What does the backlog represent on a Kanban board?

74 questions

  1. 1

    What does the backlog represent on a Kanban board?

    1. A

      A list of tasks assigned to each team member

    2. B

      A record of work that has already been validated

    3. C

      A schedule of meetings required for the project

    4. D

      A prioritized list of work that has not yet been started

    Correct answer
    D

    A prioritized list of work that has not yet been started

    Explanation

    The backlog holds work items to be done, generally ordered by priority. It can serve a role similar to a feature list or Scrum backlog.

  2. 2

    In the example Kanban workflow, what is the purpose of the breakdown step?

    1. A

      To assign each work item to a specific developer

    2. B

      To decide which completed items should be released

    3. C

      To verify that completed work satisfies the customer

    4. D

      To divide large work items into smaller, manageable pieces

    Correct answer
    D

    To divide large work items into smaller, manageable pieces

    Explanation

    The breakdown step turns items of different sizes into smaller tasks that can move through the workflow more consistently.

  3. 3

    Which sequence best matches the example board's work stages after the backlog?

    1. A

      Plan, sprint, demonstrate, then archive

    2. B

      Estimate, assign, release, then review

    3. C

      Design, prioritize, schedule, then deploy

    4. D

      Break down, implement or answer, then validate

    Correct answer
    D

    Break down, implement or answer, then validate

    Explanation

    The example uses breakdown, an implementation or answer step, and validation. The names can be adapted to a team's work.

  4. 4

    Why is each Kanban step divided into active and done columns?

    1. A

      To separate work assigned to senior staff from work assigned to junior staff

    2. B

      To distinguish tasks that are urgent from tasks that are optional

    3. C

      To show whether work in a step is underway or has met that step's completion criteria

    4. D

      To record which items belong to the current release and the next release

    Correct answer
    C

    To show whether work in a step is underway or has met that step's completion criteria

    Explanation

    The two columns show work being performed in a step and work completed in that step. This makes completion criteria visible.

  5. 5

    What are done rules intended to specify?

    1. A

      The conditions that must be met before work can leave a step

    2. B

      The priority order in which new work enters the backlog

    3. C

      The number of people assigned to each project

    4. D

      The date on which a group of features will be released

    Correct answer
    A

    The conditions that must be met before work can leave a step

    Explanation

    Done rules state what it means for a task to be complete at a particular step, helping prevent incomplete work from moving forward.

  6. 6

    Which is an example of a possible done rule for an implementation step?

    1. A

      The code has been reviewed and the required tests have been run

    2. B

      The item has been placed above all other backlog items

    3. C

      The customer has agreed on a release date

    4. D

      The team has estimated how many tasks the feature contains

    Correct answer
    A

    The code has been reviewed and the required tests have been run

    Explanation

    Code review and testing are examples of checks that can define when implementation is done. Rules should reflect the team's actual quality requirements.

  7. 7

    In the example of answering questions, what condition indicates that validation is complete?

    1. A

      The person who asked the question is satisfied with the answer

    2. B

      The speaker has repeated the question aloud

    3. C

      The answer has been moved to the top of the backlog

    4. D

      The answer has been estimated to take less than two minutes

    Correct answer
    A

    The person who asked the question is satisfied with the answer

    Explanation

    The example's validation rule is that the questioner is satisfied, ensuring the response addresses the need rather than merely the responder's interpretation.

  8. 8

    Why should a team break work of different sizes into smaller pieces?

    1. A

      Breaking work down ensures all features can be released on the same date

    2. B

      Smaller, more similar tasks are easier to move through the workflow and measure

    3. C

      Breaking work down eliminates the need to validate completed tasks

    4. D

      Smaller tasks make prioritization unnecessary

    Correct answer
    B

    Smaller, more similar tasks are easier to move through the workflow and measure

    Explanation

    The breakdown step reduces variation in task size, which helps work flow and makes completion rates more useful for planning.

  9. 9

    Which statement best describes how Kanban steps should be named and arranged?

    1. A

      A team can choose names and add or change steps to fit its work

    2. B

      Teams may change step names but must never change the number of steps

    3. C

      Steps must match a fixed sequence prescribed by Kanban

    4. D

      Every team must use exactly three steps after the backlog

    Correct answer
    A

    A team can choose names and add or change steps to fit its work

    Explanation

    The example board is illustrative: teams can name steps as appropriate and use as many steps as their workflow requires.

  10. 10

    What does the speaker present as the central element of this Kanban approach?

