Topic: Concrete Pouring and Formwork

What is the primary purpose of pouring 'throwaway concrete' during dam construction?

28 questions

  1. 1

    What is the primary purpose of pouring 'throwaway concrete' during dam construction?

    1. A

      To prevent erosion of the riverbed permanently

    2. B

      To block tributaries from flowing into the main river

    3. C

      To improve work efficiency when creating formwork

    4. D

      To provide structural strength to the dam

    Correct answer
    C

    To improve work efficiency when creating formwork

    Explanation

    The content states that the concrete is poured to improve work efficiency when creating formwork, and it is called 'throwaway concrete' because it does not require structural strength.

  2. 2

    Why is the poured concrete referred to as 'throwaway concrete'?

    1. A

      It is discarded after the formwork is removed

    2. B

      It is used only for temporary erosion control

    3. C

      It is made from low-quality materials

    4. D

      It does not need to meet structural strength requirements

    Correct answer
    D

    It does not need to meet structural strength requirements

    Explanation

    The content explains that because it does not require structural strength, it is called 'throwaway concrete.'

  3. 3

    How is the formwork fixed in place during assembly?

    1. A

      By bolting it directly to the ground

    2. B

      By using adhesive glue on the concrete surface

    3. C

      By nailing it to battens that are fixed with concrete

    4. D

      By welding it to the reinforcement bars

    Correct answer
    C

    By nailing it to battens that are fixed with concrete

    Explanation

    The content says: 'The formwork is fixed with nails to the battens fixed in place with concrete.'

  4. 4

    What is the function of reinforcing stakes in formwork assembly?

    1. A

      To connect the formwork pieces together

    2. B

      To keep the formwork vertical

    3. C

      To provide a surface for nailing

    4. D

      To hold the plastic cones in place

    Correct answer
    B

    To keep the formwork vertical

    Explanation

    The content states: 'Use reinforcing stakes to keep the formwork vertical.'

  5. 5

    What is the purpose of installing plastic cones in the formwork?

    1. A

      To create decorative patterns on the concrete surface

    2. B

      To allow drainage of water from concrete

    3. C

      To provide reinforcement and anchor points for form ties

    4. D

      To serve as spacers for reinforcement bars

    Correct answer
    C

    To provide reinforcement and anchor points for form ties

    Explanation

    The content says: 'Drill holes in the connected formwork and install plastic cones for reinforcement. Attach form ties to the bolts on the plastic cones protruding from the underside of the formwork.'

  6. 6

    What device is used to tighten the form tie and steel pipe, preventing formwork movement?

    1. A

      A wedge-type backing plate

    2. B

      A clamp with a screw mechanism

    3. C

      A hydraulic tensioner

    4. D

      A hexagonal nut and bolt

    Correct answer
    A

    A wedge-type backing plate

    Explanation

    The content mentions: 'A wedge-type backing plate is used to tighten the form tie and steel pipe.'

  7. 7

    What is the role of the separator in formwork construction?

    1. A

      To prevent water from entering the formwork

    2. B

      To maintain a constant distance between opposing formwork pieces

    3. C

      To separate the formwork from the concrete

    4. D

      To act as a lifting point for the formwork

    Correct answer
    B

    To maintain a constant distance between opposing formwork pieces

    Explanation

    The content states: 'This separator is a metal fitting used to maintain a constant distance between opposing formwork pieces.'

  8. 8

    Why are the edges of concrete rounded off during facing?

    1. A

      To prevent the concrete from chipping

    2. B

      To reduce the weight of the structure

    3. C

      To improve the aesthetic appearance

    4. D

      To allow easier formwork removal

    Correct answer
    A

    To prevent the concrete from chipping

    Explanation

    The content says: 'Rounding off the edges of the concrete will help prevent it from chipping.'

  9. 9

    What is the purpose of welding rebar to the separator?

    1. A

      To provide electrical grounding

    2. B

      To allow the separator to be reused

    3. C

      To reinforce the formwork against concrete pressure

    4. D

      To connect the formwork to the ground

    Correct answer
    C

    To reinforce the formwork against concrete pressure

    Explanation

    The content states: 'The rebar inserted into the concrete is welded to the separator, reinforcing it so that it can withstand the pressure of the concrete.'

