Dam Construction Process

  • 31Unfamiliar
  • 0Learning
  • 0Familiar
  • 0Mastered
Topic: Dam Construction Overview

What is the primary purpose of the dam structure being created?

31 questions

  1. 1

    What is the primary purpose of the dam structure being created?

    Model answer

    To prevent erosion of the riverbed.

    Explanation

    The dam structure is built to protect the riverbed from erosion caused by water flow, particularly from a tributary.

  2. 2

    Why was it necessary to dig the riverbed deeper and create concrete structures?

    Model answer

    A tributary flowing next to the main river could cause erosion of the riverbed.

    Explanation

    To address this risk, the riverbed was dug deeper and concrete structures were built to block the tributary.

  3. 3

    What is 'throwaway concrete' and why is it used?

    Model answer

    It is concrete used to improve work efficiency when creating formwork, without requiring structural strength.

    Explanation

    This concrete is called 'throwaway' because it is not designed for load-bearing; it serves as a temporary base for formwork assembly.

  4. 4

    What is done after the dam-type structure is completed?

    Model answer

    Backfill the riverbed that was excavated and remove the drainage pipes.

    Explanation

    After the structure is finished, the excavated riverbed is backfilled, and drainage pipes used to prevent flooding are removed.

  5. 5

    What benefit does the deep dam-type structure provide?

    Model answer

    The tributary flows alongside the deep structure, leaving the main river unaffected and creating a disaster-resistant environment.

    Explanation

    By directing the tributary away from the main river, the structure reduces erosion risk and enhances disaster resilience.

  6. 6

    How is formwork fixed in place?

    Model answer

    Formwork is fixed with nails to battens that are fixed in place with concrete.

    Explanation

    The battens are embedded in concrete, and formwork panels are nailed to these battens for stability.

  7. 7

    What is used to keep formwork vertical?

    Model answer

    Reinforcing stakes.

    Explanation

    These stakes are driven into the ground to support the formwork and maintain its vertical alignment.

  8. 8

    What is the purpose of plastic cones in formwork?

    Model answer

    They are installed in drilled holes for reinforcement and to attach form ties.

    Explanation

    Plastic cones are inserted into holes drilled in connected formwork, and form ties are attached to bolts protruding from them.

  9. 9

    How are form ties attached to plastic cones?

    Model answer

    Form ties are attached to the bolts on the plastic cones protruding from the underside of the formwork.

    Explanation

    After drilling holes and installing plastic cones, the bolts on the cones provide attachment points for form ties.

  10. 10

    What is the function of a wedge-type backing plate?

    Model answer

    It tightens the form tie and steel pipe to prevent the formwork from warping or shifting due to concrete pressure.

    Explanation

    The wedge-type backing plate is used with the steel pipe to secure the formwork against the pressure of poured concrete.

  11. 11

    What is a separator in formwork?

    Model answer

    A metal fitting used to maintain a constant distance between opposing formwork pieces.

    Explanation

    Separators ensure that the formwork remains aligned and at a consistent spacing during concrete pouring.

  12. 12

    Why is the facing (rounding edges) of concrete done?

    Model answer

    To prevent the concrete from chipping.

    Explanation

    Rounding off the edges reduces stress concentrations that can lead to chipping or cracking.

  13. 13

    How is formwork reinforced to withstand concrete pressure?

    Model answer

    Rebar inserted into the concrete is welded to the separator.

    Explanation

    Welding rebar to the separator adds structural strength to the formwork system, helping it resist the pressure of wet concrete.

  14. 14

    What method is used to distribute concrete evenly during pouring?

    Model answer

    Vibration.

    Explanation

    Vibration helps the concrete flow into all nooks and crannies of the formwork, ensuring even distribution and full filling.

  15. 15

    What is done to the concrete surface after it has hardened to a certain extent?

    Model answer

    The surface is finished.

    Explanation

    Finishing smooths and shapes the surface of the hardened concrete.