    1. A

      A spreadsheet containing estimates for every possible task

    2. B

      A role-based organizational chart for the project

    3. C

      The Kanban board, which makes the work and its progress visible

    4. D

      A fixed calendar of planning and review meetings

    Correct answer
    C

    The Kanban board, which makes the work and its progress visible

    Explanation

    The speaker describes the board as the center of the approach, with the work tracked through its steps rather than requiring a separate set of process artifacts.

  11. 11

    What does a work-in-progress limit restrict?

    1. A

      The number of features allowed in the backlog

    2. B

      The number of releases allowed in a calendar year

    3. C

      The number of people allowed to attend a stand-up

    4. D

      The number of work items allowed in a particular step

    Correct answer
    D

    The number of work items allowed in a particular step

    Explanation

    A WIP limit is a number associated with a step that caps how many items may be in that step at once.

  12. 12

    When counting items against a step's WIP limit, which items are included?

    1. A

      Only items that have passed validation

    2. B

      Only items that have not yet started

    3. C

      Only items that are blocked by another team

    4. D

      Items both being worked on and completed within that step

    Correct answer
    D

    Items both being worked on and completed within that step

    Explanation

    The limit applies to the total items in the step, including those in its active and done columns.

  13. 13

    How does a WIP limit help a team manage work rather than merely visualize it?

    1. A

      It replaces the need to agree on completion criteria

    2. B

      It constrains how much work can accumulate in each step

    3. C

      It guarantees that every task will meet its original estimate

    4. D

      It automatically assigns each task to the most qualified person

    Correct answer
    B

    It constrains how much work can accumulate in each step

    Explanation

    WIP limits actively constrain the amount of work in the workflow, helping the team notice and address imbalances rather than only seeing them.

  14. 14

    According to the suggested initial approach, how can a team set a WIP limit for its longest step?

    1. A

      Start with the number of people able to do that step and add a modest buffer

    2. B

      Set it to one item for every task expected in the next release

    3. C

      Use the number of meetings held by the team each week

    4. D

      Set it equal to the total number of items in the backlog

    Correct answer
    A

    Start with the number of people able to do that step and add a modest buffer

    Explanation

    The suggested starting point is the number of people who can perform the longest step, plus some buffer for variation or temporary blocks.

  15. 15

    In the example calculation, what buffer is suggested as a possible addition to the longest-step WIP limit?

    1. A

      About 50 percent of the number of people doing that work

    2. B

      Exactly one additional item for every team member

    3. C

      The number of tasks completed in the previous month

    4. D

      The full number of people in the entire organization

    Correct answer
    A

    About 50 percent of the number of people doing that work

    Explanation

    The speaker suggests adding roughly 50 percent as a buffer, while noting that the limit can be adjusted over time.

  16. 16

    After setting the WIP limit for the longest step, how should a team think about limits for other steps?

    1. A

      Remove them because only the longest step affects flow

    2. B

      Set them to support a pace compatible with the longest step

    3. C

      Make each one substantially larger so work never waits

    4. D

      Set them all to the same number regardless of the workflow

    Correct answer
    B

    Set them to support a pace compatible with the longest step

    Explanation

    Other steps should be limited so they can keep pace with the main constrained step, preventing excessive buildup before or after it.

  17. 17

    Why is it undesirable to let breakdown or specification work pile up far ahead of implementation?

    1. A

      Some of the prepared work may later prove unnecessary or need to be redone

    2. B

      Work items cannot be prioritized once they have been broken down

    3. C

      The backlog must contain only tasks that have already been implemented

    4. D

      A large set of specifications makes validation impossible

    Correct answer
    A

    Some of the prepared work may later prove unnecessary or need to be redone

    Explanation

    If too much work is prepared in advance, later learning may show that some of it was wrong or unnecessary, wasting effort.

  18. 18

    What can a team learn when items remain stuck in one step and its WIP limit prevents more work entering?

    1. A

      The WIP limit should always be ignored when anyone is idle

    2. B

      The team should keep creating more work in the preceding step

    3. C

      The workflow may have a bottleneck or another problem needing attention

    4. D

      The backlog has necessarily been prioritized incorrectly

    Correct answer
    C

    The workflow may have a bottleneck or another problem needing attention

    Explanation

    WIP limits make stalled flow visible. The team can investigate why work is stuck and respond instead of continuing to pile up more work.

  19. 19

    How should WIP limits be treated after their initial values are chosen?

    1. A

      They should be recalculated only when a new employee joins

    2. B

      They should be removed as soon as the team has measured throughput

    3. C

      They must remain unchanged for the life of the project

    4. D

      They can be adjusted if experience shows that they are not working well

    Correct answer
    D

    They can be adjusted if experience shows that they are not working well

    Explanation

    Initial limits are starting points; teams can adjust them over time based on how the workflow performs.

  20. 20

    What is the role of a personal Kanban board in the speaker's example?

