Taum Sauk Dam Failure
- 48Unfamiliar
- 0Learning
- 0Familiar
- 0Mastered
48 questions
- 1The Taum Sauk power station experienced a failure on December 14, 2005, when water overtopped the concrete_____wall of the upper reservoir.
Hint
This architectural element runs along the top of a dam or wall.
Answer
parapet
- 2The rockfill embankment at Taum Sauk eroded as water cascaded over the parapet, leading to the undermining of the parapet wall's_____.
Hint
This term refers to the foundation or base upon which a structure rests.
Answer
footing
- 3The Taum Sauk power station, a pumped storage facility, was built by Union Electric, which later merged with_____.
Hint
This utility company was responsible for the plant's operation at the time of the failure.
Answer
Ameren
- 4The Taum Sauk plant is essentially a large_____designed to manage the power grid by storing energy.
Hint
Think about its function: it stores and releases electrical energy.
Answer
battery
- 5Unlike traditional power plants, Taum Sauk is a net_____of electricity, demonstrating its role in grid management rather than primary power generation.
Hint
This means it uses more power than it produces, but for a specific purpose.
Answer
consumer
- 6The Taum Sauk pumped storage plant uses two reservoirs: one low on the East Fork of the Black River and another near the top of_____Mountain.
Hint
This is the specific mountain peak where the upper reservoir was constructed.
Answer
Proffitt
- 7Between the two reservoirs at Taum Sauk, a hydroelectric plant housed two_____turbines.
Hint
These turbines can operate in both pumping and generating modes.
Answer
reversible
- 8When electrical demands are low, energy is used to pump water from the lower to the upper reservoir, storing_____energy.
Hint
This type of energy is associated with an object's position or height.
Answer
potential
- 9The Taum Sauk facility had an overall energy efficiency of around_____%, indicating that some power is lost during the pumping and generation cycle.
Hint
Consider the percentage of energy recovered compared to what was put in.
Answer
70
- 10The upper reservoir at Taum Sauk is sometimes called a ring dike or_____levee due to its circular shape atop a mountain.
Hint
This term emphasizes its enclosed, circular form, unlike dams built across valleys.
Answer
ring
- 11The design of the upper reservoir at Taum Sauk is known as an “off-channel reservoir” because it is not built_____a valley.
Hint
This contrasts with typical dam construction that utilizes natural topography.
Answer
across
- 12The power available from falling water is calculated by multiplying gravitational acceleration, fluid density, volumetric flow rate, and the difference in height, known as_____.
Hint
This specific term refers to the vertical distance in fluid mechanics.
Answer
head
- 13The greater the difference in_____between the two reservoirs, the less water needs to be moved for a specific power output, reducing infrastructure costs.
Hint
This is the 'head' mentioned in hydroelectric calculations.
Answer
height
- 14The original site for the Taum Sauk upper reservoir was on Missouri's highest mountain, also named Taum Sauk, but it was moved due to_____.
Hint
This indicates opposition or resistance to the construction.
Answer
pushback
- 15During construction, engineers had to realign the Taum Sauk dam to avoid an area of weak geology, which resulted in its unique_____shape.
Hint
This describes the irregular, non-circular outline of the dam.
Answer
kidney bean
- 16The original Taum Sauk dam was built as a_____embankment, primarily consisting of a pile of rocks.
Hint
This term describes an embankment made predominantly of rocks.
Answer
rockfill
- 17To make the rockfill embankment watertight,_____panels were installed along the inside of the Taum Sauk reservoir.
Hint
This material was used to seal the interior of the reservoir.
Answer
concrete
- 18A morning glory inlet at Taum Sauk was set into a basin 20 feet below the reservoir bottom to suppress the potential for a_____to form as it drained.
Hint
Think of a swirling phenomenon in draining water.
Answer
vortex
- 19One of the decisions that proved disastrous for Taum Sauk was that the project was designed to be operated_____with no on-site technicians.
Hint
This implies control from a distance without human presence at the site.
Answer
remotely
- 20After deregulation in the 1990s, the Taum Sauk reservoir began cycling up and down significantly more often, sometimes_____per day.
Hint
This number refers to the increased frequency of filling and draining.
Answer
twice
- 21In the fall of 2004, Ameren installed a_____liner to cover the entire reservoir to address long-standing leakage issues.
Hint
This specific type of synthetic liner is used for waterproofing.
Answer
geomembrane
- 22In September 2005, the Institute of Electrical and Electronics Engineers (IEEE) declared the Taum Sauk plant an “Engineering_____.”
Hint
This term signifies a significant achievement or breakthrough.
Answer
Milestone
- 23During a tour before the IEEE ceremony, participants witnessed water pouring over the parapet wall, which operators initially attributed to_____from a remnant tropical storm.
Hint
This weather phenomenon was initially blamed for the water overtopping.
Answer
high winds
- 24The mounting system for the Taum Sauk reservoir's level sensors was underdesigned, and the buoyant_____became dislodged and deflected.