  16. 16

    What is done with plastic cones during formwork dismantling?

    Model answer

    The plastic cones are removed and the holes are repaired.

    Explanation

    After the concrete hardens, the cones are taken out and the holes left behind are patched to restore the surface.

  17. 17

    Why is weed removal by residents a concern?

    Model answer

    It creates a financial and physical burden on residents who mow grass for free.

    Explanation

    Residents have been voluntarily mowing weeds, but the cost and effort are becoming too great, prompting improvements.

  18. 18

    What is elastite and its purpose in concrete?

    Model answer

    Elastite is a material inserted between concrete during pouring to prevent cracks.

    Explanation

    It acts as a crack prevention measure by being placed at strategic locations before concrete is poured.

  19. 19

    What are the benefits of weed-proof concrete?

    Model answer

    It physically prevents grass growth, prevents erosion from rainwater, stops soil from flowing into waterways, and its roughened surface prevents slipping.

    Explanation

    Weed-proof concrete covers soil to block grass, reduces erosion, keeps sediment out of waterways, and provides a non-slip surface.

  20. 20

    What is the effect of covering roadside slopes with concrete?

    Model answer

    It prevents weed growth, makes management easier, and reduces accumulation of sediment in waterways.

    Explanation

    Concreting slopes stops weeds from growing, simplifying maintenance, and prevents soil erosion that would otherwise fill waterways.

  21. 21

    How should a high-pressure water stream be held to effectively remove dirt?

    Model answer

    At a right angle to the surface.

    Explanation

    Holding the stream at 90 degrees to the surface uses the force of the water to effectively loosen and remove dirt, algae, and mold.

  22. 22

    What result was achieved after the high-pressure cleaning?

    Model answer

    The surface was restored to its glory from 10 years ago.

    Explanation

    The dramatic contrast before and after demonstrated the effectiveness of high-pressure washing in restoring the original appearance.

  23. 23

    What is the purpose of a long arm attachment for a hydraulic excavator?

    Model answer

    It extends the arm to allow working farther and deeper.

    Explanation

    The long arm attachment increases reach, enabling the excavator to access areas that would otherwise be out of range.

  24. 24

    Why is grass cut on river bank slopes?

    Model answer

    To improve visibility and make work easier.

    Explanation

    Cutting grass clears the view for workers and simplifies subsequent tasks on the slopes.

  25. 25

    What is the purpose of the crane operation in this context?

    Model answer

    To lift heavy machinery and lower it to the river bottom.

    Explanation

    The crane uses a wire rope to hoist equipment and place it precisely at the riverbed.

  26. 26

    Why is a path for water created at the edge of the river during crane storage?

    Model answer

    To prevent water stagnation and ensure living organisms have access to water.

    Explanation

    Creating a water path maintains flow, avoiding stagnant conditions and supporting aquatic life.

  27. 27

    What is done with tree branches that have accumulated in the river?

    Model answer

    They are removed.

    Explanation

    Removing tree branches helps maintain water flow and prevent blockages that could contribute to flooding.

  28. 28

    Why is sediment removal from rivers important?

    Model answer

    Sediment impedes water flow, causing water levels to rise and increasing the risk of flooding.

    Explanation

    Accumulated sediment reduces river capacity, so removing it helps prevent flooding.

  29. 29

    When does sediment removal need to be carried out?

    Model answer

    Before the rainy season.

    Explanation

    Removal is done quickly in advance of rains to mitigate flood risk during the wet period.

  30. 30

    How long is the stretch of river being cleaned in this project?

    Model answer

    One kilometre.

    Explanation

    The sediment removal work covers a one-kilometre stretch over several weeks.

  31. 31

    Why is civil engineering work important in Japan according to the content?

    Model answer

    Because flooding is common and civil engineering works provide disaster prevention and keep people safe.

    Explanation

    In Japan, where flooding is frequent, civil engineering projects like river maintenance and dam construction are crucial for safety.