    1. A

      It records only work that takes less than an hour

    2. B

      It requires the individual to follow the same number of steps as a large team

    3. C

      It provides a simple way for an individual to track backlog, doing, and done

    4. D

      It replaces all team boards and project coordination

    Correct answer
    C

    It provides a simple way for an individual to track backlog, doing, and done

    Explanation

    The speaker describes personal Kanban as a simple board with backlog, doing, and done columns.

  21. 21

    Who generally determines the order of work in the backlog in the example?

    1. A

      A single Kanban administrator following a fixed formula

    2. B

      The developer who most recently completed a task

    3. C

      The person assigned to validate each item

    4. D

      The team, using its shared understanding of priorities

    Correct answer
    D

    The team, using its shared understanding of priorities

    Explanation

    The team orders the work together based on its shared sense of priorities, often discussing the ordering at a daily stand-up.

  22. 22

    What does the speaker mean by inserting new work into the backlog as it arrives?

    1. A

      New items are started immediately without considering existing priorities

    2. B

      New items automatically replace the oldest backlog items

    3. C

      New items are held until the entire backlog is empty

    4. D

      New items are placed into the existing priority order rather than waiting for a sprint-planning event

    Correct answer
    D

    New items are placed into the existing priority order rather than waiting for a sprint-planning event

    Explanation

    The backlog is updated as new requests arrive, with each item inserted where it belongs in the current priority order.

  23. 23

    When might a team need to reorder the whole backlog rather than simply insert one new item?

    1. A

      Whenever a task moves from active to done

    2. B

      When circumstances or priorities have changed enough to require reconsidering the full order

    3. C

      Only when the team changes its board layout

    4. D

      At the beginning of every hour

    Correct answer
    B

    When circumstances or priorities have changed enough to require reconsidering the full order

    Explanation

    A full resort is useful when something significant changes. The team discusses the work and reorders it based on current needs and expectations.

  24. 24

    Which considerations does the speaker suggest using when discussing priorities?

    1. A

      Which tasks have the most detailed written descriptions

    2. B

      The order in which developers joined the team

    3. C

      The number of columns on the Kanban board

    4. D

      Customer needs and expectations from executives and partners

    Correct answer
    D

    Customer needs and expectations from executives and partners

    Explanation

    The team can discuss customer needs along with expectations from executives, partners, and other stakeholders when ordering the work.

  25. 25

    How does showing stakeholders the board help with competing requests?

    1. A

      It allows stakeholders to bypass the team's ordering process

    2. B

      It makes existing commitments and priority trade-offs visible for discussion

    3. C

      It removes the need to explain what the existing work involves

    4. D

      It guarantees that every request can be completed by its requested date

    Correct answer
    B

    It makes existing commitments and priority trade-offs visible for discussion

    Explanation

    A visible board lets stakeholders see current work and discuss where a new request fits relative to existing priorities.

  26. 26

    How does the speaker describe routine reprioritization in the example teams?

    1. A

      A manager freezes the order for the duration of each sprint

    2. B

      Each developer independently chooses a new order each morning

    3. C

      A committee meets once a year to change any priority

    4. D

      The team reviews and adjusts the order regularly, often as part of daily work

    Correct answer
    D

    The team reviews and adjusts the order regularly, often as part of daily work

    Explanation

    The team can review the backlog during daily stand-ups and make routine insertions, while larger changes may prompt a fuller reorder.

  27. 27

    How does the speaker suggest treating an urgent date request when higher-priority work is already underway?

    1. A

      Pause all other work until the requester provides an estimate

    2. B

      Discuss where the request belongs in the priority order and explain the resulting timing

    3. C

      Move it to the top automatically because it has a date

    4. D

      Reject it because Kanban does not allow due dates

    Correct answer
    B

    Discuss where the request belongs in the priority order and explain the resulting timing

    Explanation

    The speaker emphasizes making priority trade-offs visible. If the request is placed behind other work, its timing follows from that order and the team's flow.

  28. 28

    How are priorities connected to due dates in the speaker's approach?

    1. A

      The team selects dates only after all work is completed

    2. B

      The team uses priority order to decide what it works on, then estimates timing when needed

    3. C

      A due date always overrides every other priority on the board

    4. D

      Due dates are not considered under any circumstances

    Correct answer
    B

    The team uses priority order to decide what it works on, then estimates timing when needed

    Explanation

    The speaker's teams focus primarily on the order of work; estimates can be provided when needed to discuss whether a requested date is feasible.

  29. 29

    How can a team measure its completion rate using a Kanban board?

