Agile Project Management with Kanban

Kanban for Managing Work

Core idea

Kanban is a visual method for managing work as it moves through a workflow. A board shows what work exists, what stage each item has reached, and where work is blocked. The method emphasizes completing work in small batches, maintaining quality at each stage, and limiting how much work is active at once.

Unlike approaches organized around fixed sprints or milestones, Kanban supports a continuous flow: work can be completed and delivered whenever it is ready. The board is adaptable to the team’s actual process, and its steps, names, and rules can change as the process evolves.

Kanban is a tool for managing work, not a rigid set of rules. Small, quick tasks may be handled without adding them to the board; the board is most useful for substantial project work that needs to be tracked across multiple stages.


Designing a Kanban board

Backlog and workflow steps

A basic board begins with a backlog, a prioritized list of work that has not yet started. Items may represent features, tasks, questions, bugs, or other deliverables. The backlog can be understood as a list of work to do, similar to a feature list in a traditional process.

The backlog is followed by workflow steps. A simple example is:

  1. Breakdown: Clarify a large item and divide it into manageable pieces.

  2. Implementation: Do the work required to produce the item.

  3. Validation: Check that the result meets the intended need.

A team can rename these steps, add or remove steps, or adapt them to its own process. For example, a breakdown step may be called specification if it includes a small amount of defining requirements. The goal is not to prescribe a universal workflow, but to represent how work actually gets completed.

Work-in-progress and done columns

Each workflow step is divided into two parts:

  • Active: Work currently being performed at that step.

  • Done: Work that has completed that step and is ready to move onward.

This distinction makes it possible to see not only what is being worked on, but also what has finished a stage and is waiting to proceed. It also creates a place to define the conditions that must be met before an item can move forward.

A board with steps divided into active and done columns is more than a way to visualize work: it can support project management by making progress, waiting work, and process constraints visible.

Breaking down work

Backlog items often differ substantially in size. Some may take only a few days, while others may take months. Large items should be divided into smaller pieces that can move through the workflow more consistently.

In software development, a practical target is often tasks estimated to take roughly one to three days each. The exact target depends on the work, but more uniform task sizes make progress easier to track and completion rates more useful for forecasting.

When a large backlog item is divided into smaller items, the original item can remain on the board beneath its child items as a parent or bundle. The child items then move through the workflow individually.


Defining when work is done

Each workflow step needs done rules: explicit criteria describing what must be true before an item is considered complete at that step. Without clear criteria, work may appear to progress even though important checks have been skipped.

Done rules depend on the kind of work. For software development, implementation criteria might include code review, unit tests, a successful build, and other required checks. A validation step might require confirmation that the result satisfies the customer or requester.

In a question-and-answer example, the rules might be:

  • Breakdown: Each question is small enough to answer quickly.

  • Answering: The question has been repeated accurately and answered.

  • Validation: The questioner is satisfied that the answer addressed the question.

The purpose is to ensure that an item is genuinely complete, not merely moved to the next column. Done rules can provide a degree of quality assurance throughout the workflow.


Work-in-progress limits

A work-in-progress limit, or WIP limit, is a maximum number of items allowed in a workflow step. The limit applies to the total items in that step’s active and done columns.

For example, if a step has a WIP limit of 222, no more than two items may occupy that step, whether they are still being worked on or have finished the step and are waiting to move on.

WIP limits are important because they restrict the amount of work being started at once. Without limits, teams can accumulate large piles of partially completed work, including work that may later prove unnecessary or incorrect. Limits help expose bottlenecks and encourage the team to complete or unblock existing work before starting more.

Setting initial WIP limits

Initial limits can be estimated from the team’s capacity:

  1. Identify the workflow step that usually takes the longest, often implementation.

  2. Set that step’s initial limit based on the number of people able to perform the work.

  3. Add a modest buffer for variation, such as people being temporarily blocked or needing to switch tasks.

  4. Set limits for the other steps to support a pace similar to the longest step.

  5. Adjust limits over time if the workflow repeatedly becomes overloaded or blocked.

For example, if five developers can perform the implementation step, the initial limit might be based on those five people plus a buffer. For one person, a limit of two items is one possible starting point. These are starting estimates, not fixed rules.

The other steps should not create work much faster than the implementation step can absorb it. If breakdown produces too many items, they may wait unnecessarily; if validation cannot keep up, completed implementation work may pile up. Limits can be adjusted as the team learns how the flow behaves.


Prioritizing the backlog

The backlog is ordered according to the team’s and organization’s shared understanding of priorities. New work can be added and placed into the existing order as it arrives. This is sometimes described as inserting each new item into the ordered list rather than waiting for a formal planning cycle.

