And rather than ground truth the  important elevations like the top of wall and   all sensor levels, they just decided to add a  couple feet of margin and postpone a permanent   fix. It would have been so easy to have someone  on-site during those last few minutes of   filling the reservoir each day to verify the  levels against the electronic measurements, or even a closed circuit camera, especially  after the enormous red flag of seeing it   happen a few months earlier, but no one knew it  was overtopping. And the owner hadn’t notified   the regulator the first time it happened, so  there was no oversight for how Ameren responded. Probably the most significant error of  all happened well before the facility   was ever built. The design had no spillway. As  an off-channel reservoir, there were only two

ways water could get in: rain falling on top or  water being pumped in. With enough freeboard for   a rainstorm and the redundancies built into the  control system, the designers never envisioned a   need for a way to let water safely run over the  top. Unfortunately, when you rely on complicated   systems for safety, the likelihood for things to  go wrong goes way up. These types of events are   sometimes called “normal accidents,” a term  coined by Charles Perrow. The idea is that, when systems are complicated, and especially  when the safety measures themselves add to   a project’s complexity, failures are much  more likely, even expected. In other words,   failure becomes normal. Compared to an industrial  control system, a spillway is dead simple. Once   the water gets to the crest, it just goes out.  They’re not failproof - I’ve talked about several   spillway failures in previous videos - but there  are a lot fewer ways that things can go wrong.

FERC fined the owner 15 million dollars for  the failure, the largest penalty they’ve   ever issued. Five million of that went into a  fund to improve the area around the project,   although some recent reporting has alleged  that those funds have been mismanaged. The   State of Missouri also sued, and agreed  to a 177 million dollar settlement, much   of which went toward restorations at the state  park, which held a reopening ceremony in 2010. At the same time as Johnson’s Shut-Ins State  Park was undergoing renovation, crews were   working on rebuilding the upper reservoir at  Taum Sauk. To avoid a relicensing process,   the dam was built on the same alignment and to  the same size as the original project. Rather   than trying to repair the flawed rockfill  embankment, Ameren and their consultants   went with an innovative design. The new dam  was built using roller-compacted concrete,

a dry concrete mix that’s handled using  earth-moving equipment and compacted into   place using rollers. The new design would  address both the settlement and leakage   issues the original structure struggled with while  still taking advantage of the material from the   original embankment. That rock fill was crushed  and processed into aggregate for the concrete,   reducing the amount of material hauled into  the remote site. Maybe most importantly, they included a spillway this time. The structure  is the largest roller-compacted concrete dam   in the United States. The plant reopened in  2010, was rededicated as an IEEE milestone,   and the project won the US Society on Dams’  award of Excellence in the Constructed Project. The failure at Taum Sauk was a wake-up call for  the professional community. The regulator, FERC,   implemented some big changes to its oversight of  dam safety in the wake of the collapse. They put

together a task force that issued a technical  guidance document specifically addressing the   challenges of pumped storage facilities  that was circulated to the owners. They   also updated rules for owners, requiring them  to have an internal dam safety program and a   Chief Dam Safety Engineer who is responsible  for overseeing it, a role Ameren didn’t have   at the time. The event triggered states as  far as Hawaii to bolster their dam safety programs. And most importantly, the failure  demonstrated the need for overflow spillways,   even for off-channel reservoirs with redundant  control systems meant to avoid overfilling. If you’re paying attention to issues related to  the electrical grid, you know the importance of   storage. Particularly as intermittent sources  of power become a large part of our portfolio,   ways to balance out those mismatches in  supply and demand are only becoming more

important. Pumped storage has traditionally been  the only large-scale way to do this economically,   but obviously, it comes with a tradeoff. Dams  are among the riskiest structures that humans   build. They don’t fail very often, but when  they do, those failures usually come with   serious consequences to people, property,  and the environment. And because they don’t   fail that often, those lessons come slowly and  tragically. But, with battery storage becoming cheaper and much more widespread, it will be  interesting to see how the economics of pumped   storage change. By 2030, some are predicting  the US will have more than 400 gigawatt hours   of battery storage on the grid; that’s more than  100 Taum Sauks. We’re right at the beginning of   some major changes in how energy is stored. Those  batteries have a lot of technical differences in   how they interact with the grid, and they come  with their own environmental challenges and

safety considerations, but the risk profile is a  lot different than building a major reservoir at   the top of a mountain. As energy infrastructure  keeps evolving, those differences in risks are   probably going to shape the future of  how we store power, and at what cost. A big lesson from Taum Sauk that we learn over and  over again is the destructive power of water. It’s   something I care a lot about - it’s defined my  education and my career, and so I pay a lot of attention to the news about floods and disasters.  For example, major flooding recently hit parts of   Central Europe. There’s no such thing as a purely  natural disaster when it comes to flooding,   and I’m always trying to understand how  infrastructure is helping or hurting,   like the dam that failed in Poland. There’s always  a push to control the narrative after a disaster,   and by focusing on different details of the  story - the casualties, preventive measures,

and response - different outlets  can subtly, or not-so-subtly,   change how you interpret the facts. That’s why  I like to use Ground News, today’s sponsor. Ground News aggregates major news stories  and adds context to make reading the news   easier and more effective. This one update  on the flooding was covered by 230 outlets;   you can see how just reading a single one might  not give you a comprehensive viewpoint. Every story comes with quick visual breakdowns and tags  for political bias, factuality, and ownership of   the sources backed by ratings from independent  news monitoring organizations. For this story,   you can see that 43 percent of the reporting  outlets lean left, 40 percent are center,   and only 17 percent lean right. 50 percent are  media conglomerates 73 percent of the outlets   have been rated “High Factuality.” They  also have a feature called the Blind Spot

that shows you stories mainly covered  by one side of the political spectrum:   stuff you might totally miss if you only  follow a few main sources for your news. Maybe more than anything else, disasters shape  the field of engineering. They’re how we learn   to do better in the future, so it’s important  to me to get a broad perspective on issues   like what happened in central Europe. In that  way, journalism has a lot of power over us, and Ground News hands some of that power back  to you. If you’d like a more transparent media   landscape, they’re offering a huge discount  right now at the link in the description:   40 percent off the Vantage subscription,  which includes unlimited access to all   their features. That’s ground dot news  slash practicalengineering or just click   the link in the description. Thank you for  watching, and let me know what you think!

Ask anything

We've read this whole study set, so questions about it get the best answers.

FlashcardsQuizFill in the blanksWritten testLessonNotesPodcastContent