    1. A

      Measure how long the daily stand-up takes

    2. B

      Count how many items reach done during a chosen time period

    3. C

      Divide the number of developers by the number of board steps

    4. D

      Count how many items are in the backlog at the start of the project

    Correct answer
    B

    Count how many items reach done during a chosen time period

    Explanation

    The described method counts items that make it all the way through to done during a selected interval, such as two weeks or a month.

  30. 30

    What does dividing completed items by the length of the measurement period provide?

    1. A

      The number of people needed to validate each item

    2. B

      The exact duration of every future task

    3. C

      The percentage of backlog items that are defects

    4. D

      An average completion rate, such as items completed per day

    Correct answer
    D

    An average completion rate, such as items completed per day

    Explanation

    Counting completed items over a time period and dividing by that period gives a rate, such as completed tasks per day.

  31. 31

    Why does the speaker recommend breaking work into similarly sized tasks before using throughput for estimates?

    1. A

      Throughput can be measured only when every task takes exactly the same number of hours

    2. B

      Breaking work down ensures that no task will encounter a blocker

    3. C

      A completion rate is more informative when the counted tasks are roughly comparable in size

    4. D

      Similar task sizes make it possible to avoid maintaining a backlog

    Correct answer
    C

    A completion rate is more informative when the counted tasks are roughly comparable in size

    Explanation

    If tasks are roughly similar in size, the number completed over time is a more useful basis for estimating the duration of additional work.

  32. 32

    When estimating a feature using the task-count approach, what does the team estimate?

    1. A

      How many roughly similar tasks the feature will break into

    2. B

      How many releases the organization will make that year

    3. C

      How many bugs the feature will contain after launch

    4. D

      How many hours each individual will spend in meetings

    Correct answer
    A

    How many roughly similar tasks the feature will break into

    Explanation

    Instead of estimating abstract story points, the team estimates how many tasks of roughly a few days each make up the item.

  33. 33

    How can a team estimate the duration of a project using task counts and throughput?

    1. A

      Add the number of meetings to the number of features

    2. B

      Estimate the total number of tasks and compare it with the team's task completion rate

    3. C

      Use the longest task's duration as the estimate for the whole project

    4. D

      Multiply the backlog size by the number of developers without measuring flow

    Correct answer
    B

    Estimate the total number of tasks and compare it with the team's task completion rate

    Explanation

    The team estimates how many tasks the work contains, totals them, and uses the observed completion rate to estimate how long that work may take.

  34. 34

    How can a team assess whether work is likely to meet a due date?

    1. A

      Estimate the tasks due by that date, use the completion rate to estimate duration, and compare the result with the date

    2. B

      Assume the date is achievable if the work has been prioritized

    3. C

      Compare the due date with the number of items currently in validation only

    4. D

      Count the number of tasks assigned to the most experienced developer

    Correct answer
    A

    Estimate the tasks due by that date, use the completion rate to estimate duration, and compare the result with the date

    Explanation

    The team estimates how much task work is required, applies its observed rate, and compares the resulting duration with the available calendar time.

  35. 35

    Why does a completion rate reflect more than a team's theoretical working hours?

    1. A

      It excludes time spent on bugs, email, and other disruptions

    2. B

      It is based on work actually completed during the measured period

    3. C

      It measures only the tasks completed by the fastest developer

    4. D

      It assumes every person works without interruption

    Correct answer
    B

    It is based on work actually completed during the measured period

    Explanation

    Because the rate is based on actual completed work over time, it incorporates the real effects of team size, interruptions, weekends, and other factors during that period.

  36. 36

    What does the speaker suggest about task-size variation after work has been broken down?

    1. A

      Variation disappears, so every estimate becomes exact

    2. B

      The team should estimate only the largest task in the backlog

    3. C

      Some variation remains, but it tends to average out across many tasks

    4. D

      Any variation makes throughput unusable for planning

    Correct answer
    C

    Some variation remains, but it tends to average out across many tasks

    Explanation

    Tasks may still be larger or smaller than expected, but the speaker argues that modest variation tends to even out over many tasks.

  37. 37

    How should a team handle a trivial bug that takes only a few minutes to fix?

    1. A

      Fix it directly rather than creating a separate board item

    2. B

      Wait until the next release-planning meeting to prioritize it

    3. C

      Create a full project item and move it through every step

    4. D

      Add it to the backlog and leave it there until all other work is done

    Correct answer
    A

    Fix it directly rather than creating a separate board item

    Explanation

    The speaker distinguishes trivial fixes from substantial bugs: small fixes can be handled directly without adding board overhead.

  38. 38

    How should a team handle a substantial bug that requires significant design or implementation work?