  10. 10

    Why is vibration used during concrete pouring?

    1. A

      To compact the concrete and increase its strength

    2. B

      To accelerate the hardening process

    3. C

      To remove air bubbles from the concrete mix

    4. D

      To distribute concrete evenly and fill all spaces in the formwork

    Correct answer
    D

    To distribute concrete evenly and fill all spaces in the formwork

    Explanation

    The content says: 'Vibration is used to distribute the concrete evenly and ensure that every nook and cranny of the formwork is thoroughly filled.'

  11. 11

    What is done with the holes left after removing plastic cones?

    1. A

      They are repaired

    2. B

      They are left open for drainage

    3. C

      They are filled with concrete

    4. D

      They are covered with formwork

    Correct answer
    A

    They are repaired

    Explanation

    The content states: 'Removing the plastic cone. Repair holes in plastic cones.' (The holes are repaired.)

  12. 12

    After the dam structure is completed, what is done with the excavated riverbed?

    1. A

      It is left as is to allow natural flow

    2. B

      It is backfilled

    3. C

      It is lined with concrete

    4. D

      It is used as a drainage channel

    Correct answer
    B

    It is backfilled

    Explanation

    The content says: 'Work will be carried out to backfill the riverbed that was excavated to create the structure.'

  13. 13

    Why are drainage pipes removed after dam construction?

    1. A

      To prevent clogging

    2. B

      To allow water to flow freely into the dam

    3. C

      They are no longer needed to prevent flooding

    4. D

      To recycle the pipes for other projects

    Correct answer
    C

    They are no longer needed to prevent flooding

    Explanation

    The content states: 'The drainage pipes that were installed to prevent the construction area from flooding are removed, and the work is now complete.'

  14. 14

    What benefit does the dam structure provide to the main river?

    1. A

      It prevents the main river from being affected by tributary flow

    2. B

      It creates a reservoir for irrigation

    3. C

      It diverts all water to the tributary

    4. D

      It increases the water flow in the main river

    Correct answer
    A

    It prevents the main river from being affected by tributary flow

    Explanation

    The content says: 'This has resulted in the main river side being unaffected by the water flow, creating a disaster-resistant environment.'

  15. 15

    What is 'Elastite' used for in weed control?

    1. A

      To prevent cracks in concrete when poured

    2. B

      To provide a rough surface for traction

    3. C

      To cover the soil and block grass growth

    4. D

      To kill weeds chemically

    Correct answer
    A

    To prevent cracks in concrete when poured

    Explanation

    The content states: 'Elastite placement: By inserting it between the concrete when pouring, it prevents cracks.'

  16. 16

    What is the main purpose of pouring weed-proof concrete?

    1. A

      To absorb excess water from the soil

    2. B

      To provide a smooth surface for walking

    3. C

      To improve soil fertility

    4. D

      To physically prevent grass growth and reduce erosion

    Correct answer
    D

    To physically prevent grass growth and reduce erosion

    Explanation

    The content says: 'By covering the soil with concrete, you physically prevent grass from growing. In addition, concrete can prevent erosion...'

  17. 17

    Why is the surface of weed-proof concrete roughened?

    1. A

      To improve water absorption

    2. B

      To make it more durable

    3. C

      To prevent slipping

    4. D

      To discourage weed growth

    Correct answer
    C

    To prevent slipping

    Explanation

    The content states: 'The concrete surface is roughened to prevent slipping.'

  18. 18

    At what angle should a high-pressure water stream be held to effectively loosen dirt?

    1. A

      At a right angle to the surface

    2. B

      At any angle; it does not matter

    3. C

      Parallel to the surface

    4. D

      At a 45-degree angle

    Correct answer
    A

    At a right angle to the surface

    Explanation

    The content says: 'the high pressure water stream is held at a right angle to the surface, which effectively loosens the dirt.'

  19. 19

    What does high-pressure washing remove from surfaces?

    1. A

      Dirt, algae, and mold

    2. B

      Only loose debris

    3. C

      Concrete and mortar

    4. D

      Paint and coatings

    Correct answer
    A

    Dirt, algae, and mold

    Explanation

    The content states: 'The force of the water stream removes dirt, algae, mold, etc.'