Prioritization can be revisited during a daily stand-up or another appropriate discussion. The team may consider:

  • Customer needs

  • Business importance

  • Commitments to executives or partner teams

  • Dependencies on other work

  • Changes in circumstances or expectations

Major changes may justify a broader reordering discussion. The essential practice is to make the priority order visible and revisit it when relevant information changes. A Kanban board can also support discussions about due dates: stakeholders can see the work already in progress and help determine where a new request belongs relative to it.


Estimation and forecasting

Kanban-based forecasting uses two estimates:

  1. Throughput: How quickly the team completes work.

  2. Task count: How many similarly sized tasks remain.

Measuring throughput

Throughput is the number of completed tasks during a chosen period. To calculate it:

  1. Choose a period, such as two weeks or a month.

  2. Count how many tasks reached the end of the workflow during that period.

  3. Divide the number of completed tasks by the period’s length.

For example, if a team completes 202020 tasks in 101010 working days, its throughput is 222 tasks per working day.

Because tasks have been broken down to roughly similar sizes, the completion rate can be used as a rough guide to future work. The observed rate also reflects practical factors such as team size, time away, interruptions, bugs, and other work that affects delivery.

Estimating the number of tasks

Instead of estimating the total number of hours or assigning abstract points, the team estimates how many small tasks an item will require. This can be intuitive when the team has a shared understanding of what a typical task involves. Teams can use methods such as Planning Poker if they find them helpful; Kanban does not require a particular estimation technique.

For multiple features, the team estimates the task count for each and adds the counts to obtain the total work remaining.

Converting task count into a time estimate

A simple forecast is:

Estimated duration=Estimated tasks remainingTasks completed per unit of time\text{Estimated duration} = \frac{\text{Estimated tasks remaining}}{\text{Tasks completed per unit of time}}Estimated duration=Tasks completed per unit of timeEstimated tasks remaining​

The result can then be compared with a target delivery date. If the forecast is later than the required date, stakeholders can discuss changes such as reducing scope, changing priorities, adding capacity well in advance, or adjusting expectations.

Task sizes will not be identical, so forecasts are not exact guarantees. Breaking work down into reasonably similar pieces reduces variation, and fluctuations can partly average out over many tasks. Forecasts are also optional: if a team has become sufficiently predictable and stakeholders mainly need to know the work’s priority order, it may not need to produce detailed estimates for every item.


Handling bugs and unexpected task size

A bug found during validation can be handled according to its size:

  • Small fix: If it takes only a few minutes, the team can fix it directly without creating a separate board item.

  • Substantial fix: If it requires meaningful investigation, design, or implementation, the team creates a new item, prioritizes it with the rest of the work, and moves it through the same workflow.

Breaking work down reduces differences in task size, but it cannot eliminate surprises. A task may turn out to be much larger than expected. When this happens, the board makes the resulting slowdown visible. The team can investigate why the item is stuck, divide the work further if possible, or bring additional people in to help.


Managing dependencies

A dependency can block a high-priority item when another team’s work is unavailable or does not function as expected. A team may add a track column for such work.

A tracked item has an owner responsible for driving it toward resolution. Depending on the situation, the team might:

  • Work around the dependency.

  • Add the missing work to its own backlog and complete it.

  • Change the feature or its expectations.

  • Lower the item’s priority if its value or timing has changed.

Tracked items should be discussed regularly, particularly at stand-ups. The track column makes the issue visible and gives someone responsibility for resolving it. In the described approach, tracked items do not count against the ordinary WIP limit, so they do not automatically stop all other work. If resolving the dependency requires the team to take on additional work, that work then moves through the normal workflow.

Once the dependency is resolved, the item returns to the appropriate workflow step. If it remains the highest-priority item, it should be the next work taken forward.


Continuous delivery and releases

In a continuous-flow system, tasks finish throughout the development process rather than all arriving at one milestone. Each stage has quality criteria, so work that reaches the end of the workflow is ready for its next destination.

Some work can be released as soon as it is ready. Other work belongs to a coordinated release containing several related items or contributions from multiple teams. In that case, the team waits until the required items are complete before releasing them.

A team may keep finished work in a separate “ready for release” area while waiting for the wider release to be assembled. This distinguishes completed development from the act of releasing a coordinated set of work.


Roles, ownership, and collaboration

Kanban does not require a prescribed set of roles. Teams can define responsibilities in ways that fit their work, and responsibilities may be shared.

Common practical responsibilities include:

  • Facilitating the stand-up: One person helps keep the discussion focused and ensures that blockers are addressed.

  • Synchronizing status information: A team member may transfer updates from the physical board into a larger work-item tracking system.

  • Working through workflow stages: Some disciplines may focus more heavily on particular stages, such as developers on implementation or testers on validation.