    1. A

      Fix it immediately without considering other priorities

    2. B

      Create a work item, prioritize it, and move it through the usual steps

    3. C

      Record it only in the validation column

    4. D

      Ignore it until the next annual planning cycle

    Correct answer
    B

    Create a work item, prioritize it, and move it through the usual steps

    Explanation

    A large bug is treated like other meaningful work: it receives a board item, is prioritized, and flows through the team's steps.

  39. 39

    What did the speaker say happened to his teams' use of estimates after they became highly predictable?

    1. A

      They stopped tracking work on the Kanban board

    2. B

      They estimated less often because partners trusted the work's flow and focused on priority

    3. C

      They replaced task estimates with fixed sprint commitments

    4. D

      They began estimating every task in exact hours

    Correct answer
    B

    They estimated less often because partners trusted the work's flow and focused on priority

    Explanation

    The speaker said estimates became less common as the teams established a reputation for reliable delivery, and partners focused more on priority order.

  40. 40

    What is the purpose of a separate track column when a dependency blocks work?

    1. A

      To store work that is complete but awaiting a release celebration

    2. B

      To move low-priority tasks out of the backlog permanently

    3. C

      To make the blocked dependency visible and ensure someone drives its resolution

    4. D

      To count blocked items as additional implementation capacity

    Correct answer
    C

    To make the blocked dependency visible and ensure someone drives its resolution

    Explanation

    The track column highlights blocked dependencies and assigns responsibility for moving them toward an appropriate resolution.

  41. 41

    Who may be responsible for driving a blocked item in the track column?

    1. A

      The person who last completed a validation task

    2. B

      Only the person who requested the feature

    3. C

      An assigned person, such as the developer or a program manager

    4. D

      Every person in the organization at the same time

    Correct answer
    C

    An assigned person, such as the developer or a program manager

    Explanation

    The item is assigned to someone responsible for driving it forward; this may be the developer or a person who works across teams.

  42. 42

    Which action is one possible way to resolve a blocked dependency?

    1. A

      Increase every WIP limit so no one notices the blockage

    2. B

      Keep the item hidden until the other team finishes

    3. C

      Move the blocked item directly to done

    4. D

      Work around it, change expectations, or add the missing work to the backlog

    Correct answer
    D

    Work around it, change expectations, or add the missing work to the backlog

    Explanation

    The team may find a workaround, take on necessary dependency work, alter the feature or expectations, or adjust its priority.

  43. 43

    Do items in the example's track column count toward the regular WIP limits?

    1. A

      Yes, each track item counts in every step's WIP limit

    2. B

      Yes, but only if the item is assigned to a program manager

    3. C

      No, the track items do not add to the regular WIP limit

    4. D

      No, because the team does not discuss track items at stand-up

    Correct answer
    C

    No, the track items do not add to the regular WIP limit

    Explanation

    The speaker states that track tasks do not add to the WIP limit, allowing other work to continue while the blockage is handled.

  44. 44

    What should happen to a dependency item when it becomes unblocked?

    1. A

      It should re-enter the workflow in line with its high priority

    2. B

      It should return to the bottom of the backlog automatically

    3. C

      It should be closed without further implementation

    4. D

      It should remain in the track column until the next release

    Correct answer
    A

    It should re-enter the workflow in line with its high priority

    Explanation

    In the example, an unblocked item moves into the implementation step because it has been treated as the highest-priority work.

  45. 45

    How do daily stand-ups help manage tracked dependencies?

    1. A

      The team reviews the tracked items and discusses progress toward unblocking them

    2. B

      The team waits until the weekly release to discuss blockers

    3. C

      The team estimates every item in the backlog from scratch

    4. D

      The team assigns all future tasks to one person

    Correct answer
    A

    The team reviews the tracked items and discusses progress toward unblocking them

    Explanation

    The speaker says track tasks are discussed at each stand-up so the team can actively drive them toward resolution.

  46. 46

    If a team member cannot continue because a task is too large or blocked, what response does Kanban make visible?

    1. A

      The team should remove the task from the board until it becomes easier

    2. B

      The team should keep feeding more work into the blocked step

    3. C

      The team should assign the same blocked task to everyone permanently

    4. D

      The team can identify the stalled flow and swarm to help solve the problem

    Correct answer
    D

    The team can identify the stalled flow and swarm to help solve the problem

    Explanation

    WIP limits make stalled work apparent, prompting the team to investigate and, where useful, swarm to address the issue.

  47. 47

    When can a team release work that flows continuously through its steps?

    1. A

      Only after every item in the full backlog is complete

    2. B

      As soon as work leaves the breakdown step

    3. C

      Only on a fixed sprint-ending date

    4. D

      When the work has met the quality requirements for its steps and is ready for release

    Correct answer
    D

    When the work has met the quality requirements for its steps and is ready for release

    Explanation

    In the described approach, work is ready for its intended destination after passing the steps and their quality bars; release timing may still depend on coordination.