  20. 20

    What is the function of the long arm attachment on a hydraulic excavator?

    1. A

      To allow the excavator to operate underwater

    2. B

      To increase lifting capacity

    3. C

      To reduce fuel consumption

    4. D

      To extend the reach for farther and deeper work

    Correct answer
    D

    To extend the reach for farther and deeper work

    Explanation

    The content says: 'This is an attachment that extends the arm of a hydraulic excavator, allowing it to work farther and deeper.'

  21. 21

    Why is grass cut on river bank slopes?

    1. A

      To prevent soil erosion

    2. B

      To improve visibility for work

    3. C

      To promote new grass growth

    4. D

      To provide feed for livestock

    Correct answer
    B

    To improve visibility for work

    Explanation

    The content states: 'We cut grass on the river bank slopes to improve visibility and make work easier.'

  22. 22

    How is heavy machinery lowered to the river bottom?

    1. A

      By using a crane with wire rope

    2. B

      By disassembling and reassembling it

    3. C

      By lowering it with a winch and pulleys

    4. D

      By driving it down a ramp

    Correct answer
    A

    By using a crane with wire rope

    Explanation

    The content says: 'Crane operation. Hanging the wire rope. Lift the heavy machinery and lower it to the river bottom.'

  23. 23

    Why is a path for water created at the edge of the river?

    1. A

      To reduce erosion of the riverbank

    2. B

      To direct water to irrigation canals

    3. C

      To prevent water stagnation and ensure organisms have water

    4. D

      To allow boats to pass

    Correct answer
    C

    To prevent water stagnation and ensure organisms have water

    Explanation

    The content states: 'Create a path for water to pass at the edge of the river. This prevents water from stagnating, ensuring that living organisms have access to water.'

  24. 24

    Why is sediment removal from rivers important before the rainy season?

    1. A

      To harvest sand and gravel for construction

    2. B

      To improve water quality for drinking

    3. C

      To prevent increased flood risk due to impeded water flow

    4. D

      To clear space for recreational activities

    Correct answer
    C

    To prevent increased flood risk due to impeded water flow

    Explanation

    The content says: 'Sediment accumulated in rivers impedes the flow of water, causing water levels to rise and increasing the risk of flooding. Therefore, removal work needs to be carried out quickly in preparation for the rainy season.'

  25. 25

    Over what distance was sediment removed in the described river project?

    1. A

      2 kilometers

    2. B

      500 meters

    3. C

      5 kilometers

    4. D

      1 kilometer

    Correct answer
    D

    1 kilometer

    Explanation

    The content states: 'At this site, sediment will be removed from a one kilometre stretch of river.'

  26. 26

    How long does the sediment removal work typically last?

    1. A

      An entire year

    2. B

      Several weeks

    3. C

      A few days

    4. D

      A few months

    Correct answer
    B

    Several weeks

    Explanation

    The content says: 'the work continuing for several weeks with repeated removal and transport.'

  27. 27

    What is the purpose of the dam structure described in the content?

    1. A

      To create a reservoir for drinking water

    2. B

      To generate hydroelectric power

    3. C

      To provide a crossing for vehicles

    4. D

      To prevent erosion of the riverbed from a tributary

    Correct answer
    D

    To prevent erosion of the riverbed from a tributary

    Explanation

    The content begins by explaining that the dam structure will prevent erosion of the riverbed, addressing the risk from a tributary.

  28. 28

    What is the initial step before pouring throwaway concrete?

    1. A

      Welding rebar to separators

    2. B

      Installing plastic cones

    3. C

      Excavating the riverbed deeper

    4. D

      Assembling formwork

    Correct answer
    C

    Excavating the riverbed deeper

    Explanation

    The content says: 'To address this risk, the riverbed will be dug deeper and concrete structures will be created to block the tributaries across the river.' The pouring of concrete follows this excavation.

Question 1 of 28
Question 1 of 28

Ask anything

We've read this whole study set, so questions about it get the best answers.

FlashcardsQuizFill in the blanksWritten testLessonNotesPodcastContent