Topic: Taum Sauk Failure Event
The Taum Sauk power station experienced a failure on December 14, 2005, when water overtopped the concrete
wall of the upper reservoir.

48 questions

  1. 1
    The Taum Sauk power station experienced a failure on December 14, 2005, when water overtopped the concrete
    _____
    wall of the upper reservoir.
    Hint

    This architectural element runs along the top of a dam or wall.

    Answer

    parapet

  2. 2
    The rockfill embankment at Taum Sauk eroded as water cascaded over the parapet, leading to the undermining of the parapet wall's
    _____
    .
    Hint

    This term refers to the foundation or base upon which a structure rests.

    Answer

    footing

  3. 3
    The Taum Sauk power station, a pumped storage facility, was built by Union Electric, which later merged with
    _____
    .
    Hint

    This utility company was responsible for the plant's operation at the time of the failure.

    Answer

    Ameren

  4. 4
    The Taum Sauk plant is essentially a large
    _____
    designed to manage the power grid by storing energy.
    Hint

    Think about its function: it stores and releases electrical energy.

    Answer

    battery

  5. 5
    Unlike traditional power plants, Taum Sauk is a net
    _____
    of electricity, demonstrating its role in grid management rather than primary power generation.
    Hint

    This means it uses more power than it produces, but for a specific purpose.

    Answer

    consumer

  6. 6
    The Taum Sauk pumped storage plant uses two reservoirs: one low on the East Fork of the Black River and another near the top of
    _____
    Mountain.
    Hint

    This is the specific mountain peak where the upper reservoir was constructed.

    Answer

    Proffitt

  7. 7
    Between the two reservoirs at Taum Sauk, a hydroelectric plant housed two
    _____
    turbines.
    Hint

    These turbines can operate in both pumping and generating modes.

    Answer

    reversible

  8. 8
    When electrical demands are low, energy is used to pump water from the lower to the upper reservoir, storing
    _____
    energy.
    Hint

    This type of energy is associated with an object's position or height.

    Answer

    potential

  9. 9
    The Taum Sauk facility had an overall energy efficiency of around
    _____
    %, indicating that some power is lost during the pumping and generation cycle.
    Hint

    Consider the percentage of energy recovered compared to what was put in.

    Answer

    70

  10. 10
    The upper reservoir at Taum Sauk is sometimes called a ring dike or
    _____
    levee due to its circular shape atop a mountain.
    Hint

    This term emphasizes its enclosed, circular form, unlike dams built across valleys.

    Answer

    ring

  11. 11
    The design of the upper reservoir at Taum Sauk is known as an “off-channel reservoir” because it is not built
    _____
    a valley.
    Hint

    This contrasts with typical dam construction that utilizes natural topography.

    Answer

    across

  12. 12
    The power available from falling water is calculated by multiplying gravitational acceleration, fluid density, volumetric flow rate, and the difference in height, known as
    _____
    .
    Hint

    This specific term refers to the vertical distance in fluid mechanics.

    Answer

    head

  13. 13
    The greater the difference in
    _____
    between the two reservoirs, the less water needs to be moved for a specific power output, reducing infrastructure costs.
    Hint

    This is the 'head' mentioned in hydroelectric calculations.

    Answer

    height

  14. 14
    The original site for the Taum Sauk upper reservoir was on Missouri's highest mountain, also named Taum Sauk, but it was moved due to
    _____
    .
    Hint

    This indicates opposition or resistance to the construction.

    Answer

    pushback

  15. 15
    During construction, engineers had to realign the Taum Sauk dam to avoid an area of weak geology, which resulted in its unique
    _____
    shape.
    Hint

    This describes the irregular, non-circular outline of the dam.

    Answer

    kidney bean

  16. 16
    The original Taum Sauk dam was built as a
    _____
    embankment, primarily consisting of a pile of rocks.
    Hint

    This term describes an embankment made predominantly of rocks.

    Answer

    rockfill

  17. 17
    To make the rockfill embankment watertight,
    _____
    panels were installed along the inside of the Taum Sauk reservoir.
    Hint

    This material was used to seal the interior of the reservoir.

    Answer

    concrete

  18. 18
    A morning glory inlet at Taum Sauk was set into a basin 20 feet below the reservoir bottom to suppress the potential for a
    _____
    to form as it drained.
    Hint

    Think of a swirling phenomenon in draining water.

    Answer

    vortex

  19. 19
    One of the decisions that proved disastrous for Taum Sauk was that the project was designed to be operated
    _____
    with no on-site technicians.
    Hint

    This implies control from a distance without human presence at the site.

    Answer

    remotely

  20. 20
    After deregulation in the 1990s, the Taum Sauk reservoir began cycling up and down significantly more often, sometimes
    _____
    per day.
    Hint

    This number refers to the increased frequency of filling and draining.

    Answer

    twice

  21. 21
    In the fall of 2004, Ameren installed a
    _____
    liner to cover the entire reservoir to address long-standing leakage issues.
    Hint

    This specific type of synthetic liner is used for waterproofing.

    Answer

    geomembrane

  22. 22
    In September 2005, the Institute of Electrical and Electronics Engineers (IEEE) declared the Taum Sauk plant an “Engineering
    _____
    .”
    Hint

    This term signifies a significant achievement or breakthrough.

    Answer

    Milestone

  23. 23
    During a tour before the IEEE ceremony, participants witnessed water pouring over the parapet wall, which operators initially attributed to
    _____
    from a remnant tropical storm.
    Hint

    This weather phenomenon was initially blamed for the water overtopping.