  48. 48

    How does the speaker's example handle a release that contains several related items?

    1. A

      It releases the launch as soon as its first item is complete

    2. B

      It releases only items that were completed in the same step

    3. C

      It waits until all items associated with that launch are complete

    4. D

      It delays each item until the entire backlog is done

    Correct answer
    C

    It waits until all items associated with that launch are complete

    Explanation

    For a coordinated launch, the team waits until all work items associated with that release are complete before shipping the collection.

  49. 49

    Does Kanban prescribe a fixed set of team roles?

    1. A

      Yes; every team must have a product owner, scrum master, and tester

    2. B

      No; teams are not allowed to assign responsibilities to individuals

    3. C

      No; teams may have natural or locally chosen roles, but Kanban does not require specific ones

    4. D

      Yes; only developers may move work between steps

    Correct answer
    C

    No; teams may have natural or locally chosen roles, but Kanban does not require specific ones

    Explanation

    The speaker describes Kanban as having no mandatory specified roles, while noting that teams may assign practical responsibilities.

  50. 50

    What is one practical responsibility a team member may take on in a Kanban team?

    1. A

      Facilitating the stand-up so the conversation stays focused

    2. B

      Estimating all work without consulting the team

    3. C

      Approving every change to the board as a Kanban authority

    4. D

      Preventing team members from working outside the board

    Correct answer
    A

    Facilitating the stand-up so the conversation stays focused

    Explanation

    The speaker describes a person who helps run the daily stand-up and keeps discussion from drifting too far off topic.

  51. 51

    Why might someone update a work-item tracking system in addition to the physical board?

    1. A

      To prevent stakeholders from seeing the team's priorities

    2. B

      To enforce a fixed set of Kanban roles

    3. C

      To share the board's status with people who rely on the tracking system

    4. D

      To replace the need to move items across the physical board

    Correct answer
    C

    To share the board's status with people who rely on the tracking system

    Explanation

    In the speaker's organization, someone transferred board updates to a broader tracking system so others could see the team's status.

  52. 52

    How may responsibilities for breakdown, implementation, and validation be distributed?

    1. A

      Only the team lead may perform breakdown and validation

    2. B

      Each step must belong to a separate, permanent department

    3. C

      People may specialize in steps, but any team member can contribute

    4. D

      Every team member must rotate roles at the end of each day

    Correct answer
    C

    People may specialize in steps, but any team member can contribute

    Explanation

    Team members may tend to focus on particular steps, but the speaker says any member can do the work; the arrangement can vary.

  53. 53

    Who acts as a product owner in the speaker's examples?

    1. A

      A formally required role always held by the stand-up facilitator

    2. B

      It varies by feature; a program manager or a team member may represent the need

    3. C

      The person who has been on the team the longest

    4. D

      The person who maintains the WIP spreadsheet

    Correct answer
    B

    It varies by feature; a program manager or a team member may represent the need

    Explanation

    The speaker says product ownership is not a fixed Kanban role; it may be represented by a program manager or a team member depending on the feature.

  54. 54

    When a WIP slot opens, how does the team generally select the next item to start?

    1. A

      It selects the item assigned to the least experienced person

    2. B

      It starts every item that is visible in the backlog

    3. C

      It pulls the next item in priority order

    4. D

      It chooses the newest item regardless of priority

    Correct answer
    C

    It pulls the next item in priority order

    Explanation

    When capacity becomes available, the team pulls the next work item according to the established priority order.

  55. 55

    Who is typically assigned a newly pulled task in the speaker's approach?

    1. A

      The project manager, regardless of the task's needs

    2. B

      The person who originally added it to the backlog

    3. C

      The available person, with initials sometimes recorded on the item

    4. D

      The team member with the most tasks already underway

    Correct answer
    C

    The available person, with initials sometimes recorded on the item

    Explanation

    The speaker says the available person usually takes the task, and teams may put that person's initials on the sticky to track ownership.

  56. 56

    Why might a team assign a task to an available person who is not yet the team's expert in that area?

    1. A

      To ensure that the expert has no role in reviewing the work

    2. B

      To avoid recording who is working on the item

    3. C

      To make the task take longer so the team can improve its estimates

    4. D

      To reduce dependence on a single person and build additional capability

    Correct answer
    D

    To reduce dependence on a single person and build additional capability

    Explanation

    The speaker prefers avoiding a single point of failure. A less experienced person can work with an expert who provides advice and reviews.

  57. 57

    How can a team help a less experienced assignee handle work in an area where another member is more qualified?

