Dam-Type Structure Construction for Erosion Control

Purpose and Background

A dam-type structure is built to prevent erosion of the riverbed caused by a tributary flowing next to the main river. The structure involves digging the riverbed deeper and creating concrete barriers to block tributaries. The work begins with pouring concrete that is not intended for structural strength but to improve work efficiency when assembling formwork — this is referred to as "throwaway concrete."

Concrete Pouring (Initial Stage)

  • The first layer of concrete is poured directly onto the excavated riverbed.

  • This concrete serves only as a working platform, not as a load-bearing element.

  • Key term: throwaway concrete — temporary concrete used solely to facilitate formwork assembly.

Formwork Assembly

  • Processed formwork is assembled on top of the previously poured concrete.

  • Formwork is fixed with nails to battens that are anchored into the throwaway concrete.

  • Reinforcing stakes are driven in to keep the formwork vertical during assembly.

  • Adjacent formwork sections are connected using the same fastening method.

  • Plastic cones are installed in drilled holes on the connected formwork for reinforcement.

  • Form ties are attached to bolts protruding from the plastic cones on the underside of the formwork.

Steel Pipe Installation

  • A wedge-type backing plate is used to tighten the form tie and steel pipe together.

  • This prevents the formwork from warping or shifting under the pressure of wet concrete during pouring.

  • The steel pipe and form tie system provide lateral stability.

Separator Installation

  • A separator is a metal fitting that maintains a constant distance between opposing formwork panels.

  • Once separators are installed on one side, the formwork on the opposite side is assembled in the same manner.

Facing and Edge Treatment

  • Rounding off the edges of the final concrete structure helps prevent chipping.

  • The facing refers to the exposed surface finish of the concrete.

Formwork Reinforcement with Rebar

  • Rebar inserted into the concrete is welded to the separator.

  • This creates a reinforced cage that can withstand the hydrostatic pressure of fresh concrete.

  • The reinforcement ensures structural integrity during and after pouring.

Final Concrete Pouring

  • Concrete is poured into the assembled formwork to form the permanent structure.

  • Vibration is applied to distribute the concrete evenly and fill every cavity in the formwork.

  • After the concrete hardens to a certain degree, the surface is finished smooth.

Dismantling and Post-Pour Work

  • Formwork is dismantled once the concrete has cured sufficiently.

  • The plastic cones are removed, and the resulting holes are repaired with mortar or concrete.

  • The holes are filled to create a uniform surface and prevent water ingress.

Backfilling and Completion

  • The excavated riverbed is backfilled around the completed dam-type structure.

  • Drainage pipes installed to keep the construction area dry are removed.

  • The final result: a deep dam-type structure allows the tributary to flow alongside it without affecting the main river, creating a disaster-resistant environment that prevents erosion and flooding.


Weed Prevention on Roadside Slopes and Waterways

Problem Context

  • Local residents traditionally mowed grass on roadside slopes and waterways for free.

  • Over time, the financial and physical burden of manual weeding became unsustainable.

  • The goal is to implement improvements that reduce maintenance effort.

Weed Removal

  • Accumulated weeds and sediment are cleared from waterways as a first step.

Elastite Placement

  • Elastite is a material inserted between concrete pours to prevent cracking due to thermal expansion or shrinkage.

  • It acts as a flexible joint, allowing controlled movement.

Pouring Weed-Proof Concrete

  • A layer of concrete is poured directly over the soil surface to physically block grass growth.

  • Concrete also prevents erosion caused by rainwater and stops soil from washing into waterways.

  • The concrete surface is roughened (e.g., by brooming) to create a non-slip surface for safety.

  • Result: slopes that were overgrown become concrete-covered, significantly reducing weed growth and management effort.

  • Sediment accumulation in waterways (important for crop irrigation) is also reduced.

Long-Term Benefit

  • Local residents can now maintain clean slopes and waterways without strenuous manual labor.


High-Pressure Washing for Surface Restoration

Preparation Work

  • Water tank and water source are connected; a water hose is attached.

  • Ensure adequate water supply and pressure for the washing unit.

High-Pressure Washing Process

  • A high-pressure stream of water is sprayed onto the dirty surface.

  • The force removes dirt, algae, mold, and other buildup.

  • For effective removal, the nozzle is held at a right angle (90°) to the surface — this tangentially loosens contaminants.

Results and Effectiveness

  • The cleaned surface is restored to its condition from 10 years ago.

  • The dramatic before-and-after contrast demonstrates the power and effectiveness of high-pressure washing for restoring concrete, stone, or other hard surfaces.


Heavy Machinery Transportation and River Maintenance

Loading and Unloading Heavy Equipment

  • Heavy machinery is loaded onto transport vehicles and moved to the designated work site.

  • Equipment is carefully loaded and unloaded to ensure safety.

Attachment Parts Installation for Excavators

  • Disassembly of existing parts (e.g., standard arm, bucket).

  • Installation of long arm parts — an attachment that extends the arm of a hydraulic excavator.

  • Purpose: allows the excavator to work farther and deeper into the river channel or slope.

  • The bucket is reattached after the long arm is installed.

Grass Cutting on River Bank Slopes

  • Vegetation on river bank slopes is cut to improve visibility and make subsequent work easier and safer.

Crane Operation for Heavy Lifting

  • Wire rope is hung from the crane.

  • The crane lifts heavy machinery (e.g., excavator) and lowers it to the river bottom for in-channel work.

Creating Water Passages (Crane Storage Pathway)

  • At the edge of the river, a path is created to allow water to pass through.

  • This prevents water stagnation, ensuring that aquatic organisms have access to flowing water.

River Sediment and Debris Removal

  • Tree branches that have piled up in the river are removed.

  • Sediment and weeds accumulated in the riverbed are excavated and removed.

  • Accumulated sediment impedes water flow, causing water levels to rise and increasing flood risk.

  • Removal work must be done quickly, especially in preparation for the rainy season.

  • Excavated weeds and soil are transported away from the site.

Scale and Importance

  • At the described site, sediment is removed from a one-kilometer stretch of river.

  • Work continues for several weeks, with repeated cycles of removal and transport.

  • This process is an effective means of flood prevention in Japan, where heavy rainfall and flooding are common.

  • Civil engineering works like these play a critical role in keeping communities safe from natural disasters.