Hint
These are the tubes or channels that housed the sensors.
Answer
conduits
- 25The dislodged level sensors at Taum Sauk provided readings that were_____than the actual water level, leading to overfilling.
Hint
This meant the operators thought there was less water than there actually was.
Answer
lower
- 26Based on inaccurate sensor findings, operators reprogrammed the control system to subtract two feet from the upper set point on the pumps, attempting to increase_____.
Hint
This term refers to the distance between the water surface and the top of the containment.
Answer
freeboard
- 27The collapse of the Taum Sauk parapet wall unleashed roughly 6 billion liters of water towards Johnson’s Shut-Ins_____Park.
Hint
This specific type of recreational area was directly in the path of the flood.
Answer
State
- 28By pure luck, the Taum Sauk dam failure happened in the_____when Johnson's Shut-Ins State Park was practically empty.
Hint
This specific season contributed to fewer casualties.
Answer
winter
- 29The Taum Sauk event was investigated by the Federal Energy Regulatory Commission, also known as_____.
Hint
This is the common acronym for the regulatory body.
Answer
FERC
- 30One oversight found was that the Taum Sauk rockfill embankment contained too much_____mixed into the fill, leading to more settlement.
Hint
This material is finer than rock and can cause greater compaction issues.
Answer
soil
- 31From construction to failure, some parts of the Taum Sauk parapet wall had settled by a full_____feet.
Hint
This specific number indicates the vertical distance of settlement.
Answer
two
- 32Failsafe probes installed on the Taum Sauk parapet wall were meant to shut off pumps automatically but were installed higher than settled parts of the_____.
Hint
This refers to the main structure of the dam that the probes were meant to protect.
Answer
embankment wall
- 33The failsafe sensors at Taum Sauk were incorrectly programmed to require_____sensors to be activated before the pumps shut off.
Hint
This number refers to how many sensors needed to trigger simultaneously.
Answer
both
- 34Probably the most significant error in the original Taum Sauk design was the absence of a_____to safely release excess water.
Hint
This is a common safety feature in dams for managing high water levels.
Answer
spillway
- 35The Taum Sauk failure is an example of a “normal accident,” a term coined by_____Perrow, where complicated systems make failures more likely.
Hint
This is the first name of the sociologist who developed the theory.
Answer
Charles
- 36FERC fined the owner of Taum Sauk_____million dollars for the failure, their largest penalty ever issued.
Hint
This specific monetary value was the regulatory fine.
Answer
15
- 37The State of Missouri sued the owner and agreed to a_____million dollar settlement, much of which went toward restorations at the state park.
Hint
This is the total amount of the settlement paid by the owner to the state.
Answer
177
- 38To rebuild the upper reservoir and avoid a relicensing process, the new Taum Sauk dam was built on the same alignment and to the same_____as the original project.
Hint
This refers to its physical dimensions.
Answer
size
- 39The new Taum Sauk dam was built using_____-compacted concrete, an innovative design addressing settlement and leakage issues.
Hint
This type of concrete mix is placed and compacted using specific machinery.
Answer
roller
- 40The rockfill from the original Taum Sauk embankment was_____and processed into aggregate for the new concrete dam.
Hint
This process made the old material usable in the new construction.
Answer
crushed
- 41Most importantly, the rebuilt Taum Sauk dam included a_____this time, a crucial safety feature missing from the original design.
Hint
This passive structure is designed to safely release excess water.
Answer
spillway
- 42The rebuilt Taum Sauk structure is the largest roller-compacted concrete dam in the_____.
Hint
This geographical region denotes its significant scale.
Answer
United States
- 43After the Taum Sauk collapse, FERC implemented major changes, including requiring dam owners to have an internal dam safety program and a Chief Dam Safety_____.
Hint
This professional role is responsible for overseeing dam safety.
Answer
Engineer
- 44The Taum Sauk failure demonstrated the critical need for overflow_____even for off-channel reservoirs with redundant control systems.
Hint
This safety feature allows for the controlled release of water when levels are too high.
Answer
spillways
- 45As intermittent sources of power become more prevalent,_____is becoming increasingly important for balancing supply and demand on the electrical grid.
Hint
This general concept refers to holding energy for later use.
Answer
storage
- 46Pumped storage has traditionally been the only large-scale way to economically store energy, but_____storage is becoming cheaper and more widespread.
Hint
This alternative technology is rapidly evolving and gaining prominence for energy storage.
Answer
battery
- 47By 2030, predictions suggest the US will have more than 400 gigawatt hours of battery storage on the grid, equivalent to over 100 Taum_____.
Hint
This refers to multiple Taum Sauk-sized storage capacities.
Answer
Sauks
- 48Dams are among the riskiest structures humans build, and when they fail, it usually comes with serious consequences to people, property, and the_____.
Hint
This refers to the natural surroundings and ecological systems.
Answer
environment