    Answer

    high winds

  24. 24
    The mounting system for the Taum Sauk reservoir's level sensors was underdesigned, and the buoyant
    _____
    became dislodged and deflected.
    Hint

    These are the tubes or channels that housed the sensors.

    Answer

    conduits

  25. 25
    The dislodged level sensors at Taum Sauk provided readings that were
    _____
    than the actual water level, leading to overfilling.
    Hint

    This meant the operators thought there was less water than there actually was.

    Answer

    lower

  26. 26
    Based on inaccurate sensor findings, operators reprogrammed the control system to subtract two feet from the upper set point on the pumps, attempting to increase
    _____
    .
    Hint

    This term refers to the distance between the water surface and the top of the containment.

    Answer

    freeboard

  27. 27
    The collapse of the Taum Sauk parapet wall unleashed roughly 6 billion liters of water towards Johnson’s Shut-Ins
    _____
    Park.
    Hint

    This specific type of recreational area was directly in the path of the flood.

    Answer

    State

  28. 28
    By pure luck, the Taum Sauk dam failure happened in the
    _____
    when Johnson's Shut-Ins State Park was practically empty.
    Hint

    This specific season contributed to fewer casualties.

    Answer

    winter

  29. 29
    The Taum Sauk event was investigated by the Federal Energy Regulatory Commission, also known as
    _____
    .
    Hint

    This is the common acronym for the regulatory body.

    Answer

    FERC

  30. 30
    One oversight found was that the Taum Sauk rockfill embankment contained too much
    _____
    mixed into the fill, leading to more settlement.
    Hint

    This material is finer than rock and can cause greater compaction issues.

    Answer

    soil

  31. 31
    From construction to failure, some parts of the Taum Sauk parapet wall had settled by a full
    _____
    feet.
    Hint

    This specific number indicates the vertical distance of settlement.

    Answer

    two

  32. 32
    Failsafe probes installed on the Taum Sauk parapet wall were meant to shut off pumps automatically but were installed higher than settled parts of the
    _____
    .
    Hint

    This refers to the main structure of the dam that the probes were meant to protect.

    Answer

    embankment wall

  33. 33
    The failsafe sensors at Taum Sauk were incorrectly programmed to require
    _____
    sensors to be activated before the pumps shut off.
    Hint

    This number refers to how many sensors needed to trigger simultaneously.

    Answer

    both

  34. 34
    Probably the most significant error in the original Taum Sauk design was the absence of a
    _____
    to safely release excess water.
    Hint

    This is a common safety feature in dams for managing high water levels.

    Answer

    spillway

  35. 35
    The Taum Sauk failure is an example of a “normal accident,” a term coined by
    _____
    Perrow, where complicated systems make failures more likely.
    Hint

    This is the first name of the sociologist who developed the theory.

    Answer

    Charles

  36. 36
    FERC fined the owner of Taum Sauk
    _____
    million dollars for the failure, their largest penalty ever issued.
    Hint

    This specific monetary value was the regulatory fine.

    Answer

    15

  37. 37
    The State of Missouri sued the owner and agreed to a
    _____
    million dollar settlement, much of which went toward restorations at the state park.
    Hint

    This is the total amount of the settlement paid by the owner to the state.

    Answer

    177

  38. 38
    To rebuild the upper reservoir and avoid a relicensing process, the new Taum Sauk dam was built on the same alignment and to the same
    _____
    as the original project.
    Hint

    This refers to its physical dimensions.

    Answer

    size

  39. 39
    The new Taum Sauk dam was built using
    _____
    -compacted concrete, an innovative design addressing settlement and leakage issues.
    Hint

    This type of concrete mix is placed and compacted using specific machinery.

    Answer

    roller

  40. 40
    The rockfill from the original Taum Sauk embankment was
    _____
    and processed into aggregate for the new concrete dam.
    Hint

    This process made the old material usable in the new construction.

    Answer

    crushed

  41. 41
    Most importantly, the rebuilt Taum Sauk dam included a
    _____
    this time, a crucial safety feature missing from the original design.
    Hint

    This passive structure is designed to safely release excess water.

    Answer

    spillway

  42. 42
    The rebuilt Taum Sauk structure is the largest roller-compacted concrete dam in the
    _____
    .
    Hint

    This geographical region denotes its significant scale.

    Answer

    United States

  43. 43
    After the Taum Sauk collapse, FERC implemented major changes, including requiring dam owners to have an internal dam safety program and a Chief Dam Safety
    _____
    .
    Hint

    This professional role is responsible for overseeing dam safety.

    Answer

    Engineer

  44. 44
    The Taum Sauk failure demonstrated the critical need for overflow
    _____
    even for off-channel reservoirs with redundant control systems.
    Hint

    This safety feature allows for the controlled release of water when levels are too high.

    Answer

    spillways

  45. 45
    As intermittent sources of power become more prevalent,
    _____
    is becoming increasingly important for balancing supply and demand on the electrical grid.
    Hint

    This general concept refers to holding energy for later use.

    Answer

    storage

  46. 46
    Pumped storage has traditionally been the only large-scale way to economically store energy, but
    _____
    storage is becoming cheaper and more widespread.
    Hint

    This alternative technology is rapidly evolving and gaining prominence for energy storage.

    Answer

    battery

  47. 47
    By 2030, predictions suggest the US will have more than 400 gigawatt hours of battery storage on the grid, equivalent to over 100 Taum
    _____
    .
    Hint

    This refers to multiple Taum Sauk-sized storage capacities.

    Answer

    Sauks

  48. 48
    Dams are among the riskiest structures humans build, and when they fail, it usually comes with serious consequences to people, property, and the
    _____
    .
    Hint

    This refers to the natural surroundings and ecological systems.

    Answer

    environment