Dam Construction Process

  • 27Unfamiliar
  • 0Learning
  • 0Familiar
  • 0Mastered
Topic: Concrete and Formwork
The concrete poured before formwork assembly is called
because it does not require structural strength.

27 questions

  1. 1
    The concrete poured before formwork assembly is called
    _____
    because it does not require structural strength.
    Hint

    This concrete is used to improve work efficiency for formwork creation.

    Answer

    throwaway concrete

  2. 2
    During formwork assembly, the formwork is fixed with nails to
    _____
    that are fixed in place with concrete.
    Hint

    These are horizontal strips used to attach formwork panels.

    Answer

    battens

  3. 3
    To keep formwork vertical during assembly,
    _____
    are used.
    Hint

    These are driven into the ground to support the formwork.

    Answer

    reinforcing stakes

  4. 4
    After connecting formwork, holes are drilled and
    _____
    are installed for reinforcement.
    Hint

    These are inserted into the holes to provide a point for form ties.

    Answer

    plastic cones

  5. 5
    Form ties are attached to bolts on the
    _____
    protruding from the underside of the formwork.
    Hint

    These protrusions come from the cones installed in the formwork.

    Answer

    plastic cones

  6. 6
    A
    _____
    is used to tighten the form tie and steel pipe, preventing formwork warping.
    Hint

    This device uses a wedge mechanism to apply tension.

    Answer

    wedge-type backing plate

  7. 7
    A separator is a metal fitting that maintains a constant
    _____
    between opposing formwork pieces.
    Hint

    It ensures the formwork walls are parallel and evenly spaced.

    Answer

    distance

  8. 8
    The process of
    _____
    rounds off the edges of concrete to prevent chipping.
    Hint

    This is done to the concrete surface after formwork is in place.

    Answer

    facing

  9. 9
    To reinforce formwork against concrete pressure,
    _____
    is welded to the separator.
    Hint

    This steel bar is inserted into the concrete.

    Answer

    rebar

  10. 10
    After pouring concrete,
    _____
    is used to distribute it evenly and fill all parts of the formwork.
    Hint

    This technique uses mechanical shaking to settle the concrete.

    Answer

    vibration

  11. 11
    _____
    is placed between concrete pours to prevent cracks.
    Hint

    This material is inserted at joints in concrete structures.

    Answer

    Elastite

  12. 12
    Weed-proof concrete is used to cover soil, preventing weed growth and erosion; its surface is
    _____
    to prevent slipping.
    Hint

    The texture is intentionally made uneven.

    Answer

    roughened

  13. 13
    Once concrete has hardened to a certain extent, the surface is
    _____
    .
    Hint

    This step smoothens or textures the concrete top.

    Answer

    finished

  14. 14
    After formwork is dismantled, plastic cones are removed and the resulting holes are
    _____
    .
    Hint

    The voids left by the cones need to be filled.

    Answer

    repaired

  15. 15
    After the dam-type structure is completed, the excavated riverbed is
    _____
    .
    Hint

    The soil that was removed is replaced.

    Answer

    backfilled

  16. 16
    During construction, drainage pipes are installed to prevent flooding; after work, they are
    _____
    .
    Hint

    These pipes are temporary.

    Answer

    removed

  17. 17
    The dam-type structure prevents erosion of the riverbed, creating a
    _____
    environment.
    Hint

    It makes the area more resilient to natural disasters.

    Answer

    disaster-resistant

  18. 18
    For effective dirt removal, a high pressure water stream should be held at a
    _____
    to the surface.
    Hint

    The angle is 90 degrees.

    Answer

    right angle

  19. 19
    At the edge of the river, a path for water is created to prevent
    _____
    .
    Hint

    Without flow, water becomes still.

    Answer

    stagnation

  20. 20
    Sediment is removed from rivers to prevent
    _____
    because accumulated sediment impedes water flow.
    Hint

    During heavy rain, blocked flow can lead to overflow.

    Answer

    flooding

  21. 21
    Local residents have been mowing grass almost free of charge, but the financial and physical burden has become greater, so improvements are being
    _____
    .
    Hint

    The changes are put into action.

    Answer

    implemented

  22. 22
    Long arm parts are attachments that allow a hydraulic excavator to work
    _____
    and deeper.
    Hint

    It extends the reach from the machine.

    Answer

    farther

  23. 23
    During crane operation, the heavy machinery is lifted using a
    _____
    .
    Hint

    This is a strong cable made of twisted metal wires.

    Answer

    wire rope

  24. 24
    Before installing long arm parts, each part is
    _____
    .
    Hint

    The components are taken apart first.

    Answer

    disassembled

  25. 25
    After installing long arm parts, the bucket is
    _____
    .
    Hint

    The bucket is put back in place.

    Answer

    refitted

  26. 26
    Heavy machinery is transported to a designated
    _____
    for use.
    Hint

    It is moved to a specific place where it will be operated.

    Answer

    location

  27. 27
    Grass cutting on river bank slopes is done to improve
    _____
    .
    Hint

    It makes it easier to see the area.

    Answer

    visibility