A product-owner-like responsibility may also exist without being a fixed Kanban role. A program manager or partner representative may guide a feature when they represent the requesting group. For infrastructure work, technical debt, or ideas originating within the team, a team member may perform that function. The responsibility depends on the item.


Assigning work and avoiding bottlenecks

When a workflow step has room under its WIP limit, the next item is generally drawn from the backlog in priority order. The available team member takes it, and the team may record that person’s initials on the item.

Some tasks require specialized knowledge. One option is to wait until the expert becomes available, but excessive dependence on a single person creates a single point of failure. If that person is unavailable, the work may stop.

An alternative is to assign the task to an available team member and have the more experienced person provide guidance, design reviews, or code reviews. This supports knowledge sharing and reduces dependence on one individual.

For longer projects, continuity often occurs naturally: a person may continue taking the next item from a related group of tasks as it becomes available. However, the team should remain flexible. A project should not be held up unnecessarily just to preserve one person’s exclusive ownership.


Swarming and blocked work

Swarming means having multiple team members focus together on a blocked or unusually difficult item. WIP limits help reveal when this is needed. If work stops moving in one step while other team members have no useful work to pull forward, the blockage becomes visible on the board.

The team can then:

  1. Discuss why the work is stuck.

  2. Bring available people together to help.

  3. Divide the task further, investigate the problem, or coordinate with another team.

  4. Return to normal flow once the blockage is resolved.

Without WIP limits, a team might continue creating more work even though it cannot complete the items already in progress. Swarming instead directs attention to the constraint that is preventing delivery.


Open-ended work and research

Kanban can be used for research and other work whose final scope is not fully known. The team begins by breaking down what it can, starts work, and adds newly discovered tasks to the backlog as they emerge.

Some projects are too complex to break down into implementation tasks immediately. In such cases, the team can treat the initial work as a design or analysis effort:

  1. Break down the research and design work.

  2. Investigate relevant questions and consult the necessary people.

  3. Develop and review an architecture or design.

  4. Use the resulting design to break the larger project into implementation tasks.

The workflow remains useful even when the first deliverable is a design rather than working software.


Team size and workflow scale

Kanban can be used by teams of different sizes. Large teams may require a larger board and a deliberate focus in meetings, while small teams often find coordination straightforward. Multidisciplinary teams can use one board to show work passing among different areas of expertise.

A team can have as many workflow steps as it needs. Since the board is adaptable, its structure can be changed when the existing steps no longer represent how work is actually done.

Large organizations

Large-scale work requires coordination beyond a single team board. A broader planning process can combine:

  • Organization-wide product scenarios and strategic goals

  • Market research and input from design, business development, sales, and marketing

  • Team-generated technical opportunities and technical-debt work

  • Decisions about which groups will focus on which work

After higher-level scope is established, individual teams prioritize their own backlogs and coordinate dependencies with other teams. A cross-team planning board can show teams in separate rows and approximate timing across columns. The purpose is to make sequencing and conflicts visible; precise task-level estimates are not always needed at this stage.

Large-scale plans should be revisited periodically because priorities and dependencies change. Individual teams continue to adjust their backlog order as new work and information arrive.


Meetings and communication

Kanban does not prescribe a large set of meetings. A team may hold a daily stand-up, but the format is flexible. Its most useful focus is often on blockers and issues visible on the board, rather than repeating status information that the board already shows.

Stand-ups may be very brief or include additional team conversation. Other meetings can be added when useful, such as a periodic discussion about major reprioritization. Kanban does not require that all communication or every small task be represented on the board; the board is intended to help manage substantial work.


Adapting from other methods

Kanban can be introduced gradually into a team already using another development approach.

From waterfall

A team can begin by putting its existing work on a board and continuing to use its familiar stages, such as specification, implementation, and testing. The key change is to move a smaller batch of work through the process at a time and to make work limits and progress visible.

From Scrum

A Scrum team can begin by using a Kanban board and adding WIP limits while retaining familiar practices such as sprint planning, reviews, retrospectives, and demonstrations. The team can later remove practices that no longer seem useful. The transition need not require abandoning every existing practice immediately.


Key principles

Kanban makes work, workflow, and blockages visible so that teams can control how much they start, complete work reliably, and improve the flow over time.

  • Represent the actual workflow on a board.

  • Define what “done” means at each step.

  • Limit work in progress to prevent overload and expose bottlenecks.

  • Prioritize work visibly and revisit the order when circumstances change.

  • Break large items into manageable tasks.

  • Use observed completion rates and task counts when forecasting is needed.

  • Address dependencies and blockages explicitly.

  • Adapt the board and practices to the needs of the team rather than treating them as fixed rules.