    1. A

      Delay the item until the expert has no other work

    2. B

      Have the more qualified person provide guidance and participate in reviews

    3. C

      Transfer all responsibility permanently to the expert

    4. D

      Remove the task from the board and resolve it informally

    Correct answer
    B

    Have the more qualified person provide guidance and participate in reviews

    Explanation

    The speaker suggests buddying: the assignee works on the task while the expert offers advice and participates in design or code reviews.

  58. 58

    How can Kanban support continuity on a longer project while still allowing flexible assignments?

    1. A

      The same person must own every task until the entire project is released

    2. B

      A stack of related tasks can let the same person continue, while the team can reassign work when flow requires it

    3. C

      Continuity is maintained by stopping all other team members from helping

    4. D

      Long projects must be divided into separate sprints with fixed membership

    Correct answer
    B

    A stack of related tasks can let the same person continue, while the team can reassign work when flow requires it

    Explanation

    Related tasks often form a stack that one person continues to pull from, but the team can adjust assignments if work is being held up.

  59. 59

    What is a useful team response when WIP limits reveal that work has stalled and some people have no available tasks?

    1. A

      Swarm around the problem by helping investigate or resolve it

    2. B

      Ignore the stalled item and increase the backlog

    3. C

      Create more upstream work so everyone remains busy

    4. D

      Move the stalled task directly to the done column

    Correct answer
    A

    Swarm around the problem by helping investigate or resolve it

    Explanation

    When a bottleneck leaves people idle, the team can swarm to the work by helping with analysis, breakdown, or coordination with other teams.

  60. 60

    How can a team handle an open-ended task when it cannot yet identify all the work involved?

    1. A

      Move the task directly to done once research starts

    2. B

      Break down what it can, begin working, and add newly discovered tasks to the backlog

    3. C

      Estimate an exact duration before allowing any work to proceed

    4. D

      Wait until every possible task has been identified before beginning

    Correct answer
    B

    Break down what it can, begin working, and add newly discovered tasks to the backlog

    Explanation

    For open-ended work, the team can break down what is currently understood, start, and add newly discovered work to the backlog as it emerges.

  61. 61

    What can a team do when a large feature is too complex to break down before substantial analysis?

    1. A

      Assign the feature permanently to the most senior developer

    2. B

      Put the entire feature into implementation without defining any work

    3. C

      Remove the feature from the board until its implementation plan is complete

    4. D

      Track research and design work as tasks, then use the resulting design to break down implementation

    Correct answer
    D

    Track research and design work as tasks, then use the resulting design to break down implementation

    Explanation

    The speaker describes treating research and preparation of a design document as work that flows through the board; once reviewed, the design supports implementation breakdown.

  62. 62

    What team size does the speaker say he generally prefers for the teams he has run with Kanban?

    1. A

      At least seventy people

    2. B

      Exactly two people

    3. C

      Between twenty and thirty people

    4. D

      About four to ten people

    Correct answer
    D

    About four to ten people

    Explanation

    Although larger examples exist, the speaker says his own teams have generally been in the range of four to ten people.

  63. 63

    What does the speaker identify as a practical advantage of cross-disciplinary Kanban teams?

    1. A

      All work can be assigned to a single specialist

    2. B

      Each discipline can avoid coordinating with the others

    3. C

      Different kinds of work can move through the same team's workflow

    4. D

      The team no longer needs validation steps

    Correct answer
    C

    Different kinds of work can move through the same team's workflow

    Explanation

    The speaker says Kanban works especially well in his experience with multidisciplinary teams, while noting that teams of one discipline can also use it.

  64. 64

    How many different disciplines has the speaker seen represented on a Kanban team?

    1. A

      Exactly one in every case

    2. B

      No more than two in any case

    3. C

      At least twenty in every case

    4. D

      Five or six in some examples

    Correct answer
    D

    Five or six in some examples

    Explanation

    The speaker says he has seen teams with five or six disciplines and that his own teams typically include around three.

  65. 65

    What does the speaker say about the number of steps a Kanban board can have?

    1. A

      Every board must have exactly three steps and a backlog

    2. B

      A board may have no more than four steps

    3. C

      The number of steps must match the number of team disciplines

    4. D

      The team can use as many steps as its workflow requires

    Correct answer
    D

    The team can use as many steps as its workflow requires

    Explanation

    The board is flexible: the example has three steps after the backlog, but teams can use more or fewer as appropriate.

  66. 66

    What supports changing a Kanban board when a team's workflow changes?

    1. A

      The board is a flexible arrangement of work items and columns, not a fixed structure

    2. B

      The board's steps are permanently set by the original project plan

    3. C

      Only a centralized Kanban authority can alter the board

    4. D

      Changes are allowed only during an annual review

    Correct answer
    A

    The board is a flexible arrangement of work items and columns, not a fixed structure

    Explanation

    The speaker notes that the board can be changed at any time; its layout is not treated as immutable.

  67. 67

    In the example of a very large Kanban team, what primarily takes time in the daily stand-up?

    1. A

      Assigning every person a new role for the day

    2. B

      Reading every task description aloud

    3. C

      Discussing issues and blocked items rather than repeating routine task status

    4. D

      Estimating every backlog item again

    Correct answer
    C

    Discussing issues and blocked items rather than repeating routine task status

    Explanation

    Because progress is visible on the board, the stand-up can focus on issues and blockers rather than reciting what everyone did or will do.

  68. 68

    How does the speaker describe adapting a waterfall team to Kanban?

    1. A

      Start tracking the existing work on a board and move through it in smaller batches

    2. B

      Stop testing until the whole project has been implemented

    3. C

      Require the team to adopt Scrum ceremonies before using a board

    4. D

      Replace the entire workflow with a new fixed set of roles immediately

    Correct answer
    A

    Start tracking the existing work on a board and move through it in smaller batches

    Explanation

    The transition described keeps familiar activities such as specification, implementation, and testing, while tracking work on a board and handling smaller batches.

  69. 69

    How does the speaker suggest that a Scrum team can begin adapting to Kanban?

    1. A

      Discard the backlog and allow developers to select any task

    2. B

      Replace every team member's responsibilities with a fixed Kanban role

    3. C

      Use a board and WIP limits while initially keeping familiar Scrum practices

    4. D

      Stop all existing meetings before introducing the board

    Correct answer
    C

    Use a board and WIP limits while initially keeping familiar Scrum practices

    Explanation

    The speaker recommends a gradual transition: add the board and WIP limits while allowing the team to keep its existing practices at first.

  70. 70

    Why might a team gradually stop holding some Scrum meetings after adopting Kanban?

    1. A

      Kanban prohibits teams from holding meetings

    2. B

      The board automatically performs every kind of team discussion

    3. C

      It may find that some ceremonies are no longer useful for managing its work

    4. D

      The team must eliminate all planning once WIP limits are set

    Correct answer
    C

    It may find that some ceremonies are no longer useful for managing its work

    Explanation

    The speaker describes teams keeping familiar meetings initially, then dropping those they find unnecessary as they become comfortable with the workflow.

  71. 71

    What is one flexibility the speaker emphasizes about using Kanban?

    1. A

      Every email and minor task must be tracked as a board item

    2. B

      Teams can handle small, quick work without necessarily putting every item on the board

    3. C

      The board must be followed identically by every team

    4. D

      Only work that has a fixed due date may enter the workflow

    Correct answer
    B

    Teams can handle small, quick work without necessarily putting every item on the board

    Explanation

    The speaker presents Kanban as a tool for managing substantial project work, not a rigid rule that requires every brief task to be tracked.

  72. 72

    How does the speaker describe coordinating Kanban work across a very large organization?

    1. A

      Combine high-level direction with ideas and technical needs raised by individual teams

    2. B

      Let the largest team determine all priorities without stakeholder input

    3. C

      Have every team independently choose the organization's overall product direction

    4. D

      Use one physical board to track every task across the organization

    Correct answer
    A

    Combine high-level direction with ideas and technical needs raised by individual teams

    Explanation

    The described process combines top-down themes and scenarios with bottom-up team proposals and technical opportunities, then determines what groups will focus on.

  73. 73

    How can large organizations coordinate timing and dependencies among teams in the speaker's example?

    1. A

      Use exact estimates before allowing teams to discuss dependencies

    2. B

      Combine all teams into one backlog with no team-level priorities

    3. C

      Require each team to work without seeing other teams' plans

    4. D

      Place team work on a shared timeline by team and discuss the resulting conflicts and adjustments

    Correct answer
    D

    Place team work on a shared timeline by team and discuss the resulting conflicts and adjustments

    Explanation

    The speaker describes a large board organized by time and team, where groups compare plans, discuss conflicts, and adjust alignment.

  74. 74

    How often does the speaker describe revisiting large-scale organizational planning?

    1. A

      The entire organization replans every day

    2. B

      The organization fixes its plans permanently for several years

    3. C

      Big planning happens periodically, with broader resets every few months and major planning about once a year

    4. D

      Every team must repeat the full large-scale planning process each week

    Correct answer
    C

    Big planning happens periodically, with broader resets every few months and major planning about once a year

    Explanation

    The speaker says large-scale planning can take months, with the major operation done about once a year and a broader reset every few months, while team-level ordering is revisited more often.